REG NASA-LLIS-0657-2000 Lessons Learned Critical Design Review for Unmanned Missions.pdf
《REG NASA-LLIS-0657-2000 Lessons Learned Critical Design Review for Unmanned Missions.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0657-2000 Lessons Learned Critical Design Review for Unmanned Missions.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Best Practices Entry: Best Practice Info:a71 Committee Approval Date: 2000-03-03a71 Center Point of Contact: JPLa71 Submitted by: Wil HarkinsSubject: Critical Design Review for Unmanned Missions Practice: Practice: Conduct a formal Critical Design Review (CDR) of hardware, software, and firmware at
2、the subsystem and system levels. Schedule the review prior to the start of subsystem fabrication and assembly to assure that the design solutions satisfy the performance requirements established in the development specifications. Establish this review as a standard reliability engineering practice f
3、or flight hardware.Abstract: Preferred Practice for Design from NASA Technical Memorandum 4322A, NASA Reliability Preferred Practices for Design and Test.Benefits:The Critical Design Review (CDR) provides increased assurance that the proposed design, and the planned manufacturing and test methods an
4、d procedures, will result in an acceptable product, with minimal project risk.Implementation Method:ResponsibilitiesThe responsible project or task manager defines the need to conduct a formal review and initiates action by contacting the convening authority (generally, the next higher management le
5、vel). The convening authority, in consultation with the responsible manager, appoints the review board and a chair and defines the board charter and schedule.The CDR ensures that all design considerations have been adequately incorporated and that all engineering analyses have been completed. Result
6、s of engineering model tests are presented to demonstrate that the hardware and software can be built to perform as planned. In addition, plans are presented for fabrication and testing, including qualification and acceptance.The review board, under direction of the chair, conducts the review and pr
7、epares a written report to the responsible manager on the findings and recommendations. The responsible manager then prepares a written response to the convening authority addressing the disposition of the review board findings and recommendations. The convening authority reviews and approves these
8、dispositions.CDR AgendaThe following items and issues are addressed at the CDR, where applicable:1. Functional description and block diagram.2. Functional requirements and compliance of the design, presented in matrix format with traceability references.Provided by IHSNot for ResaleNo reproduction o
9、r networking permitted without license from IHS-,-,-3. Disposition of subassembly/subsystem Preliminary Design Review (PDR) action items.4. Compliance of the design with accuracy requirements.5. Compliance of the design with interface requirements.6. Compliance of the design with mass requirements.7
10、. Compliance of the design with power requirements.8. Compliance of the design with memory requirements.9. Compliance of the design with environmental requirements.10. Compliance of the design with project Single Point Failure (SPF) policy.11. Compliance of the design with maintainability requiremen
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS06572000LESSONSLEARNEDCRITICALDESIGNREVIEWFORUNMANNEDMISSIONSPDF

链接地址:http://www.mydoc123.com/p-1018304.html