SAE AS 6332-2017 Aircraft Ground Deicing Anti-icing Quality Management.pdf
《SAE AS 6332-2017 Aircraft Ground Deicing Anti-icing Quality Management.pdf》由会员分享,可在线阅读,更多相关《SAE AS 6332-2017 Aircraft Ground Deicing Anti-icing Quality Management.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、 _ SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising ther
2、efrom, is the sole responsibility of the user.” SAE reviews each technical report at least every five years at which time it may be revised, reaffirmed, stabilized, or cancelled. SAE invites your written comments and suggestions. Copyright 2017 SAE International All rights reserved. No part of this
3、publication may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE. TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada) Tel: +1 724-776-49
4、70 (outside USA) Fax: 724-776-0790 Email: CustomerServicesae.org SAE WEB ADDRESS: http:/www.sae.org SAE values your input. To provide feedback on this Technical Report, please visit http:/standards.sae.org/AS6332 AEROSPACE STANDARD AS6332 Issued 2017-08 Aircraft Ground Deicing/Anti-icing Quality Man
5、agement RATIONALE This document provides industry standards and guidance for the management of quality systems and processes for the effective deicing and anti-icing of aircraft on the ground. It forms one part of three related SAE Aerospace Standards (AS) and should be read in conjunction with AS62
6、85 Aircraft Ground Deicing/Anti-icing Processes and AS6286 Training and Qualification Program for Deicing/Anti-Icing of Aircraft on the Ground. Collectively AS6285, AS6286, and AS6332 are known to the international community as the “Globalized Aircraft Deicing Standards”. Exposure to weather conditi
7、ons conducive to ice formation can cause the accumulation of frost, snow, slush and ice on aircraft surfaces and components. These contaminants can adversely affect aircraft performance, stability and control, plus the operation of mechanical devices such as control surfaces, sensors, flaps and land
8、ing gear. If frozen deposits are present other than those considered in the aircraft certification process, the performance and safety of the aircraft may be compromised. Regulations governing aircraft operations in ground icing conditions shall be followed. ICAO Annex 6, Part I and Annex 14, Vol. I
9、 mandate specific rules for the safe operation of aircraft during ground icing conditions, and all member states subsequently are required to have regulations in place to ensure this. Paraphrased, these rules specify that no one may dispatch or take off an aircraft with frozen deposits on components
10、 of the aircraft that are critical to safe flight. A critical surface or component is one which could adversely affect the mechanical or aerodynamic function of an aircraft. The intent of these rules is to ensure that no one attempts to dispatch or operate an aircraft with frozen deposits adhering t
11、o any aircraft component critical to safe flight. This is known as the clean aircraft concept. Quality management concerns the establishment, documentation, implementation and maintenance of a system in order to deliver the required process outcome and to continually improve effectiveness. Quality m
12、anagement is therefore a system that allows the effective delivery of the clean aircraft concept. Although no system is perfect, it is necessary to ensure the operation and processes evolve and learn from both non-conforming practice and opportunities for improvement in this critical area of aircraf
13、t safety. As individual icing situations or aircraft types and models may require special procedures, this document can never replace the aircraft operators judgement. However, it does give guidance on the principles of systematic operation of deicing and the improvements that allow valuable learnin
14、g from operations to be captured for even greater assurance of safe operations. SAE INTERNATIONAL AS6332 Page 2 of 21 TABLE OF CONTENTS 1. SCOPE 4 2. REFERENCES 4 2.1 Applicable Documents 4 2.1.1 SAE Publications . 4 2.1.2 ISO Publications: . 5 2.1.3 ICAO Publications: 5 3. ABBREVIATIONS AND DEFINIT
15、IONS . 5 3.1 Abbreviations and Acronyms 5 3.2 Definitions . 6 4. QUALITY MANAGEMENT 8 5. QUALITY MANAGEMENT SYSTEM (APPENDIX REFERENCE: A.1 PROCEDURES AND DOCUMENTATION) . 9 5.1 General Requirements 9 5.2 System Requirements . 9 5.3 Document Control . 9 5.4 Control of Records 10 5.5 Documentation Re
16、quirements for a Deicing/Anti-icing QMS 10 6. MANAGEMENT RESPONSIBILITY (APPENDIX REFERENCE: A.2 MANAGEMENT RESPONSIBILITY) . 10 6.1 Management Commitment 10 6.2 Planning Objectives 11 6.3 Responsibility, Authority and Communication. 11 6.3.1 Responsibility and Authority 11 6.3.2 Management Represen
17、tative 11 6.3.3 Head of Deicing Training. 11 6.4 Management Review 11 6.4.1 General 11 6.4.2 Review Input . 11 6.4.3 Review Output . 12 6.5 Documentation Requirements for Management Responsibility 12 7. RESOURCE MANAGEMENT (APPENDIX REFERENCE: A.3, A.4, A.5, AND A6) 12 7.1 Personnel Competence, Trai
18、ning and Awareness (Appendix reference A.3 Training and Qualification) 12 7.1.1 Requirements 12 7.1.2 Documentation Requirements for Competence, Training and Awareness . 13 7.2 Facilities Infrastructure and Deicing/Anti-icing Equipment (Appendix reference: A.4 Deicing Facilities and A.5 Deicing/Anti
19、-icing Equipment) 13 7.2.1 General 13 7.2.2 Documentation for Facilities and Deicing/Anti-icing Equipment . 14 7.3 Deicing/Anti-icing Fluids Quality Control (Appendix reference A.6 Deicing/Anti-icing Fluids) 15 7.3.1 Requirements 15 8. CLEAN AIRCRAFT CONCEPT (APPENDIX REFERENCE A.7 AIRCRAFT GROUND D
20、EICING/ANTI-ICING OPERATIONS) . 15 8.1 Planning of Aircraft Ground Deicing/Anti-icing Operations . 15 8.2 Aircraft Deicing/Anti-Icing Methods and Processes 16 8.3 Aircraft Deicing/Anti-icing Processes 16 8.4 Documentation Requirements for Aircraft Ground Deicing/Anti-Icing Operations 16 SAE INTERNAT
21、IONAL AS6332 Page 3 of 21 9. MEASUREMENT, ANALYSIS AND IMPROVEMENT (APPENDIX REFERENCE A.8 DOCUMENTATION FOR MEASUREMENT, ANALYSIS AND IMPROVEMENT) . 17 9.1 Internal Auditing 17 9.1.1 The auditing arrangements shall take into account the following requirements: 17 9.2 External Auditing by Air Carrie
22、rs/Air Operators/Customers and Third-Party Organizations/Groups . 17 9.3 Review for Compliance and Improvement 17 9.3.1 Corrective Actions . 17 9.3.2 Preventative Action/Opportunities for Improvement . 18 9.4 Documentation Requirements for Measurement, Analysis and Improvement . 18 APPENDIX A AIRCRA
23、FT GROUND DEICING/ANTI-ICING QUALITY MANAGEMENT DEICING SERVICE PROVIDER DOCUMENTATION REQUIREMENTS AND INSPECTION AREAS . 19 Figure 1 Elements of QMS for aircraft ground deicing/anti-icing 8 SAE INTERNATIONAL AS6332 Page 4 of 21 1. SCOPE This document establishes the general requirements for the qu
24、ality management of aircraft ground deicing/anti-icing systems and processes. It covers the areas of: Quality system, documentation and control of records; Management responsibility; Resource management; Product realization; and Measurement, analysis and improvement. This document defines these area
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEAS63322017AIRCRAFTGROUNDDEICINGANTIICINGQUALITYMANAGEMENTPDF

链接地址:http://www.mydoc123.com/p-1025179.html