SAE AIR 1599A-1991 Ground Equipment Rebuild Program《地面设备的重建计划》.pdf
《SAE AIR 1599A-1991 Ground Equipment Rebuild Program《地面设备的重建计划》.pdf》由会员分享,可在线阅读,更多相关《SAE AIR 1599A-1991 Ground Equipment Rebuild Program《地面设备的重建计划》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、_SAE Technical Standards Board Rules provide that: “This report is published by SAE to advance the state of technical and engineering sciences. The use of this report is entirely voluntary, and its applicability and suitability for any particular use, including any patent infringement arising theref
2、rom, is the sole responsibility of the user.”SAE reviews each technical report at least every five years at which time it may be revised, reaffirmed, stabilized, or cancelled. SAE invites your written comments and suggestions.Copyright 2015 SAE InternationalAll rights reserved. No part of this publi
3、cation may be reproduced, stored in a retrieval system or transmitted, in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without the prior written permission of SAE.TO PLACE A DOCUMENT ORDER: Tel: 877-606-7323 (inside USA and Canada)Tel: +1 724-776-4970 (out
4、side USA)Fax: 724-776-0790Email: CustomerServicesae.orgSAE WEB ADDRESS: http:/www.sae.orgSAE values your input. To provide feedbackon this Technical Report, please visithttp:/www.sae.org/technical/standards/AIR1599AAEROSPACEINFORMATION REPORTAIR1599REV. AIssued 1979-04Revised 1991-03Reaffirmed 2015-
5、10Superseding AIR1599Ground Equipment Rebuild ProgramRATIONALEAIR1599A has been reaffirmed to comply with the SAE five-year review policy.1. SCOPE:This Aerospace Information Report (AIR) is intended to be concerned with fleet programs rather than programs for individual units. Technical and administ
6、rative considerations in developing an approach to a program will be suggested. Organization of material possibly wanted in the form of a detailed specification for airline rebuilder communication is reviewed.1.1 Purpose:This AIR provides information for airline consideration when formulating in-hou
7、se or outside vendor rebuild programs for motorized and nonmotorized ground support equipment (GSE).2. REFERENCES:There are no referenced publications specified herein.2.1 Definition:REBUILD: Reworking of equipment to include all corrective action normally done during an overhaul, correction of know
8、n mechanical, electrical, hydraulic, as well as operational deficiencies, reinforcement of known structural deficiencies, replacement of obsolete parts and components, and necessary modifications to eliminate operational and maintenance deficiencies. The intent of rebuild is to return the equipment
9、to a serviceable condition having an expected or greater service life than when it was new. Latest American National Standards Institute (ANSI) and Occupational Safety and Health Administration (OSHA) requirements should be observed. High cost components probably should be evaluated by using availab
10、le technology. For example, a gasoline engines condition can be determined by a compression check and an oil analysis. Hydraulic test stands and electrical test equipment can be employed on a good percentage of other high cost components.3. DISCUSSION:3.1 Basic Philosophy:Automobiles are generally o
11、f light construction with emphasis on thin-gauge sheet metal paneling needed for high speed over the road transportation. In contrast, ground support equipment tends to be beefy; emphasis is on heavy structure. Their designs incorporate components of adequate capacity to insure sustained performance
12、 under severe operational and environmental demands.There is good evidence to believe that the most economical way to provide long-term support equipment needs is to accomplish major rebuilding of the present equipment when the useful life has been expended. The frames and structures of GSE are cost
13、ly to build. By required disassembly, structural repairs, replacement or renewing of components, refinishing and assembly, it is expected a unit very close to new quality can be achieved.3.2 Methods:To insure that parts which have a finite life, i.e., hoses, wiring, components, switches, cable, chai
14、ns, etc., are renewed, an understanding between the customer and the vendor must be established. High volume, relatively inexpensive parts such as wheel bearings, headlights, toggle switches, bushings, rollers, etc., might best be replaced on all units to facilitate planned quantity purchases, elimi
15、nate inspection and servicing, and permit a standard production sequence.3.3 Defining the Approach:Airlines have often found that the best method of procurement is by competitive bids. To insure that no surprises arise, either to the customer or the rebuilder, the work task and the expected results
16、need to be clearly understood. How the unit has been operated and maintained, damage, corrosion, and abuse will be reflected in the equipments condition. Several approaches are possible. The rebuilder can offer a fixed price by guessing at the scope of the work; the customer and the rebuilder can in
17、spect each unit together and agree on the job; or a rebuilt criterion can be agreed upon as to how to determine when to rebuild/replace with pricing accordingly. Manufacturers manuals and part supports should be utilized to the best advantage.3.4 Economics:3.4.1 Service Life: The time in service whe
18、n a unit is earmarked for rebuild will be helpful for planning programs. Hours of operation can be determined on motorized equipment directly from the hour meter (if installed) or by estimating annual utilization. Maintenance records often show many units within a fleet reach a time when costs escal
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SAEAIR1599A1991GROUNDEQUIPMENTREBUILDPROGRAM 地面 设备 重建 计划 PDF

链接地址:http://www.mydoc123.com/p-1020043.html