REG NASA-LLIS-1390--2004 Lessons Learned Test Telecommunications Links End-to-End and Don-t Forget the Doppler (2000).pdf
《REG NASA-LLIS-1390--2004 Lessons Learned Test Telecommunications Links End-to-End and Don-t Forget the Doppler (2000).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-1390--2004 Lessons Learned Test Telecommunications Links End-to-End and Don-t Forget the Doppler (2000).pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 1390Lesson Info:a71 Lesson Number: 1390a71 Lesson Date: 2004-01-12a71 Submitting Organization: JPLa71 Submitted by: David Oberhettinger, Jim TaylorSubject: Test Telecommunications Links End-to-End, and Dont Forget the Doppler (2000) Abstract: A mission-critical error was disco
2、vered in the communications link between the Cassini spacecraft and its Huygens probe when it was determined that the radio frequencies would not adjust for Doppler effect. This parameter was not isolated during the pre-launch verification process. The recommendations affirm the need for (1) end-to-
3、end testing of communications links, (2) a high fidelity telecommunications testbed, and (3) referencing Doppler effects on subcarriers in an appropriate procedure.Description of Driving Event: A mission-critical error was discovered in the communications link between the Cassini spacecraft and its
4、Huygens probe when it was determined that the radio frequencies would not adjust for Doppler effect. With Doppler effect, the motion of a transmitter relative to a receiver causes the received frequency to differ from that sent from the transmitter. The effect on a probe-to-orbiter uplink may be esp
5、ecially severe in times of rapid velocity changes such as during planetary flybys and Saturn orbit insertion. An extensive in-flight end-to-end telecommunications test conducted in February 2000 (3 years after Cassini was launched) revealed anomalous characteristics of the Huygens-Cassini communicat
6、ions link. Extensive ground testing of the link subsequently confirmed that Doppler shift would cause unanticipated 10dB degradation in the link margin, resulting in a major loss of data during probe descent and landing. This parameter was not isolated during the pre-launch verification process. The
7、 baseline mission profile has been changed to increase the strength of the data signal and restore the Huygens mission. ReferencesProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1. ”Huygens Communications Package Under Investigation,” ESA Press Relea
8、se, October 5, 2000.2. ”Ensure Test Facilities Can Accommodate Test-As-You-Fly,“ Lessons Learned No. 1335, March 31, 2003.3. ”Test As You Fly, Fly As You Test, And Demonstrate Margin,” Lessons Learned No. 1196, January 24, 2002.4. JPL Incident/Surprise Anomaly (ISA) report no. Z70967, February 14, 2
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS13902004LESSONSLEARNEDTESTTELECOMMUNICATIONSLINKSENDTOENDANDDONTFORGETTHEDOPPLER2000PDF

链接地址:http://www.mydoc123.com/p-1019029.html