GMKOREA EDS-T-5525-2008 FUEL SYSTEM STATIC ELECTRICITY TEST.pdf
《GMKOREA EDS-T-5525-2008 FUEL SYSTEM STATIC ELECTRICITY TEST.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-5525-2008 FUEL SYSTEM STATIC ELECTRICITY TEST.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、GM DAEWOO Auto Size of vector force of unit point charge having plus polarity 4.2. Static Charge Meter; Device that measures charge differential between two points as a measure of the electric field 4.3. Electric Charge Sensor; Device that senses fluid flow and computes charge density per area for a
2、verage flow 5. TEST PREPARATION 5.1. TEST EQUIPMENT 13.0 V 0.2 V 6.1.3. Measurement Procedure Prior to test (prior to test temperature soaking), ensure vehicle ready condition. Measure the resistance between the ground and the static charge measurement points. Measurement Points: Assembly areas betw
3、een parts, sharp edge areas, corrosion prevention areas, non-conductive material areas, etc. Fill Aircraft Oil into Fuel Tank and activate Fuel Pump. Use Conductivity Meter to measure conductivity of aircraft oil using unit of Picosiemens/Meter. Measure and record Fuel Flow Pressure. The distance be
4、tween Static Charge Meter and target measurement point shall be 5Cm. Measure plus voltage at each measurement point. At the point of the highest plus voltage, measure its variation over time and record. In general, measurements should be at about 10 minute intervals. However, interval can be varied
5、considering plus voltage variation time. For Cold Test, cold protection clothing shall be worn EDS-T-5525FUEL SYSTEM STATIC ELECTRICITY TEST PAGE: 4/5 ISSUED DATE: 1998. 01. 08 REVISED DATE: 2008. 11. 04 VERSION: 3 GM DAEWOO Auto 13.0 V 0.2 V 6.2.2. Measurement Procedure Move vehicle to Cold Chamber
6、 and replace Fuel Tank with an empty tank. Lift test vehicle with a lift jack by about 30Cm from floor and install a support platform underneath to facilitate test measurement. Here, make sure that the support platform is stably fixed when vehicle is moved a little. Pour in Aircraft oil for testing
7、into Fuel Tank, use power supply to admit test voltage directly to Fuel Pump power line so that other electrical devices are not powered. Eliminate fuel line at Injector end to prevent Aircraft Oil from going into Injector. Use a connection pipe to enable fuel feedback. Allow 24 hour soaking of test
8、 vehicle with Fuel Pump only in operation in the Cold Chamber. Measure Insulation Resistance of non-conductive parts to vehicle body prior to vehicle soaking. Measure and record resistance values of conductive parts. The distance between Static Charge Meter and target measurement points shall be 5Cm
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST55252008FUELSYSTEMSTATICELECTRICITYTESTPDF

链接地址:http://www.mydoc123.com/p-757176.html