NAVY MIL-C-21679-1958 CD-10 MOD 1 MECHANISM《1型CD-10机械》.pdf
《NAVY MIL-C-21679-1958 CD-10 MOD 1 MECHANISM《1型CD-10机械》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-21679-1958 CD-10 MOD 1 MECHANISM《1型CD-10机械》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-C-21679 13 7779706 0431386 5 h -4 1.1 IL-C- 216 79 (N Or d ) 1 I MILITARY SPECIFICATION CD-10 MOD 1 MECHANISM 30 Non3uibaP 19% SUPERSEDING NAVORD OS 2848H 19 December 1956 1. SCOPE 1.1 This Specification establishes the requirements for the procurement of the clock-delay, CD-10 Mod 1 Mechanism.
2、The mechanism, which is used to control. underwater mine circuits, is a manually-wound, spring-driven clock with two normally open electrical switches which operate in sequence. 2. APPLICABLE DOCUMENTS 2.1 The following specifications, standards, drawings, and publications of the issue in effect on
3、date of invitation for bids, form a part of this specification. SPECIFICATIONS MILITARY MIL-S-6872 Soldering Processes, General Specifications for. STANDARDS MILITARY MIL-STD-105 Sampling Procedures and Tables MIL-STD-129 Marking for $hiPrnent and Storage. for Inspection by Attributes. Provided by I
4、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-21b77 13 777770b 0431387 7 I 3. REQUIREMENTS DRAWINGS 3.1 General reauirements. 3.i.i The clock delay, CD-10 Nod 1 Mechanism, shall be manufactured in accordance with LD 166774 and all documents I I listed the
5、reon. BUnEAU OF ORDNANCE - LD 166774 CD-10 Mod 1 Mechanism. LD 284699 Container, Inner, for Clock Delay Mechanisms. LD 284862 Container, Outer, for Clock Delay Mechanisms. 1476194 Marking Instructions for Storage and Chipping Containers. And all documents listed in the above LDfs and drawings. PUBLI
6、CATIONS . BUREAU OF ORDNANCE NAVORD OP 400 General Instructions for Design, Manufacture and Inspection of Naval Ordnance Equipment. (Copies of specifications, standards, drawings and pub- lications required by contractors in connection with specific procurement functions should be obtained from the
7、procuring activity or as directed by the contracting officer.) 3 J.2 The requirements and procedures established in OP 400 shall be complied with as applicable, 3.1.3 . Premoduction samle. - Unless otherwise speci- fied in the contract or order, a preproduction samde shall be manufactured by the sam
8、e procedures and processes and at the same location as proposed for full production. This sample will be tested for the purpose of determining com- pliance with the requirements of this specification, the drawinps, and the contract, See 4.1.2. 2 Provided by IHSNot for ResaleNo reproduction or networ
9、king permitted without license from IHS-,-,-MIL-C-21677 13 3739706 0431388 7 f- MiL-C-21679 (Nord) 3.1.4 Interchanpeability. - Component parts of assembled units (unless otherwise specified on the anplicable drawings) fabricated in strict agreement with their applicable draw- ings shall be interchan
10、geable and shall assemble with mating components of the unit without selection or fitting. If, during assembly of the fabricated parts of a unit, selection or fitting is required and changes in dimensions are necessary, no changes in the parts as delineated on applicable drawings shall be made witho
11、ut prior approval of the Bureau of Ordnance. 3.1.5 Conflicting requirements. - Conflicting require- ments arising between this specification and any other speci- fications, publications, or drawings listed herein shall be referred in writing to the procuring agency or appointed agent for interpretat
12、ion and clarification. Performance requirements and moduct characteristics. The mechanism covered by this specification shall meet the following performance requirements and product characteristics. 3.2.1 Solderinq. - Unless otherwise specified, solder- ing processes shall conform to the requirement
13、s specified in Military Specification MILOS-6872, Electrical connections shall be mechanically secure before soldering wherever possible, Only rosin flux containing no acid shall be used. rosin-core solder is permitted. been tested and accepted, shall be used to lubricate the Mainspring-and the Gear
14、 Train, 3.2 The use of 3.2.2 Lubrication. - Special purpose oils, which have See 6.2 and 6.3, 3.2.3 Assembls nuts, - Before tightening the nuts which secure the case, the nuts for the pillar studs which pro- trude from the bottom plate shall be secured with a torque of 10.5 I.5 pound-inches. CAUTION
15、: These nuts should not be loosened until the mechanism is ready for final assembly on a clock starter . All other No. 8 nuts shall be secured with a torque of 10.5 k.5 pound-inches with the exception of the cover retaining nuts which shall be secured with a torque of 4.5 *5 pound- inches. See 4.6.1
16、.2, CornDonents* - The following specific requirements apply to the indicated components. 3,2.4 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-C-2L677 13 m 7777706 0431387 O m * 3.2.4.1 Switches. - The switches shall comply with the 3.2.4.i.i
17、Contact clearance. - Vhile the switches are following requirements, when tested as specified in 4.6.2.1. in the open position, the clearance between the contacts of the A switch shall be 0.031 to 0,050 inch and between the con- tacts of the C switch shall be 0.031 to 0,090 inch. 3.2.4.1.2 Contact fo
18、rce. - %en the switches are in the open position, the inner contact arm assembly of each switch shall exert a force between 100 and 350 grams against the cam, and the outer contact arm assembly of each switch shall exert a force between 100 and 300 grams against the reinforcing angle. When the switc
19、hes are in the closed position, the con- tact force of each switch shall be not less than 60 grams. 3.2.4.1.3 Contact resistance. - With the switches in the closed position, the resistance of each pair of contacts shall not exceed 0.1 ohm at the contact arm terminals. When measured at the terminal l
20、ugs of the cable assembly, the re- sistance throUgh each switch must not exceed 0.2 ohm. 0.001 inch gap between pillars and the bottom plate when measured before securing the case. Measure as specified in 4.6.2.2. 3.2.4.2 Bottom plate assembly. - There shall be less than 3.2.5 Completed mechanism. -
21、 The following requirements apply to the completed mechanism. 3.2.5.1 Insulation resistance. - Vhen tested as speci- fied in 4.6.3.1, the insulation resistance shall be not less than 50 megohms: tacts when in the open position. (a) Between the contact springs of each pair of con- (b) Between each co
22、ntact spring and all other contact (c) Between each contact sprir,g and the frame of the 3.2.5.2 Operation. - In any position, the mechanism springs . me chanism. shall operate as required by this specification. Testing shall be as specified in 4.6.3.2. 4 Provided by IHSNot for ResaleNo reproduction
23、 or networking permitted without license from IHS-,-,-MIL-C-21679 13 H 9799906 0931390 7 = / i 3.2.5.3 Verge adlustment. - The verge shall be ad2usted to provide the same amount of drop between the corner of the incoming pallet and the escape wheel tooth as there is be- tween the corner of the d.epa
24、rting pallet and the escape wheel tooth. Adjustment and testing shall be as specified in 4.6.3.3 . 3.2.5.4 Lockinn and startinq. - The mechanism shall op- The mechanism shall operate when the erate when the stop lever is depressed by a force not greater than 2 i/4 pounds. stop lever is 0.095 inch fr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC216791958CD10MOD1MECHANISM1 CD10 机械 PDF

链接地址:http://www.mydoc123.com/p-977507.html