SANS 10120-3 LC-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section LC Cable.pdf
《SANS 10120-3 LC-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section LC Cable.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-3 LC-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 3 Guidance for design Section LC Cable.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 3 Section LC-1981 Cable ducts PART 3 : GUIDANCE POK DESIGN SECTION LC CONICWS Clause Past Number - PRE-TENDER CONSIDEIUIIONS Investigati
4、ons . Records of existing cable ducts and cables . Co-operation with controlling autIority/electricaL engineer Administration . Arrangements to initiate construction As-Built drawings Oocunentation Selection of specifications Cable ducts at road intersections Undesirable combinations of duct and cab
5、le coating . Trench widths Road crossings . Drawings . Records of services Elulti-disciplinary projects DESIGN RE(/UIRl2lENTS Lntersections Materials for Power Ducts Trench Widths for Power Cables . Concrete Encasement APPLICABILITY OF OTHER CODES AND SPECIFICATIONS TEST PROCEDURES Compactibility Fa
6、ctor for Bedding QlJALILY CONTROL AN11 OTHER CONSIDEMIIONS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . Disputes, Mediarions, Arbitrations, and Court Cases Compaction . 1)LUWI NES Urawing LC-3.1 - Typical Concrete Encasenent of Different Sizes of Pipe Ducts for Cable
7、s November 1981 Approved by .he COUNCIL OF THE SOUTl1 AFRICAN BUREAU OF STANDARDS SAW!; 0120 : fart 3 Sect ion 1.C-1981 Cable ducts NOTE: The clause number(s) given at the beginning or after the heading of a clause is/are, unless otherwise ntated, the nnmber(s) of the relevant clause(s) or SAUS 1200
8、 LC. PRE-TIINI)ER CONS1I)ISKAI LONS Records of Kxisting C:ible hcts and C-. Seek out plans or records that disclose the cxistence. location, and depth of cable ducts and cables within the areas that will he aEfected by eowtruction work. Co-operation with ControL1i=1thority/ElectricaL Engineer. Ascer
9、tain the identity of the controlling authority or the consulting electrical engineer concerned and determine the requirements in regard to the cables to be laid on the works and through the cable ducts. (See also 1.3.8 below.) Arrangements to Initiate Cons true=. After designs. drawings, and the pre
10、paration of a11 other - -p- docnmentation raqulred Eor the calling ot tenders have been completed and tenders Iiave been invited, deal with the site inspection and adjudicate and report on tenders received, as more fully set out in Subclarse 7.1 of Section 0. As-hilt Draw=. Ensure that arrangements
11、are made For the designer to produce .W-built drawings -p- of the finished work if this ip not to be done by the contractor. (See 1.3.7 below.) Selection of Specif ications (Subclause 2.1) Except wherr cnhle ducts are to be laid as part of a contract that includes SARS 1200 A, SAHS 1200 AA will cove
12、r the requirements. Where site clearance is to be carried out by the contractor, include SABS 1200 C in the contract. Where work is to be put out to contract hy the GPO, the reqiremants of the latest issue oE SAW Specification 325) will apply. Cable lucts at Road Intersect iow. Cab Le routes are ess
13、entially straight lines from drdw pit to draw pit. Position ducts under road intersectiorrj to make this possible. A typical GPO requirement is as 01 lows : 1.3.3 Undesirable Cnnbinatio OF Duct and Cahle Coating (Subclawe 5.7) 1.3.3.1 Where cables are insulated on the outside with bituminous materia
14、l, do not specify pitch-impregnated fibre pipes for duct work because the bitumen may so adhere to the pitch in the pipe that eventually it will be impossible to withdraw the cable. 1.3.3.2 Where cahles are cwered with hessian or jute serving, do not specify PVC or pitch-impregnated fibre pipes for
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101203LC1981CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART3GUIDANCEFORDESIGNSECTIONLCCABLEPDF

链接地址:http://www.mydoc123.com/p-1028533.html