ITU-T M 475-1988 Setting up and Lining up Mixed Analogue Digital Channels for International Telecommunication Services - General Maintenance Principles - Maintenance of Internations (S.pdf
《ITU-T M 475-1988 Setting up and Lining up Mixed Analogue Digital Channels for International Telecommunication Services - General Maintenance Principles - Maintenance of Internations (S.pdf》由会员分享,可在线阅读,更多相关《ITU-T M 475-1988 Setting up and Lining up Mixed Analogue Digital Channels for International Telecommunication Services - General Maintenance Principles - Maintenance of Internations (S.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、CCITT FASCICLE 1V.L * W 48b25L - 05053b5 4 I! Recommendation M.475 SETTING UP AND LINING UP MIXED ANALOGUE/DIGITAL CHANNELS FOR INTERNATIONAL, TELECOMMUNICATION SERVICES 1 Check of FDM multiplex or transmultiplexer equipment The FDM multiplex or transmultiplexer equipment, before it is connected to
2、a group or supergroup link, must be checked to ensure that it meets CCITT Recommendations and the other relevant specifications. The check should include a general visual inspection and vibration tests, if applicable. This is of particular importance if the equipment has remained unused since accept
3、ance tests were carried out after installation. 2 Setting up and lining up mixed analogueldigital channels The definition of a mixed analogue/digital channel is given in Recommendation M.300. When these channels are used for international telephone circuits, the required circuit transmission loss wi
4、ll in many cases be established through the use of variable loss pads in the transmultiplexer. For these mixed analogue/digital channel applications, Administrations may, through bilateral agreement, defer the separate channel line-up procedures contained in this Recommendation, and perform, instead
5、, the appropriate circuit section and circuit line-up procedures of Recommendation M.580. As a prerequisite to setting up and lining up channels using the procedures in this Recommendation, the involved group and supergroup links shall have been set up and lined up in accordance with Recommenda- tio
6、n M.460. 2.1 Measurement and adjustment of levels Depending upon the type of test equipment used, and the access features of the transmultiplexer, the following procedures may require taking an entire transmultiplexer out of service while each channel is being lined up. Careful consideration should
7、be given to procedures for removing transmultiplexers from service, and for restoring them to service, especially where the group links which terminate on the transmultiplexer are not co-terminous, or where international leased circuits are provided on transmultiplexers. 2.1.1 Transmultiplexers at e
8、ach end of the group or supergroup link Note - These configurations are shown in a) and b) of Figure 1/M.475. After the group or supergroup links have been set up, and the transmultiplexing equipments at the ends of the group or supergroup links have been checked and connected, the channels are adju
9、sted as follows. At the transmitting end, a bit sequence corresponding to 1020 Hz) test tone at a level of - 10 dBmO is applied to the 64 kbit/s time slot appearance of each channel in turn, at the digital path access point associated with the input to the transmultiplexer, using appropriate digital
10、 test equipment. At the receiving end, the 64 kbit/s time slot appearance of each channel is monitored in turn at the digital path access point associated with the output of the transmultiplexer, using appropriate digital test equipment, and each channel is adjusted as near as possible to its nomina
11、l level. 2.1.2 24-channel transmultiplexer at one end of the group links, with channel translating equipment ad the ofher end Note - This configuration is shown in c) of Figure WM.475. After the group links have been set up, and the transmultiplexing and channel translating equipments at the ends of
12、 the group links have been checked and connected, the channels are adjusted as follows. Transmitting from the channel translating equipment towards the transmultiplexer, an 1020 Hz 1) test signal is sent over each channel in turn at a level of - 10 dBmO. The channel translating equipment is adjusted
13、 so that the sideband level on each channel is as near to the nominal level as possible. At the receiving end, the 64 kbit/s time slot corresponding to each channel is monitored in turn at the digital path access point associated with the output of the transmultiplexer, and each channel is adjusted
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ITUTM4751988SETTINGUPANDLININGUPMIXEDANALOGUEDIGITALCHANNELSFORINTERNATIONALTELECOMMUNICATIONSERVICESGENERALMAINTENANCEPRINCIPLESMAINTENANCEOFINTERNATIONSSPDF

链接地址:http://www.mydoc123.com/p-799826.html