1、 MPR 7120.1 REVISION F EFFECTIVE DATE: December 20, 2012 EXPIRATION DATE: December 20, 2017 MARSHALL PROCEDURAL REQUIREMENTS DA01 MSFC ENGINEERING AND PROGRAM/PROJECT MANAGEMENT REQUIREMENTS COMPLIANCE IS MANDATORY DIRECTIVE IS UNCONTROLLED WHEN PRINTED Verify current version before use at https:/dm
2、l.msfc.nasa.gov/directives Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 MSFC Engineering and Program/Project Management Requirements MPR 7120.1 Revision: F Date: December 20, 2012 Page 2 of 149 DOCUMENT HISTOR
3、Y LOG Status (Baseline/ Revision/ Change Canceled) Document Revision/ Change Effective Date Description Baseline 5/14/99 Document converted from MSFC-P02.1 to a Directive. Previous history retained in system as part of canceled or superseded ISO Document files. Revision A 3/6/00 Revised to include P
4、PMPT Team recommendations. Revision B 10/3/00 Revised to incorporate New Work Acceptance and Approval Process. Revision C 10/15/2004 Revised to incorporate changes made to Agencys parent document (NPR7120.5B) and to remove “non-Requirements” per Agency direction. Revision D 9/7/2007 Revised to incor
5、porate changes made to the Agencys parent document, NPR 7120.5. Changes include addition of key decision point reviews, separation of program authority, and technical authority. Revision E 7/21/2010 Changed document title from “Program/Project Planning” to “Space Flight Program/Project Planning.” Re
6、vised to incorporate changes made to the Agencys parent document, NPR 7120.5 through the NASA Interim Directive (NID) NM 7120-81. The NID is part of a realignment of governing documents within NASA designed to increase accountability and general clarity in the flow down of both programmatic and inst
7、itutional requirements. On 4/11/11, at the request of the OPRD, administrative changes were made at P.3 Authority to add NPR 7120.7 and NPR 7120.8 citations in 1.1, at P.4 to update title of MWI 7120.6, at Appendix A to add “NM” acronym, and throughout edited acronyms and terms for consistency. Revi
8、sion F 12/20/2012 Changed document title from “Space Flight Program/Project Planning” to “MSFC Engineering and Program/Project Management Requirements.” Revised (major rewrite) to incorporate changes made to NPR 7120.5 in revision E, and to expand the scope to cover additional Agency directives (i.e
9、. NPR 7120.6, NPR 7120.7/NID 7120.99, NPR 7120.8, NPR 7120.9, NPR 7120.10, NPR 7123.1/NID 7120-69, and NPR 7150.2). Includes changes to establish MSFC derived requirements for space flight program/projects (primarily in chapters 6 22). Changed to new 2012 MPR template format. Also includes various m
10、inor editorial changes throughout the document. DIRECTIVE IS UNCONTROLLED WHEN PRINTED Verify current version before use at https:/dml.msfc.nasa.gov/directives Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 MSFC
11、 Engineering and Program/Project Management Requirements MPR 7120.1 Revision: F Date: December 20, 2012 Page 3 of 149 TABLE OF CONTENTS PREFACE P.1 Purpose .5 P.2 Applicability .5 P.3 Authority .6 P.4 Applicable Documents and Forms6 P.5 Measurement/Verification 6 P.6 Cancellation 7 CHAPTER 1. Respon
12、sibilities 8 CHAPTER 2. MSFC Engineering and Program/Project Management Requirements Flow Down.14 CHAPTER 3. MSFC Assessment of Compliance 16 CHAPTER 4. Project/Activity Categorization and Risk Classification .18 CHAPTER 5. Program/project Life Cycle .21 CHAPTER 6. Design to Cost41 CHAPTER 7. Requir
13、ements, Compliance, and Verification 44 CHAPTER 8. Work Breakdown Structure .46 CHAPTER 9. Heritage Hardware and Software.47 CHAPTER 10. Acquisition and Make-or-Buy 48 CHAPTER 11. Government Insight and Oversight .50 CHAPTER 12. Technical Baseline Control.52 CHAPTER 13. Task Agreements 53 CHAPTER 14
14、. Systems Engineering and Integration (SE “should“ denotes a good practice and is recommended, but not required; “will“ denotes expected outcome; and “are/is“ denotes descriptive material.” d. This MPR applies the following: all document citations are assumed to be the latest version unless otherwis
15、e noted. e. This MPR applies to all Center organizations that manage space flight programs, projects, and activities (including spacecraft, launch vehicles, instruments developed for space flight programs and projects, research and technology developments funded by and to be incorporated into space
16、flight programs and projects, critical technical facilities specifically developed or significantly modified for space flight systems, and ground systems that are in direct support of space flight operations). f. This MPR applies to reimbursable space flight program/projects performed for non-NASA s
17、ponsors. g. This MPR applies to research and technology development that is not funded by space flight programs and projects, as well as information technology and institutional infrastructure programs and projects. h. This MPR applies to lessons learned, technical standards, and software engineerin
18、g, regardless of the program or project supported. DIRECTIVE IS UNCONTROLLED WHEN PRINTED Verify current version before use at https:/dml.msfc.nasa.gov/directives Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 M
19、SFC Engineering and Program/Project Management Requirements MPR 7120.1 Revision: F Date: December 20, 2012 Page 6 of 149 Note: See Chapter 2 for more specific applicability information. P.3 AUTHORITY a. NPD 7120.4, “NASA Engineering and Program/Project Management Policy” b. NPR 7120.5, “NASA Space F
20、light Program and Project Management Requirements” c. NPR 7120.6, “Lessons Learned Process” d. NPR 7120.7 and NID 7120.99, “NASA Information Technology and Institutional Infrastructure Program and Project Management Requirements” e. NPR 7120.8, “NASA Research and Technology Program and Project Manag
21、ement Requirements” f. NPR 7120.9, “NASA Product Data and Life-Cycle Management (PDLM) for Flight Programs and Projects” g. NPR 7120.10, “Technical Standards for NASA Programs and Projects” h. NPR 7123.1 and NID 7120-69, “NASA Systems Engineering Processes and Requirements” i. NPR 7150.2, “NASA Soft
22、ware Engineering Requirements” P.4 APPLICABLE DOCUMENTS AND FORMS a. NPR 1441.1, “NASA Records Retention Schedules” b. MPR 1280.10, “Marshall Quality Management System” c. MPR 1440.2, “MSFC Records Management Program” d. MPR 7120.4, “MSFC Center Management Council (CMC) Process” e. MPR 7123.1, “MSFC
23、 Systems Engineering Processes and Requirements” f. NASA-STD-7009, “Standard For Models and Simulations” P.5 MEASUREMENT/VERIFICATION a. MSFC programs/projects submit a compliance matrix (showing their compliance to the program/project requirements of this MPR) to the MSFC Chief Engineers Office at
24、System DIRECTIVE IS UNCONTROLLED WHEN PRINTED Verify current version before use at https:/dml.msfc.nasa.gov/directives Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements DA01 MSFC Engineering and Program/Project Manageme
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASAMPR71201REVF2012MSFCENGINEERINGANDPROGRAMPROJECTMANAGEMENTREQUIREMENTSPDF

链接地址:http://www.mydoc123.com/p-1017605.html