NAVY MIL-C-81595-1968 CARTRIDGE IMPULSE MARK 127 MOD 0《标识为127的0型推动式炮筒》.pdf
《NAVY MIL-C-81595-1968 CARTRIDGE IMPULSE MARK 127 MOD 0《标识为127的0型推动式炮筒》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-81595-1968 CARTRIDGE IMPULSE MARK 127 MOD 0《标识为127的0型推动式炮筒》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、NIL-C-BL575 13 M 7777706 0433252 b MIL-C-81595 (AS) 30 August 1968 Superseding AS 1070 22 May 1967 MILITARY SPECIFICATION CARTRIDGE, IMPULSE, MARK 127 MOD O This specification has been approved by the Naval Air Systems command, Department of the Navy. - 1. SCOPE 1.1 This document governs the manufac
2、ture, assembly and preparation for delivery of the MARK 127 MOD O impulse cartridge and the methods of inspection and tests upon which product accep- tance will be based. 2. APPLICABLE DOCUMENTS 2.1 The following specifications, standards, drawings and publications, of the issue in effect on date of
3、 invitation for bids, form a part of this document to the extent specified herein. SPECIFICATIONS Military MIL-D-21625 Design and Evaluation of Cartridges for Cartridge Actuated Devices MIL-P-46610 MIL-P-116 STANDARDS Military MIL-STD-129 Primers, Percussion, Styphnate and Chlorate Types for Small A
4、rms Ammuni tion Preservation, Methods of Marking for Shipment and Storage I Licensed by Information Handling ServicesMIL-STD-414 DRAWINGS Bureau of Naval Weapons DL 25i967a LD 534526 LD 534527 ordnance Corps of the Army B-6200959 PUBLICATIONS BUSANDA Instruction 4030.17 Bureau of Naval Weapons OP 5
5、WR-43 0433253 A 9 TI ff, =* Sampling Procedures and Tables for Inspection by Variables for Percent Defective Cartridge, Impulse, MARX 127 MOD O, List of Drawings and Specification Container, Inner, for Cartridges, Impulse Container, Outer, for Cartridges, Impulse Primer (1 16M-2 8 2A) Preservation.,
6、 Packaging , Packing and Marking of Items; Navy Policy for Ammunition Ashore (This publication is not furnished to bidders and contractors by the procuring activity. Contractors should contact the Government Inspector for use of the publication.) Preparation of Quality Assurance Provisions (Copies o
7、f specifications, standards, drawings, and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the Contracting Officer.) 2 Licensed by Information Handling ServicesMIL-C-YJ 13 rn mwob 0431254 T m MIL-
8、C-81595 (AS) -i * 2.2 Other publications. The following document forms a part of this specification. Unless otherwise indicated, the issue in effect on date of invitation for bids shall apply. CODE OF FEDERAL REGULATIONS 49 CFR 71-78 Transportation, Interstate Commerce Commission, Explosives and Oth
9、er Dangerous Articles (Application for copies should be addressed to the Superintendent of Documents, Government Printing Office, Washington, D. C. 20402. Orders for the above publication should cite the latest edition and supplements thereto.) 3. REQUIREMENTS 3.1 General. 3.1.1 The MARK 127 MOD O i
10、mpulse cartridge covered by this document shall be manufactured in accordance with DL 2519678 and all documents listed thereon. 3.2 Material. All materials used in the manufacture of the cartridges shall conform strictly to the specifications referred to on the respective Bureau of Naval Weapons dra
11、wings unless specific approval in writing covering a departure therefrom has been obtained from the Navy design activity prior to manufacture. materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. When alternate 3.2.1 Prepr
12、oduction sample. Unless otherwise specified by the procuring activity, a preproduction sample of 76 MARK 127 MOD O impulse cartridges shall be manufactured using the same methods and procedures proposed for the production lot. tested as specified in 4.3.2 to determine whether the contractor, prior t
13、o starting production, is capable of manufacturing items which comply with the technical requirements of the contract. The sample will be 3.3 Primary components. For the purposes of this specifkcation, the primer (116M-282A), Army Ordnance Drawing B-6200959, and the main propellant charge are define
14、d as primary components. See 4.3.3. 3.3.1 The primers used in the MARK 127 MOD O impulse cartridge shall be r ac tured loaded with Olin Industries primer mixture No282A, manu- in accordance with.Army Ordnance Drawing B-6200959 (116M-282A) i- - Licensed by Information Handling ServicesMIL-C-1575 13 W
15、 777770b OV33255 L and accepted in accordance with the applicable requirements of MIL-P-46610, Class 1. The primers shall be from lots manufactured within a year past. See 4.7.1. 3.3.2 The overall assembled height of the primers used in the MARK 127 MOD O impulse cartridge shall be .119 + ,002 inch.
16、 Primers accepted in accordance with 3.3.1 shall be screened for selection of primers that meet the above dimensional requirement. 3.4 Primer X-ray. A11 primers shall be X-rayed and screened for defects as prescribed in 4.7.2. 3.5 Propellant charge. 3.5.1 Quantity. Propellant charge weights shall be
17、 as specified on Bureau of Naval Weapons Drawing 2519678 of LD 2519678. shall. be determined by weight rather.than by volume measurements. Charges 3.5.2 Smokeless powder, handling and loading. Do not subject the smokeless powder to unnecessary handling or exposure to the atmosphere. The handling and
18、 loading of smokeless powder exposed to the atmosphere shall be performed only under conditions that do not permit the relative humidity to exceed 75 percent. c 3.5.3 Smokeless powder condition. The smokeless powder utilized shall exhibit no evidence of decomposition. See 4.7.3. 3.5.4 Change in prop
19、ellant lot. Whenever a change occurs in the propellant lot for the main charge, validity of the charge determination shall be verified by performing the test prescribed in 4.9. 3.6 Cartridge inspection. 3.6.1 Visual inspection. The complete cartridge shall be free of the visible defects noed in 4.7.
20、4. 3.6.2 Leakage. cartridge. See 4.7.5. There shall be no leakage of air in the completed 3.6.3 X-ray. All cartridges manufactured under contract shall pass X-ray examination of 4.7.6. 3.7 Ballistic requirements. Cartridges from each production lot, selected in accordance with 4.2, shall meet the re
21、quirements listed below when subjected to the test prescribed in 4.7.7. 4 Licensed by Information Handling ServicesMIL-C-1575 33 m 7779706 0433256 3 m MIL-C-81595(As) 3.7.1 Velocity. 1.0 pound projectile shall be U = 215 ft/sec and L = 115 ft/sec, respectively, when tested in accordance with 4.7.7.
22、The upper and lower .limit of the velocity of the 3.7.2 Misfire. There shall be no misfires. See 4.7.7.2. 3.7.3 Hangfire. There shall be no hangfires. See 4.7.7.3. 3.8 Workmanship. Cartridges shall be constructed and finished in a manner to assure compliance with all requirements of this specifi- ca
23、tion. finishes and coatings. Particular attention should be directed to dimensions, 4. QUALITY ASSURANCE PROVISIONS 4.1 nless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise
24、 specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the Government. The Government reserves the right to perform any of the inspections set forth in *e specification where such inspections are deemed necessary to assure supplies and services conform to
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC815951968CARTRIDGEIMPULSEMARK127MOD0 标识 127 推动 炮筒 PDF

链接地址:http://www.mydoc123.com/p-978015.html