NAVY MIL-R-22623 A-1980 RACK BOMB EJECTOR AIRCRAFT AERO 20A AND AERO 20B SERIES《20A及20B航空系列飞机的喷射器及炸弹的机架》.pdf
《NAVY MIL-R-22623 A-1980 RACK BOMB EJECTOR AIRCRAFT AERO 20A AND AERO 20B SERIES《20A及20B航空系列飞机的喷射器及炸弹的机架》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-22623 A-1980 RACK BOMB EJECTOR AIRCRAFT AERO 20A AND AERO 20B SERIES《20A及20B航空系列飞机的喷射器及炸弹的机架》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-R-22623A (AS) 25 April 1980 Superseding MIL-R-22623 15 May 1961 Beneficial comments (recommendations, additions, deletions) and any pertinent . data which may be of use in improving this document should be addressed to: Engineering Specifications and Standards Department (Code 9311), Naval Air E
2、ngineering Center, Lakehurst, NJ 08733 by using the self-addressed Standardi- zation Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. - MILITARY SPECIFICATION I RACK, BOMB EJECTOR, AIRCRAFT; AERO 20A AND AERO 208 SERIES This specification is approved f
3、or use by the Naval Air Systems Command, Department of the Navy, and is available for use by all departments and agencies of the Department of Defense. 1. SCOPE AND CLASSIFICATION 1.1 Scope. This specification establishes the requirements for the manufacture and inspection of two types of bomb racks
4、 capable of carrying and releasing stores having suspension lugs spaced 355.6 millimeters (14 inches) apart and weighing from 113 kilograms (250 pounds) to 660 kilograms (1,450 - pounds). The test limits in this specification define minimum acceptable capabilities. 1.2 Classification. Bomb ejector r
5、acks, hereinafter called bomb racks, covered by this specification shall be of the following types: .J Type I Type II AERO 20A Bomb Ejector Rack Aero 20B Bomb Ejector Rack 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The following documents, of the issue in effect. on date of invitation for bids
6、 or request for proposal, form a part of this specification to the extent specified herein. FSC 1095 THIS DOCUMENT CONTAINS 1 PAGES. A C 1 . . .“ _._r. .i . t . ,I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-i f SPECIFICATIONS Military MIL-T-7743
7、 MIL-C-81842 MIL-H-85042 STANDARDS Military MIL-STD-100 MIL-STD-i29 MIL-STD-130 MIL-STD-143 MIL-STD-704 MIL-STD-794 MIL-STD-831 MS3314 Testing, Store Suspension and Release Equipment; General Specification for Connector Assemblies for Bomb Rack Electric Fuzing Provisions Hooks, Bomb Rack, General Sp
8、ecification for Engineering Drawing Practices Marking for Shipment and Storage identification Marking of U.S. Military Property Standards and Specifications, Order of Precedence for the Selection of Electric Power, Aircraft, Characteristics and Utilization of Parts and Equipment, Procedures for Pack
9、aging and Packing of . %est Reports, Preparation of . Lug, Suspension, 450 Xg. (1,000 lb) class, Airborne Equipment DRAWINGS Naval Air Systems Command 1380540 Lug, Suspension, Mk 3 Mod O (Copies of specifications, standards, drawings, and publications required by suppliers in connection with specifi
10、c procurement functions should be obtain- ed from the procuring activity or as directed by the contracting officer.) 2.2 Order of precedence of specifications and standards. Should a conflict exist between any requirement-in this specification and any requirement in the applicable documents referenc
11、ed herein, the requirements of this specifi- cation shall take precedence over the referenced (applicable) document. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-.- - MIL-R-22623A 10 U 777770b 0302648 O m- 3. REQUIREMENTS 3.1 First article. The
12、bomb racks furnished under this specification shall be a product which has been inspected and passed the first article inspec- tion specified herein (see 4.3). 3.2 Selection of specifications and standards. Specifications and standards for necessary commodities and services not specified herein shal
13、l be selected in accordance with MIL-STD-143. 3.3 Interchangeability. All parts having the same part number shall be directly and completely interchangeable with each other with respect to installation and performance. All parts shall be marked as specified on the drawings listed in the data list fo
14、r the bomb rack being procured, or in accordance with MIL-STD-130, if not specified on the drawings. The item identi- fication and part number requirements of MIL-STD-100 shall govern the part number and changes thereto. 3.4 Identification of parts. 3.5 Bomb rack 3.5.1 Construction. The construction
15、 of the bomb rack shall be in accordance with the drawings listed in the data list for the bomb rack being procured and as specified herein (see 6.2.lg). 3.5.2 ments when subjected to the following inspections in the order specified in Tables I and II. Performance. The bomb racks shall satisfy all p
16、erformance requtre- a. b. C. d. e. f. g. h. i. j- k. Bomb Rack Inspection (see 4.6.1) Functional Tesp(see 4.6.2) Arming Mechanism (see 4.6.3) Electric Fuze Arming (see 4.6.4) Manual Function (see 4.6.51) Electrical Characteristics (see 4.6.5b) Lag Time or Time of Release Determination (see 4.6.5) Hi
17、gh-g Release (see 4.6.5d) Icing (see 4.6.5e) Sand (see 4.6.5f) Salt Spray (see 4.6.5g) 3 L c 1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-R-22623A LO W 9979706 0302649 2 M _._ . - . 1. m. n. O. 3.6 I Shock (see 4.6.5h) Vibration (see 4.6.5i
18、) Life (see 4.6.53) Static (see 4.6.5k) Bomb rack hooks. The construction and inspection of the bomb rack hooks shall be in accordance with MIL-i-85042. 3.7 Electric fuze arming unit. The construction and inspection of the electric fuze arming unit shall be in accordance with MIL-C-81842. 3.8 Workma
19、nship. The workmanship displayed in fabrication and assem- bly of the bomb racks shall be such as to assure, within design limitations, the ability of the bomb racks to meet their performance requirements under all applicable environmental conditions specified herein. Unauthorized repair, welding, h
20、eavy burrs, or parts assembled by introduction of high stresses not prescribed in the drawings, are typical signs of inferior workmanship and shall be cause for rejection. The standards of workmanship exhibited in the approved first article sample, subject to any qualification stated in the governme
21、nts notice of approval, shall be determinative of the. requirements of the contract relative to workmanship, (See 4.6.1). 4. QUALITY ASSURANCE PROVISIONS (see 6.4) 4.1 Responsibility for inspection. Unless otherwise specified in the requirements as specified herein. Except as otherwise specified in
22、the con- tract, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the government. The .Ifovernment reserves the right to perform any of the inspections set forth in the specification, where such
23、inspections are deemed necessary to assure that the supplies and services conform to prescribed require- ments. contract, the contractor is responsible for the performance of all inspection . 4.2 Classification of inspection. The inspection of the bomb racks shall be classified as follows: a. b. Fir
24、st article inspection (see 4.3) Quality conformance inspection (see 4.4) 4.3 First article inspection. First article inspection shall consist of all of the inspections listed in Table I. First article inspection report format shall be in accordance with MIL-STD-831 see 6.3). 4.3.1 Sampling for first
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR22623A1980RACKBOMBEJECTORAIRCRAFTAERO20AANDAERO20BSERIES20A 20 航空 系列 飞机 喷射器 炸弹 机架 PDF

链接地址:http://www.mydoc123.com/p-981140.html