1、Lessons Learned Entry: 1835Lesson Info:a71 Lesson Number: 1835a71 Lesson Date: 2007-10-23a71 Submitting Organization: JPLa71 Submitted by: David Oberhettingera71 POC Name: Bette Siegela71 POC Email: bette.siegelnasa.gova71 POC Phone: 202-358-2245Subject: Capture of Apollo Lunar Module Reliability Le
2、ssons Learned: Reliability Engineering Abstract: A July 2007 workshop attended by the former Grumman Corporations Apollo Lunar Module Reliability and Maintainability (R&M) Team and Constellation Program personnel traced the success of the Apollo Lunar Module (LM) to reliability features that were lo
3、cked into an early stage of LM design. The LM prime contractor (Grumman Corporation) and NASA shared responsibility for system reliability, provided for early Reliability Engineering involvement in evaluating design alternatives at the cross-Apollo system level, placed great emphasis on identificati
4、on and elimination of critical single point failures, provided for extensive design redundancy, conducted parallel development of alternative technologies, tested critical hardware beyond qualification levels to the point of failure, and performed rigorous root cause analysis of failures. The Grumma
5、n retirees also recommended active management of design margins, providing the lunar lander with generous instrumentation and telemetry capabilities, and furnishing a strong Lander advocate during CEV design.Description of Driving Event: As part of the Constellation Programs review of human spacefli
6、ght lessons learned, NASA hosted a July 20, 2007 panel discussion with a group of engineers who were members of the Apollo Lunar Module Reliability and Maintainability (R&M) Team. The team members are retired employees of Grumman Corporation, the prime contractor for the Lunar Module (LM). One set o
7、f lessons learned that was discussed focused on the Apollo approach to reliability engineering (Reference (1): Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-The Apollo approach of shared NASA/contractor responsibility for achieving LM reliability (
8、Reference (2) strengthened efforts to incorporate reliability features into the design. As indicated by Figure 1, reliability was infused into the design relatively early in the project life cycle, with part of the achieved reliability captured by design requirements by the release date of the NASA
9、Request for Proposal (RFP). Because NASA issued a brief RFP that stated only functional requirements, and the Grumman program plan (Reference (3) accepted by NASA committed only to these high-level requirements, Grumman retained substantial freedom to make LM design tradeoffs. Had NASA allowed disci
10、pline experts to impose detailed design requirements in the RFP without a full understanding of system-level impacts, some requirements might have detracted from mission success and crew safety. Figure 1. Apollo LM reliability growth (approximation performed in 2007 for use in Reference (1)The Syste
11、ms Reliability Group at Grumman placed heavy emphasis on assuring their early involvement in evaluating design alternatives, such as allocating mass to fuel vs. to payload and allocating functions to hardware vs. software. The LM system had only 10,000 lines of code, and the panel discussion suggest
12、ed that functional requirements implemented in software instead of hardware might decrease weight at the cost of reliability. Decisions on the system configuration were heavily influenced by early weight vs. reliability trade studies that made effective use of flight simulation, and used math models
13、 to compare configurations. In retrospect, if NASA and their contractors had made these trades at the integrated system level (Reference (4), they could have obtained the best reliability increase per pound added to the Apollo booster/Command Module/LM system. For example, if a few extra pounds for
14、an additional battery had been added to the Apollo LM, it might have provided the power needed to make the LM a more comfortable lifeboat during the Apollo 13 return trip. Redundancy was employed extensively in the effort to minimize the number of potential single point failures. Apollo LM designers
15、 in cross-functional, reliability-oriented teams sought to provide Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-extensive redundancy by dissimilar means. For example, the secondary abort system employed hardware and software that was different tha
16、n that used in the primary guidance system. Component redundancy (e.g., use of dual valve regulators) was employed where feasible. Parallel technology development, such as the simultaneous development of both fuel cells and batteries as alternative power sources, was also used to mitigate the system
17、 reliability risk. Because the test program design was based on a lunar environment that was unknown and a mission profile that was then uncertain, it evolved over time. Developmental flight hardware was stressed to failure, well beyond the environmental uncertainty factor of 1.5 used to set the qua
18、lification test levels. This provided an additional environmental margin that accommodated design changes later in the LM project. In contrast, International Space Station (ISS) developmental hardware was not tested beyond qualification levels, and during ISS operations certain necessary flight orie
19、ntations exceeded these design limits (Reference (5). The actual Apollo LM flight hardware was tested to flight environmental levels with continuous operation to screen design and workmanship failures. All failures were subjected to very rigorous root cause analysis, and corrective action plans were
20、 approved at the NASA level. Although reliability prediction per MIL-HDBK-217 was then in common use by aerospace engineers, the methodology provided very limited benefits to the LM project. The designers were driven by the need to eliminate single-point failures (SPFs) that could impede mission suc
21、cess or harm the crew. Hence, changes were required for designs that contained SPFs even if a calculation predicted a low probability of failure. Failure Mode and Effects Analysis (FMEA) performed at the system and functional levels was very effective in identifying failure modes (including failures
22、 of other contractors interfacing hardware) and evaluating design modifications. In hindsight, though, performance of FMEAs at an even lower tier (i.e., the subcontractor level) would have revealed problems (like solder balls floating in switches) earlier. But careful analysis would not have suffice
23、d without tenacity by the Grumman Systems Reliability Group in forging the necessary design modifications to ensure mission success and crew safety. The Apollo 13 near-disaster revealed the importance of obtaining operations data in real time to support safety-related decision making. For example, t
24、he triggering of a CO2 alarm at the warning system engineers console in Houston alerted the mission to the need to take extraordinary measures to save the crew. Mission success requires mission operations staff to expect the unexpected. This requires the generous allocation of flight instrumentation
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS18352007LESSONSLEARNEDCAPTUREOFAPOLLOLUNARMODULERELIABILITYLESSONSLEARNEDRELIABILITYENGINEERINGPDF

链接地址:http://www.mydoc123.com/p-1019311.html