ITU-T M 510-1988 Readjustment to the Nominal Value of a Regulated Line Section (on a Symmetric Pair Line a Coaxial Line or a Radio-Relay Link) - General Maintenance Principles - Mams .pdf
《ITU-T M 510-1988 Readjustment to the Nominal Value of a Regulated Line Section (on a Symmetric Pair Line a Coaxial Line or a Radio-Relay Link) - General Maintenance Principles - Mams .pdf》由会员分享,可在线阅读,更多相关《ITU-T M 510-1988 Readjustment to the Nominal Value of a Regulated Line Section (on a Symmetric Pair Line a Coaxial Line or a Radio-Relay Link) - General Maintenance Principles - Mams .pdf(1页珍藏版)》请在麦多课文档分享上搜索。
1、CCITT FASCICLE 1V.L * = 48b259L 0505385 T I! - is the same as the end of a line link without complete demodulation to the groups, supergroups or mastergroups (i.e. when only part of the groups, supergroups, etc., are through-connected direct from one line link to another, without passing via the thr
2、ough-connection equipment to the basic groups); avoid sending a measuring frequency that is the same as a pilot frequency of a following regulated line section (unless the pilot frequency on such a following section is protected by a blocking filter at the beginning of the section); take into accoun
3、t the possibility of attenuation to additional measuring frequencies lying at the edges of the frequency band of a through-connected basic group, supergroup, etc., due to the presence of through-connection filters. ii) Interference between additional measuring frequencies on adjacent coaxial links i
4、s possible if precautions are not taken to avoid carrying out simultaneous measurements on adjacent links. For this reason: a) there should be different dates for routine maintenance measurements on two adjacent links; b) before making any measurement using an additional measuring frequency, and esp
5、ecially those made when clearing faults, repeater station staff should see to it that measurements are not in progress on an adjacent coaxial link. the maintenance personnel should: a) b) 3 Symmetric pair regulated line section The following measurements should be made at regulated line section term
6、inal stations: a) b) daily reading of the line pilot level if necessitated by the type of system. It is preferable that such measurements should always be made at the same time of day; as necessary, readjustment to the nominal value as described in Recommendation M.510. The Administrations concerned
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTM5101988READJUSTMENTTOTHENOMINALVALUEOFAREGULATEDLINESECTIONONASYMMETRICPAIRLINEACOAXIALLINEORARADIORELAYLINKGENERALMAINTENANCEPRINCIPLESMAMSPDF

链接地址:http://www.mydoc123.com/p-799839.html