REG NASA-LLIS-3760-2011 Lessons Learned - Space Shuttle Orbiter Interconnecting Hardware Test Configuration Verification and Status.pdf
《REG NASA-LLIS-3760-2011 Lessons Learned - Space Shuttle Orbiter Interconnecting Hardware Test Configuration Verification and Status.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-3760-2011 Lessons Learned - Space Shuttle Orbiter Interconnecting Hardware Test Configuration Verification and Status.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Public Lessons Learned Entry: 3760 Lesson Info: Lesson Number: 3760 Lesson Date: 2010-09-13 Submitting Organization: KSC Submitted by: Annette Pitt Subject: Space Shuttle Orbiter Interconnecting Hardware Test Configuration Verification and Status Abstract: When processing a space vehicle for launch,
2、 the test team needs to know how the vehicles interconnecting hardware is configured just before a test begins. A cable disconnected in one system for troubleshooting can inadvertently affect another system one under test. This has happened multiple times over the life of the Shuttle Program. An onb
3、oard system that can rapidly and accurately determine the configuration of interconnecting hardware and is capable of including all electrical interconnections would provide the pretest visibility required by the test team. Description of Driving Event: For hazardous or critical operations, it is vi
4、tal to know if a systems electrical configuration is operational. For example, an actuator must have at least one channel of control when hydraulic power is applied. If no channels are connected, there is no control of the actuator. In one incident, the rudder/speedbrake (RSB) was powered up hydraul
5、ically when the command path connections were demated for troubleshooting not associated with actuator control itself. As a result, the power driver unit was damaged. Fortunately, the drive shafts for the RSB were disconnected, so no surface movement resulted. Unexpected engine or surface movement c
6、an damage critical flight hardware or injure workers. Lesson(s) Learned: When Orbiters were first being processed, the test team used the Connector Integrity Group (CIG) system to manually track the electrical wiring configuration. This CIG system also manually tracked the retest status of each pin
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS37602011LESSONSLEARNEDSPACESHUTTLEORBITERINTERCONNECTINGHARDWARETESTCONFIGURATIONVERIFICATIONANDSTATUSPDF

链接地址:http://www.mydoc123.com/p-1019436.html