1、Lessons Learned Entry: 0938Lesson Info:a71 Lesson Number: 0938a71 Lesson Date: 2001-02-15a71 Submitting Organization: JPLa71 Submitted by: David A. NicholsSubject: Probable Scenario for Mars Polar Lander Mission Loss (1998) Abstract: Neither the MPL software requirements specification nor the softwa
2、re, subsystem or system test plans required verification of immunity to transient signals. MPL touchdown sensors generated known transient signals at leg deployment. Full leg deployment test was not repeated after wiring corrections. Tests should be re-run after test deficiencies are corrected or ha
3、rdware or software is revised unless clear rationale exists for not doing so. Hardware operational characteristics, including transients and spurious signals must be reflected in software requirements and verified by test.Description of Driving Event: The Mars Polar Lander (MPL) flight software did
4、not take into account certain known hardware characteristics. Resulting mission-critical failure modes were not detected during testing of the spacecraft.It was known that the touchdown sensors generated false momentary signals at leg deployment. This transient behavior was not properly accounted fo
5、r in the software design. It is believed that these momentary signals were recorded as valid touchdown events, resulting in the engines shutting down at an altitude of 40 meters. The resultant free fall to the surface of Mars is viewed as the probable cause of the December 1999 MPL mission loss (Ref
6、erences 1 and 2).Neither the software requirements specification nor the software, subsystem or system test plans required verification of transient signal immunity. Therefore it was never verified.Wiring errors in the touchdown sensors prevented registry of the touchdown or detection of the false t
7、ransient signal during the first system-level leg deployment test.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-A full leg deployment test was not repeated after the wiring was corrected. However, the footpads were again manually depressed and the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS09382001LESSONSLEARNEDPROBABLESCENARIOFORMARSPOLARLANDERMISSIONLOSS1998PDF

链接地址:http://www.mydoc123.com/p-1018583.html