1、Lessons Learned Entry: 1517Lesson Info:a71 Lesson Number: 1517a71 Lesson Date: 2005-02-17a71 Submitting Organization: SSCa71 Submitted by: Cecile SaltzmanSubject: Test Stand E-1 Mishap Abstract: During welding operations at the E-Complex in support of the Full-Volume RP Construction Project at Stenn
2、is Space Center, a fire occurred as a result of welding/cutting operations being performed on Level 5 of the E-1 Test Stand. The Mishap Investigation Team concluded that the proximate cause of this Type C incident was hot welding slag igniting combustible material under and near the vicinity of the
3、welding/cutting operation. Contractor failure to follow procedures associated with hot work permits due to schedule pressure contributed to the incident, as well as lack of training and overburdened supervisory personnel.Description of Driving Event: During welding operations at the E-Complex in sup
4、port of the Full-Volume RP Construction Project at Stennis Space Center, a fire occurred as a result of welding/cutting operations being performed on Level 5 of the E-1 Test Stand. The Mishap Investigation Team concluded that the proximate cause of this Type C incident was hot welding slag igniting
5、combustible material under and near the vicinity of the welding/cutting operation. Contractor failure to follow procedures associated with hot work permits due to schedule pressure contributed to the incident, as well as lack of training and overburdened supervisory personnel.Lesson(s) Learned: a71
6、If not managed appropriately, schedule pressures will result in the degradation of formal work processes and safe engineering practices as well as erode the execution of proper supervision.a71 Failure to verify proper training and apply thorough supervision will lead to safety incidents.a71 The diff
7、erence between work conditions in the presence and absence of water dictates the need for separate policies governing hot activity in each environment.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a71 Synergy between the status of fire suppression
8、systems and the Fire Department is critical to maximum protection of human life and agency assets.a71 Greater consideration to fire safety support is required during the facility design review process. Recommendation(s): 1. Ensure that all personnel associated with hot work are aware of the hot work
9、 permit process and associated requirements. Clearly identify responsibilities including who verifies that precautions have been taken. Ensure a system is in place that will continually verify requirements are being met. (This system should extend to all safety related areas).2. Ensure all personnel
10、 are trained to the proper procedure and that they are following procedures.3. a) When water is not available, implement a system that ensures safe hot work operations. b) Improve the notification process to assure that the Fire Department is aware anytime that a fire suppression system is taken out
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS15172005LESSONSLEARNEDTESTSTANDE1MISHAPPDF

链接地址:http://www.mydoc123.com/p-1019155.html