NAVY MIL-DTL-60292 B-2012 INITIATOR CARTRIDGE ACTUATED M99 ASSEMBLY《M99组件弹药驱动引爆器》.pdf
《NAVY MIL-DTL-60292 B-2012 INITIATOR CARTRIDGE ACTUATED M99 ASSEMBLY《M99组件弹药驱动引爆器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-DTL-60292 B-2012 INITIATOR CARTRIDGE ACTUATED M99 ASSEMBLY《M99组件弹药驱动引爆器》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、INCH-POUNDMIL-DTL-60292B 6 January 2012 SUPERSEDING MIL-I-60292A 30 March 1990 DETAIL SPECIFICATION INITIATOR, CARTRIDGE ACTUATED, M99 ASSEMBLY This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the requi
2、rements for the M99 Cartridge Actuated Initiator Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3, 4, or 5 of this specification. This section does not include documents cited in other sections of this specification or recommen
3、ded for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3, 4, or 5 of this specification, whether or not they are listed. 2.2 Go
4、vernment documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. DEPARTMEN
5、T OF DEFENSE SPECIFICATIONS MIL-A-2550 Ammunition, General Specification For MIL-I-60525 Initiator, Cartridge Actuated, M99 Metal Parts Assembly MIL-I-82767 Initiator, Cartridge Actuated, M99 Remanufactured Metal Parts Assembly DEPARTMENT OF DEFENSE STANDARDS MIL-STD-1168 Ammunition Lot Numbering An
6、d Ammunition Data Card MS28741 Hose Assembly, Detachable End Fitting, Medium Pressure (Copies of these documents are available online at https:/assist.daps.dla.mil/ or from the Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia PA 19111- 5094.) Comments, suggestions,
7、 or questions on this document should be addressed to DEPARTMENT OF THE NAVY, Indian Head Division, NSWC, Code E12AP, Document Control, 4123 Artisans Court, Suite 103, Indian Head, Maryland 20640-5085, OFFICIAL BUSINESS, or emailed to amanda.pennnavy.mil. Since contact information can change, you ma
8、y want to verify the currency of this information using the ASSIST Online database at https:/assist.daps.dla.mil. AMSC N/A FSC 1377 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license f
9、rom IHS-,-,-MIL-DTL-60292B 2 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation or c
10、ontract. DRAWINGS NAVAL ORDNANCE STATION, INDIAN HEAD, MD (CAGE CODE 19200 and 19203) 8597230 Cartridge, Impulse, M91 Assembly DL10520405 Initiator, Cartridge Actuated, M99, Assembly 8830984 Box, Fiberboard (Inner) Packing, Ammunition for Initiator, Cartridge Actuated M27, M86, M87, M98, M99, or XM1
11、07 8830985 Box, Packing, Ammunition for Initiator, Cartridge Actuated M27, M86, M87, M98, M99, or XM107 9241155 Box, Fiberboard (Outer) Alternative, Packing Ammunition for Initiator, Cartridge Actuated, M27, M86, M87, M98, M99, or XM107 (Application for copies should be addressed to DEPARTMENT OF TH
12、E NAVY, Indian Head Division, NSWC, Code E12P, Document Control, 4123 Artisans Court, Suite 103, Indian Head, Maryland 20640-5085, OFFICIAL BUSINESS.) 2.3 Non-Government publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the
13、 issues of these documents are those cited in the solicitation or contract. American National Standards Institute (ANSI)/American Society For Quality (ASQ) ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes (DoD adopted) ASQ A8402 Quality Management and Quality Assurance Vocab
14、ulary (Copies of this document are available online at http:/www.asq.org/, or from the American Society for Quality, PO Box 3005, 611 E. Wisconsin Ave., Milwaukee, WI 53201-4606.) American Society For Testing And Materials (ASTM) ASTM E1742/E1742M Standard Practice for Radiographic Examination (Copi
15、es of this document are available online at http:/www.astm.org/ or from the American Society for Testing and Materials Customer Service, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.) 2.4 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict bet
16、ween the text of this document and the references cited herein, the text of this document takes Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-60292B 3 precedence. Nothing in this document, however, supersedes applicable laws and regulations
17、 unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Materials. All materials used in the manufacture of the initiators shall conform strictly to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtai
18、ned from the cognizant Navy design activity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.2 Primary components. For the purpose of this specification, the M91 delay cartridge (
19、Drawing 8597230) is defined as a primary component. Only primary components from a single lot shall be used in a production lot of initiators. One primary component production lot may be used in more than one initiator production lot. 3.3 Breakaway torque. The chamber and cap of the assembled initia
20、tor shall withstand a breakaway torque application of 400 inch pounds without loosening or deformation (see 4.2.3.1). 3.4 Residual magnetism. The initiator shall not deflect the indicator of the compass more than five degrees in either direction using procedure 4.2.3.2. 3.5 Firing pin release. The f
21、iring pin of the assembled initiator, less safety pin, cartridge and chamber shall release from the cocked position when the application of an axial load of 18 to 25 pounds has withdrawn the initiator pin 0.370 inch, minimum, and 0.425 inch, maximum (see 4.2.3.3). 3.6 Initiator pin security. Applica
22、tion of an axial load of 200 to 220 pounds to the initiator pin of the assembled initiator shall not withdraw the initiator pin past the safety pin. Load application shall cause no permanent deformation of the safety pin (see 4.2.3.4). 3.7 Functional (see 4.2.3.5). 3.7.1 Ballistics. Initiators loade
23、d with cartridges from one accepted lot and temperature conditioned shall perform within the pressure values and ignition delay time (see 6.6.2) specified in table I. Pressure values shall be recorded at the end of 15 feet of aircraft hose, assembly number MS28741-4, and a pressure chamber with a vo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILDTL60292B2012INITIATORCARTRIDGEACTUATEDM99ASSEMBLYM99 组件 弹药 驱动 引爆 PDF

链接地址:http://www.mydoc123.com/p-978851.html