NAVY MIL-E-14719 A-1968 EXTENSION FUZE BOMB M1A1 (M1E1) PARTS FOR《M1A1(M1E1) 部件引爆扩展》.pdf
《NAVY MIL-E-14719 A-1968 EXTENSION FUZE BOMB M1A1 (M1E1) PARTS FOR《M1A1(M1E1) 部件引爆扩展》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-E-14719 A-1968 EXTENSION FUZE BOMB M1A1 (M1E1) PARTS FOR《M1A1(M1E1) 部件引爆扩展》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-E-Lq717A 13 77797Ob 027b397 b M -.% .- 5 37/9 iJ SCOPB .- 1.1 This specifica%ion contailzs special requirements not covered by the drawings ar?,$. grovides quaz-ity asstirame provisfons for the inert parts ror one type or“ stand off dev2ce designated as Extens:.on, FIZ%, YAl (NXZl). 2.1 The fo2.
2、lowing 3ocu-ents of the issue in effect on dco.te of invitaticn o? bids, or request :or pro2osels, Tom. a pmt of his specification to the extert s-ecq ,I a-. t.6 hePei2. SPECIFICAIIOKS F3DEFiAL TT-C-490 - C7em2ng Methods and Pretreatment 02 Ferrous Swfaces for Organ:-c Coatirlgs. MILITARY EIL-C-4566
3、2 - Drawirgs, Engineering TEbulct-ion (Copies of spec%fications, star_dards, rmings ant!. publicztiom requlrec? by sE3pliers in connectron with specific grocurement fu?ctions shouid. be obtalned rom the prccuring activity or as dimcted Sy the contrzcting officer , ) 2 Provided by IHSNot for ResaleNo
4、 reproduction or networking permitted without license from IHS-,-,-MIL-E-14719A (KU) 3, 3.1 Katerial. -Materials used in the fabricat:Lon of the inert parts E-hall Se in accwdmce with the app1:cable s:?ecficf $ - Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
5、om IHS-,-,-. MIL-9-14719A (MU) may use his own or any other fcciiit4es suitable for the performance . of the inspection requimments spectiied herein, unless disapproved . . Dy the Government. The Government reserves the right to perform my of the Inspecttons s documents . 4,l.l -. . f, Number of ite
6、ms in the lot. g. Date submitted. The cwtificate shall be signed by a responsible went of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal, be required with subsequent certificates unless, euring the cours
7、e of the contract, this authority is vested in another agent of the certifying organization. Substantiation of the agc?ntts authority will not 4.2 First Article Inspection 4.2.1 Subrnission.-Prior $6 initiating regulm production, the contractor shall submit five (-5) each bumter tube assemblies and
8、painted supports and five (5) complete sets of parts, unpainted, (Z.e., 5 each of each componen5 and subassembly excluding those of the bu?ster assembly) to a Government approved facility as designated by the contracting officer (see 6.4) for evaluatlon in accordame with ?rie povislons of 4.2.2. .1.
9、 Y: -3, 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*IL;-Z-*14719A (FJ) T3e Tirs3 srticlu smple shall c0nsis-i; of material that has beer, pPoor2geI as ctetern2ned by the Governmnt, shall Rot be deemea *Lo alter tke homogeneity of the lot, spec
10、tion lots shall comply 5th IV;LL-STD-ZOS. Wz.less otherwise approved- by the contracting oficer, the inspection lot size of end items deliverable under tie contract shall be not less than the sxallest weekly estimate of- quantities contractually sche6uled for production dwfng the contract-perioc nor
11、 more than the largest monthly quantity contrc.ctual7y scheduled 20, delivary during the contract period. Inspection lots of components-. or subassemblies, other khan the items 02 delivery, shall be homogeneous and of a size mutually convenient to 50th the contractor and the Government inspector, Lo
12、t nunbeping, as required, shall be in accordance wTth BEL-STD-1168. -I .ion. pei.formancc of the inspecticns listed shall be inaccordance with Alsc, at the optlon of the procuring Equrpment mcessary for the 4,304. . ._ I . Provided by IHSNot for ResaleNo reproduction or networking permitted without
13、license from IHS-,-,-.O XIL-E-14719A (M) 4t3.2.1 Burster support, before pair,t (see dg. 9231712-1 though -5 (as applicable) coverLne Wall thickness of pipe, minGage aram material not vis.le 360 de;reeS.,iVisual Hydrostatic test stamp mtssng (see 3.4).cViguai . 01001 . 01002 01003 - 01004 . O1005 01
14、006 01007 01008 O1009 02.010 02.011 . AQL 1,50 percent Internal chamfer missing al; male end. .Visual-Manual 03-013 Evidence of poor workcianship ( see 3.6) .Visual 07014 Total length, mln.eGe OL012 . ._ . .I . .I ? Provided by IHSNot for ResaleNo reproduction or networking permitted without license
15、 from IHS-,-,-. KLrE-14719A (PJJ) 4.3.2.2 Eurster support, . 9231712, as applicable) Code No. 10001, Minor defect.-Test panels shall be prepared in accord- ance with paragraph 4.2.8 of TT-(3-490 an8 shall be exposet! to a 5 percent salt spray in accordance with Method 811.1 of Fed. Test Method Stand
16、ard 151a for 96 hours. The pmels shall then be evaluated to the requirements of paragraph 3.9 of TT-C-490. Corrective action in accordance with 4.2.8 shall be implemented when indicated. 3.3) MEjor defect, Code No. 01015.-This test shall be performed 100 percent. using test equipment specified In 4.
17、3.4. to comply with the specified requirement shall be classed defective and removed from the lot. 4.3.3.2.2 Hydrostatic test of burster support assembly (see The test shall be performed as specified in 4.4.1, Any assembly which falls Provided by IHSNot for ResaleNo reproduction or networking permit
18、ted without license from IHS-,-,-4.3.4 Inspection Equlpinent.-Equipment Tabulation Nubers ET-9233.708 end ET-9238810 identify the irspection 5quipmentrequired to perform the examinations md tests prescribed in this section. coritractor shall desfgri 5nspection cquLpr.ent in accordance with the instr
19、uctions In 6.3 equipment drawings and lists provided and revised in accordance with the requirements of the ST may be used by DOD activities for design, procurement, mmufactuTe, testing, evaluation, production and receiviag inspection, overhaul, shipping, storage, . identification of stock, ordering
20、 and storage of replacement pmts, inspection of itens at overhaul, general maintenance of equipment, construction, survey and. whenever inspection equipment drawings are needed. of the equipment listed in the ET shall be in accordance with Specification ML-1-45607, a set of master gages, standazds,
21、and appropriate instruments for regularly scheduled calibrations of his acceptance inspection . equipment. Records of such regularly scheduled calibrations shall be maintained by the contractor ant! made available for review by the Government. The calibration of gages, standards, and Lnstnunents sha
22、ll be in accordance w%th Specification The 4.3.4,l Government rights to documenkation,-Inspectian 4.3.4.2 Supply and maintenance,-Supply and maintenance 4.3,4.3 Calibration.-The contractor. shall have available MIL-C-45662. 4.4 Test methods and procedures.-The test method and procedures described in
23、 each of the following tests represents only one method and one precedure which has been proven -n use and Is approved by the Goverment for Government acceptance p.mposcs. Producers and manufacturers have the option of using substitute methods and procedwes only after obtaining Government approval.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILE14719A1968EXTENSIONFUZEBOMBM1A1M1E1PARTSFORM1A1M1E1 部件 引爆 扩展 PDF

链接地址:http://www.mydoc123.com/p-978966.html