REG NASA-LLIS-1567--2005 Lessons Learned Stability of Project Technical Content Focus and Milestone Creep.pdf
《REG NASA-LLIS-1567--2005 Lessons Learned Stability of Project Technical Content Focus and Milestone Creep.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1567--2005 Lessons Learned Stability of Project Technical Content Focus and Milestone Creep.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1567Lesson Info:a71 Lesson Number: 1567a71 Lesson Date: 2005-05-24a71 Submitting Organization: ARCa71 Authored by: Ronald. C. WinterlinSubject: Stability of Project Technical Content/Focus and Milestone Creep Abstract: A number of times, the Advanced Air Transportation Technol
2、ogies (AATT) Project was directed to add, delete, and/or change the project focus of research, not only on existing agreed-to ATM products (tools and concepts), but in some cases, change of direction to develop totally new tools. It is understood that flexibility in research must be maintained in or
3、der that concepts that do not prove worthwhile can be dropped allowing for focus and priority shifts to more promising ones. However, both realistic and reasonable controls on project scope and priority setting must be maintained to assure prudent management planning and decision-making. Excessive c
4、ontrol and redirection of focus/priorities late into a projects life leads to wasteful use of resources and hampers the projects ability to manage and deliver effectively. Significant changes well into the implementation phase can be very costly as contractual planning and funds obligations limit th
5、e scope and/or task requirement changes that can bemade after the fact. Directly related to the above is what we refer to as milestone creep. Project management shifts, along with changing (sometimes mandated) project priorities, resulted in too many milestones that grew in number all the way into t
6、he last trimester of the project. This also made it difficult to adhere to a uniform, consistent milestone organization and management system, resulting in some sub-projects with many more milestones and resultant work than others and the milestones becoming somewhat jumbled and not following the mo
7、st logical sequencing. This caused a significant amount of work to support programmatic/administrative management, documentation and configuration control, tracking, etc. across organizations (including 3 centers and multiple directorates and divisions). Description of Driving Event: There is no sin
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS15672005LESSONSLEARNEDSTABILITYOFPROJECTTECHNICALCONTENTFOCUSANDMILESTONECREEPPDF

链接地址:http://www.mydoc123.com/p-1019190.html