欢迎来到麦多课文档分享! | 帮助中心 海量文档,免费浏览,给你所需,享你所想!
麦多课文档分享
全部分类
  • 标准规范>
  • 教学课件>
  • 考试资料>
  • 办公文档>
  • 学术论文>
  • 行业资料>
  • 易语言源码>
  • ImageVerifierCode 换一换
    首页 麦多课文档分享 > 资源分类 > PDF文档下载
    分享到微信 分享到微博 分享到QQ空间

    REG NASA-LLIS-0609-1999 Lessons Learned Develop and Test the Launch Procedure Early (1997).pdf

    • 资源ID:1018256       资源大小:14.58KB        全文页数:3页
    • 资源格式: PDF        下载积分:10000积分
    快捷下载 游客一键下载
    账号登录下载
    微信登录下载
    二维码
    微信扫一扫登录
    下载资源需要10000积分(如需开发票,请勿充值!)
    邮箱/手机:
    温馨提示:
    如需开发票,请勿充值!快捷下载时,用户名和密码都是您填写的邮箱或者手机号,方便查询和重复下载(系统自动生成)。
    如需开发票,请勿充值!如填写123,账号就是123,密码也是123。
    支付方式: 支付宝扫码支付    微信扫码支付   
    验证码:   换一换

    加入VIP,交流精品资源
     
    账号:
    密码:
    验证码:   换一换
      忘记密码?
        
    友情提示
    2、PDF文件下载后,可能会被浏览器默认打开,此种情况可以点击浏览器菜单,保存网页到桌面,就可以正常下载了。
    3、本站不支持迅雷下载,请使用电脑自带的IE浏览器,或者360浏览器、谷歌浏览器下载即可。
    4、本站资源下载后的文档和图纸-无水印,预览文档经过压缩,下载后原文更清晰。
    5、试题试卷类文档,如果标题没有明确说明有答案则都视为没有答案,请知晓。

    REG NASA-LLIS-0609-1999 Lessons Learned Develop and Test the Launch Procedure Early (1997).pdf

    1、Lessons Learned Entry: 0609Lesson Info:a71 Lesson Number: 0609a71 Lesson Date: 1999-01-14a71 Submitting Organization: JPLa71 Submitted by: W. Moore/D. OberhettingerSubject: Develop and Test the Launch Procedure Early (1997) Abstract: During the terminal countdown for the first attempted launch of Ca

    2、ssini, spacecraft telemetry channels indicated a false alarm condition that delayed verification of spacecraft readiness for launch, and contributed to a delay on the first launch day. The anomaly was traced to erroneous telemetry documentation.Develop and release the launch procedure early enough f

    3、or comprehensive testing prior to launch. Rigorously test and verify all telemetry channels and their alarms, and ensure documentation such as telemetry definitions is kept up to-date. Description of Driving Event: During the terminal countdown for the first attempted launch of Cassini, spacecraft t

    4、elemetry channels indicated a false alarm condition that delayed verification of spacecraft readiness for launch, and contributed to a delay on the first launch day.In planning for Cassini launch activities, the RED-ALARM strategy was to set critical measurement alarms for telemetry values differing

    5、 from those expected at liftoff. As expected, pre-launch conditioning generated a number of red alarms, most of which cleared as the spacecraft was brought to the final liftoff state. However, two red alarms did not clear, resulting in the false alarm conditions. This anomaly was traced to erroneous

    6、 telemetry documentation: the SAFE/ARM logic states for the two channels whose alarms did not clear were found to be reversed in the data dictionary.The Cassini launch procedure was developed late in the Assemble, Test, and Launch Operations (ATLO) process, and alarm testing with correct parameters

    7、was not done. Also, testing of these Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-particular alarms prior to actual launch was not possible at KSC due to safety considerations.The Mars Pathfinder (MPF) project developed their launch procedure earl

    8、y, and subjected it to rigorous, multiple tests during their 18-month ATLO. In this case, additional testing had negligible cost and schedule impact since it was conducted in conjunction with other testing to gain operating hours.Additional Keyword(s): Launch Readiness Review, Operations Readiness R

    9、eview, Configuration Management, Interface ControlReference(s):1. Cassini Spacecraft Assembly, Test, and Launch Operations (ATLO) Final Report, Volume I, JPL Document D-15701, May 15, 1998, page 151.2. JPL Problem/Failure Report No. Z44319, October 13, 1997.Lesson(s) Learned: All spacecraft related

    10、launch operation procedures should be demonstrated multiple times prior to shipment.Recommendation(s): 1. Develop and release the launch procedure early enough for comprehensive testing prior to launch.2. Rigorously test and verify all telemetry channels, and their alarms, that will be used during l

    11、aunch and flight.3. Ensure documentation such as telemetry definitions is kept up-to-date.Evidence of Recurrence Control Effectiveness: N/ADocuments Related to Lesson: N/AMission Directorate(s): N/AProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Addi

    12、tional Key Phrase(s): a71 Configuration Managementa71 Launch Processa71 Test & VerificationAdditional Info: Approval Info: a71 Approval Date: 1999-01-27a71 Approval Name: Carol Dumaina71 Approval Organization: 125-204a71 Approval Phone Number: 818-354-8242Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-


    注意事项

    本文(REG NASA-LLIS-0609-1999 Lessons Learned Develop and Test the Launch Procedure Early (1997).pdf)为本站会员(花仙子)主动上传,麦多课文档分享仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。 若此文所含内容侵犯了您的版权或隐私,请立即通知麦多课文档分享(点击联系客服),我们立即给予删除!




    关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

    copyright@ 2008-2019 麦多课文库(www.mydoc123.com)网站版权所有
    备案/许可证编号:苏ICP备17064731号-1 

    收起
    展开