1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MWI 8715.2 REVISION G EFFECTIVE DATE: September 16, 2008 EXPIRATION DATE: September 16, 2013 MARSHALL WORK INSTRUCTION QD01 LOCKOUT/TAGOUT PROGRAM Provided by IHSNot
2、for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction QD01 Lockout/Tagout Program MWI 8715.2 Revision: G Date: September 16, 2008 Page 2 of 42 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE
3、 CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 12/13/99 Revision A 9/15/00 This document is being updated to close RCAR 157. Document numbering revised in accordance with MPG 1410.2, paragraph 3.3.1.1.b. Re
4、vision B 5/21/01 3.2 added “Training”. 3.3 added “Selection of work practices”, 3.4 added “Safeguards for personal protection”, 4.3 added ”Electrical Safety”, 4.5 added MWI 8715.15, 5.3 added training requirements, added last sentence to 5.10 and 5.11, 6.7.4 added modified equipment, 6.7.6 added new
5、 purchased equipment, 6.9 added and this document, 8.2 added all exposed terminals, 8.2.1 added guard all exposed, 8.3 deleted PPE and special precautions, 8.4 added PPE, 8.5 added JHA, 9.2 added procedures, 9.3 added detailed survey, 9.4 added NSTC 814, 9.5 added certification program, 9.6 added JH
6、A, 9.7 added NSTC 309, 10.1 deleted, 10.1 renumbered, 10.2 added NSTC 814, 10.3.1 deleted, 10.3 added NSTC 309, 10.4 added supervisor shall, 10.4 deleted 10.5 added supervisor ensure, 10.6 deleted, 10.7 deleted. Revision C 9/19/2004 Major rewrite, affected all sections, added appendices. Revised per
7、 HQ rules review. Editorial correction to 6.3.15 made by DM on 10/29/2004) Revision D 8/4/2005 Major rewrite affecting most sections. The rewrite is mostly grammar and intended make the document flow better, easier to read, clarify when a written procedure is required, and when MSFC standardized loc
8、ks and tags are to be removed and replaced with configuration locks/tags, revised Form 4287 Revision E 7/6/2006 Rewrite affecting all sections based on the results of a HQ audit of the LO/TO program. Reduced the size of the document and rearranged some sections and topics to better describe and clar
9、ify the process. Clarified requirements for 1) when a written procedure is required, 2) the review and documentation of these procedures, 3) changed information (dates) required on tag to match current tag, 4) developed a standard training for all authorized employee including contractors, 5) better
10、 defined the use of configuration locks and tags. Removed Appendices K and Z. Revision F 10/10/2007 Revised Applicability, added definition for standard work practice, and added new LO/TO tag. General rewording in most sections in an attempt to provide clearer requirements and make the MWI read easi
11、er. Deleted original Appendices H and K. Revision G 9/16/2008 Revised 2. Applicability statement to address the applicability of this directive to the Michoud Assembly Facility. Changed Department to Branch and ISD to ISB. Added references to MSFCs MAF. Changed Appendices to Chapters. Moved 2.2 to 6
12、.1. Added reference to MSFC S b. Have the same or similar type controls; c. Have the same sequence of procedural steps to shut-down, place and LO/TO devices; d. Have the same requirements for testing the equipment/system to determine and verify the equipment/system is safe to perform service/mainten
13、ance activities. 6.3.2.5 If a general energy-control procedure is written in accordance with 6.3.2.4 it can allow equipment/systems to be grouped together. It also permits the procedures to be inspected/reviewed by the type of procedure and considered as a single procedure for the annual inspection/
14、review in accordance with 6.8.7 and OSHA Standard Interpretation 03-09-2004, “LO/TO periodic inspection requirements.” 6.3.2.6 Equipment/systems powered by the same type electrical panel or same voltage level panel, but do not have similar type controls, or operate differently, or are constructed di
15、fferently shall not be considered as similar equipment/systems. 6.3.2.7 Energy-control procedures shall only be written by employees that have received training in energy-control safe-work practices in accordance with section 10.2. NOTE: This employee is not required to be listed in CERTRAK or in th
16、e FMO database for construction as an MSFC or MSFCs MAF authorized employee unless they actually place the LO/TO device and perform the service/maintenance activity. 6.3.3 Organizational standard energy-control safe-work practices. 6.3.3.1 Organizational standard energy-control safe-work practices s
17、hall at a minimum require the following: Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction QD01 Lockout/Tagout Program MWI 8715.2 Revision: G Date: September 16, 2008 Page 14 of 42 CHECK THE MASTER LIST at https:/repository.ms
18、fc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE a. Be documented and inspected/reviewed periodically and not to exceed an annual review in accordance with 6.8 by the organization with all authorized employees that perform LO/TO using the safe-work practices.
19、b. Clearly state the procedural steps to safely shutdown the equipment/system. c. Clearly state the procedural steps to place the equipment/system in a zero-energy state and release any stored or hazardous energy. d. Clearly state the procedural steps to place and remove LO/TO devices. e. Clearly st
20、ate the requirements for testing the equipment/system to verify the effectiveness of the LO/TO devices. 6.4 LO/TO Devices 6.4.1 LO devices defined in 5.18 and TO devices defined in 5.28 are used to control energy and shall be substantial enough to prevent their removal without the use of excessive f
21、orce or unusual techniques, such as with the use of bolt cutters or other metal cutting tools. 6.4.1.1 These devices include, but not limited to, locks, chains, wedges, key blocks, adapter pins, and/or self-locking fasteners. 6.4.1.2 A tag attached to the energy-isolation device can serve as a LO/TO
22、 only if the energy-isolation device cannot accept any of the devices listed in 6.4.1.1 and approval is obtained in accordance with 6.4.9. 6.4.2 Each organization performing service/maintenance activities shall provide the required LO/TO devices to their authorized employees to safely isolate the eq
23、uipment/system from its energy sources, and prevent the unauthorized energization of the equipment/system during service/maintenance activities. 6.4.3 All LO/TO devices shall be installed where they are clearly visible, so every employee understands that removing the LO/TO device or attempting to op
24、erate the equipment/system by moving the energy-isolation device from the “safe” or “off” position to the “on” position is strictly prohibited. 6.4.3.1 Any employee discovered attempting to remove a LO/TO device is subject to disciplinary action described in section 6.9. 6.4.4 Standardized LO/TO dev
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMWI87152REVG2008LOCKOUTTAGOUTPROGRAM 阀门 关闭 装置 项目 PDF

链接地址:http://www.mydoc123.com/p-822918.html