1、Lessons Learned Entry: 1520Lesson Info:a71 Lesson Number: 1520a71 Lesson Date: 2005-01-28a71 Submitting Organization: JPLa71 Submitted by: Philip KwanSubject: Check Testbed Health Before Beginning or Resuming Flight System Test (2003) Abstract: In a scenario that is most likely to occur on severely
2、time-constrained flight projects, system-level testing is interrupted and test time is lost because of unreported changes to the testbed configuration. Use walkthroughs, briefings, startup procedures, and reporting tools to ensure at the beginning of each work shift that test operators are apprised
3、of all changes to the system testbed configuration.Description of Driving Event: In a scenario that is most likely to occur on severely time-constrained flight projects, testing is interrupted and test time is lost because of unreported changes to the testbed configuration. During subsystem integrat
4、ion and test (I&T) of Mars Exploration Rover (MER), for example, a software test operator spent two hours at a keyboard preparing for a special MER flight software (FSW) test case. When the test began, the system crashed, and extensive troubleshooting disclosed that the test operator had been unawar
5、e that the previous shift had removed the Rover camera from the testbed. Other similar incidents might stem from a loose cable caused by an equipment swap. This problem is exacerbated for projects like MER where system development continues even while testing is underway in dual work shifts.JPL flig
6、ht system I&T programs typically implement the following steps to minimize lost test time: 1. A meeting is held at the beginning of each I&T shift to brief the incoming team on changes to the testbed configuration.2. A startup procedure, maintained for each testbed, is continually updated to reflect
7、 the current testbed configuration.3. An on-line reporting tool is used to capture the activities of each test shift, document hand-over instructions to the next shift, report changes to the testbed configuration, and provide Provided by IHSNot for ResaleNo reproduction or networking permitted witho
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS15202005LESSONSLEARNEDCHECKTESTBEDHEALTHBEFOREBEGINNINGORRESUMINGFLIGHTSYSTEMTEST2003PDF

链接地址:http://www.mydoc123.com/p-1019158.html