NAVY MIL-DTL-46992 E-2006 CUTTER DELAY PROPELLANT ACTUATED M21 (2 SEC) AND M22 (10 SEC)《 M21(2 秒) AND M22(10 秒)推进剂驱动延迟钻刀》.pdf
《NAVY MIL-DTL-46992 E-2006 CUTTER DELAY PROPELLANT ACTUATED M21 (2 SEC) AND M22 (10 SEC)《 M21(2 秒) AND M22(10 秒)推进剂驱动延迟钻刀》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-DTL-46992 E-2006 CUTTER DELAY PROPELLANT ACTUATED M21 (2 SEC) AND M22 (10 SEC)《 M21(2 秒) AND M22(10 秒)推进剂驱动延迟钻刀》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、 INCH-POUND MIL-DTL-46992E (OS) 16 November 2006 SUPERSEDING MIL-DTL-46992D (OS) 08 September 2003 DETAIL SPECIFICATION CUTTER, DELAY, PROPELLANT ACTUATED, M21 (2 SEC) AND M22 (10 SEC) This specification is approved for use within the Naval Sea Systems Command, Department of the Navy, and is availab
2、le for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements for the M21 (2 SEC) and M22 (10 SEC) Propellant Actuated Cutter (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified i
3、n sections 3, 4, or 5 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that the
4、y must meet all specified requirements of documents cited in sections 3, 4, or 5 of this specification, whether or not they are listed. 2.2 Government documents. 2.2.1 Specifications and standards. The following specifications, standards, and handbooks form a part of this document to the extent spec
5、ified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-W-5625 Webbing, Textile, Nylon, Tubular MIL-D-85866 Composition, Delay Z-1 MIL-P-22264 Powder, Ignition, Gasless, A-1A Comments, suggestio
6、ns, or questions on this document should be addressed to Commander, Indian Head Division, Naval Surface Warfare Center, Technical Information Products Branch (E143), 101 Strauss Avenue, Indian Head, MD 20640 5035, or emailed to amanda.pennnavy.mil. Since contact information can change, you may want
7、to verify the currency of this information using the ASSIST Online database at http:/assist.daps.dla.mil. AMSC N/A FSC 1377 DISTRIBUTION STATEMENT A: Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
8、,-,-MIL-DTL-46992E (OS) 2 DEPARTMENT OF DEFENSE STANDARDS MIL-STD-331 Fuse and Fuse Components, Environmental and Performance Tests for MIL-STD-810 Environmental Engineering Considerations and Laboratory Tests MIL-STD-1168 Ammunition Lot Numbering and Ammunition Data Card (Copies of these documents
9、are available online at http:/assist.daps.dla.mil/ or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094.) 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a
10、 part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. DOCUMENTS WS 21535 Ignition Device, Percussion, PVU-1/A DRAWINGS Naval Surface Warfare Center, Indian Head (CAGE Codes 19200 and 19203) 83
11、8AS115 Propellant, Double Base 838AS208 Propellant, Double Base 8873322 Cutter Tester DL8875978 Cutter, Propellant Actuated, 2 Second Delay, M21 DL8875979 Cutter, Propellant Actuated, 10 Second Delay, M22 8875988 Spring (Application for copies of these specifications and drawings should be addressed
12、 to the Commander, Indian Head Division, Naval Surface Warfare Center (E143), 101 Strauss Avenue, Indian Head, MD 20640-5035.) 2.3 Non-Government publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documen
13、ts are those cited in the solicitation or contract. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) E 1742 Standard Practice for Radiographic Examination (Copies of this document are available online at http:/www.astm.org or from the American Society for Testing and Materials Customer Service, 100
14、 Barr Harbor Drive, West Conshohocken, PA 19428-2959.) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-46992E (OS) 3 AMERICAN SOCIETY FOR QUALITY (ASQ) A8402 Quality Management and Quality Assurance - Vocabulary (Copies of this document are a
15、vailable online at http:/e-standards.asq.orq/ or from the American Society for Quality, 600 North Plankinton Avenue, Milwaukee, WI 53203.) 2.4 Order of precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence
16、. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection (see 6.4) in accordance with 4.2. 3.2 General. The cutte
17、rs shall comply with all requirements on drawings listed on DL8875978 or DL8875979. 3.3 Materials. All materials used in the manufacture of the cutters shall conform to the specifications referred to on the respective drawings unless specific approval in writing covering a departure has been obtaine
18、d from the cognizant Navy design activity prior to manufacture. When alternate methods of manufacture are specified in the drawings, the bidders selections shall be clearly stated in the proposal. Physical properties required shall be uniform throughout the part within specified tolerances. 3.4 Prim
19、ary components. For the purpose of this specification, the ignition material (MIL-P-22264), the primer (WS 21535), the delay mix (MIL-D-85866), and the output charge (Drawing 838AS115 or alternate 838AS208) are defined as primary components. Only primary components from a single lot shall be used in
20、 a production lot of cutters. One primary component production lot may be used in more than one cutter production lot. 3.4.1 Percussion Primers. Only percussion primers from a lot manufactured within the last 24 months or recertified within the last 12 months shall be used in the cutter. 3.5 Inspect
21、ions. 3.5.1 Primer x-ray. All primers shall be x-rayed and screened prior to assembly into the primer retainer (see 4.4.4). 3.5.2 Primer sensitivity. The primer shall fire when drop tested at an energy level of 26-inch-ounces in a primer retainer assembly (see 4.4.5). 3.6 Spring load and spring embr
22、ittlement. The springs shall not break and shall meet the requirements of Drawing 8875988 when tested as specified in 4.4.6 and 4.4.7. 3.7 Corrosion resistance. No component (except for the delay body, washer (retainer), and primer retainer) shall exhibit white corrosion products after one hundred h
23、ours of salt spray testing. The delay body, washer, and primer retainer shall not exhibit white corrosion products after 24 hours of salt spray testing (see 4.4.8). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-46992E (OS) 4 3.8 Airtightnes
24、s. All knife delay assemblies shall be leak tested and shall not exhibit a leakage rate in excess of 1 x 10-4cc of helium per second at a pressure differential of one atmosphere (see 4.4.9). 3.9 Lanyard assembly. The lanyard assembly shall withstand a tensile load of 200 pounds minimum without separ
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILDTL46992E2006CUTTERDELAYPROPELLANTACTUATEDM212SECANDM2210SECM212 ANDM2210 推进 驱动 延迟 PDF

链接地址:http://www.mydoc123.com/p-978831.html