SANS 10120-5 MF-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section MF B.pdf
《SANS 10120-5 MF-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section MF B.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 MF-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section MF B.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 a Part 5 Section MF-1981 Base PART 5 : CONTRACT ADMINlSTRATION SECTION MF CONTENTS Clause Page Number START OF CONSTRUCTION . l General . 1 IMM
4、EDIATELY AFTER THE HANDING OVER OF THE SITE I Sources of Material Supply I . DURING CONSTRUCTION I . Methods of Construction I Non-plastic gravel I Maximum size I Addition of binder I Compaction against kerbs I Single size crushed stone base (waterbound macadam base) I Administration I Target gradin
5、g I . Problems with aggregates and gravel I Aggregate pH 2 Aggregate PI 2 Protection and maintenance 2 QUALITY CONTROL AND OTHER CONSIDERATIONS . ; 2 SABS 0120 8 Part 5 Section MF-1981 Base SABS 1200 MF : BASE NOTE: The clause number(s) given at the beginning or after the heading of a clause is/are,
6、 unless otherwise stated, the number(s) of the relevant clause(s) of SABS 1200 MF. START OF CONSTRUCTION GENERAL. For the purposes of this part of the code contract administration starts with instructions to the contractor to commence work as set out in Subclause 4.1 of Section 0. SOURCES OF MATERIA
7、L SUPPLY. The recommendations given in Subclause 2.1 of Section ME are applicable to this sect ion. DURING CONSTRUCTION METHODS OF CONSTRUCTION Non-Plastic Gravel (Subclause 5.4.4). Coarse gravel containing non-plastic or slightly plastic soil fines and used.in the construction of a gravel base will
8、 usually require slushing and rolling in addition to the compaction specified to enable a firm. well-knit surface to be obtained. In such a case. after being processed and compacted as specified in Subclause 5.4.4 of SABS 1200 MF. the base should be well watered over short sections at a time and slu
9、shed and rolled with compactors andlor heavy flat wheel rollers of mass at least 12 t. Watering and rolling should continue over a section until all excess fines have been brought to the surface of the layer. Such excess fines should be uniformly distributed over the surface of the layer by means of
10、 stiff brooms, and watering, rolling. and brooming should continue until all areas deficient in fines have been suitably corrected. Finally. all excess fines should be removed Erom the surface of the layer. Maximum Size (Subclauses 3.3.l(a) and 3.3.2(a). In order to ensure optimum workability of the
11、 material, the maximum size of. stones should, if possible, not exceed one-third of the thickness of the layer. Addition of Binder_ (Subclause 5.4.2(c). Where a binder material is to be added to the base material, between 30 X and 50%. as directed, of the required amount of gravel should be dumped o
12、nto the road and spread over its full width. The binder material should then be dumped on top of the gravel, spread, and intimately mixed with the gravel until a uniform mixture is obtained. The remainder of the gravel should then be brought onto the road and mixed with the material containing the b
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205MF1981CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONMFBPDF

链接地址:http://www.mydoc123.com/p-1028619.html