REG NASA-LLIS-0609-1999 Lessons Learned Develop and Test the Launch Procedure Early (1997).pdf
《REG NASA-LLIS-0609-1999 Lessons Learned Develop and Test the Launch Procedure Early (1997).pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0609-1999 Lessons Learned Develop and Test the Launch Procedure Early (1997).pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0609Lesson Info:a71 Lesson Number: 0609a71 Lesson Date: 1999-01-14a71 Submitting Organization: JPLa71 Submitted by: W. Moore/D. OberhettingerSubject: Develop and Test the Launch Procedure Early (1997) Abstract: During the terminal countdown for the first attempted launch of Ca
2、ssini, spacecraft telemetry channels indicated a false alarm condition that delayed verification of spacecraft readiness for launch, and contributed to a delay on the first launch day. The anomaly was traced to erroneous telemetry documentation.Develop and release the launch procedure early enough f
3、or comprehensive testing prior to launch. Rigorously test and verify all telemetry channels and their alarms, and ensure documentation such as telemetry definitions is kept up to-date. Description of Driving Event: During the terminal countdown for the first attempted launch of Cassini, spacecraft t
4、elemetry channels indicated a false alarm condition that delayed verification of spacecraft readiness for launch, and contributed to a delay on the first launch day.In planning for Cassini launch activities, the RED-ALARM strategy was to set critical measurement alarms for telemetry values differing
5、 from those expected at liftoff. As expected, pre-launch conditioning generated a number of red alarms, most of which cleared as the spacecraft was brought to the final liftoff state. However, two red alarms did not clear, resulting in the false alarm conditions. This anomaly was traced to erroneous
6、 telemetry documentation: the SAFE/ARM logic states for the two channels whose alarms did not clear were found to be reversed in the data dictionary.The Cassini launch procedure was developed late in the Assemble, Test, and Launch Operations (ATLO) process, and alarm testing with correct parameters
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS06091999LESSONSLEARNEDDEVELOPANDTESTTHELAUNCHPROCEDUREEARLY1997PDF

链接地址:http://www.mydoc123.com/p-1018256.html