GEIA EIA-830-2000 Model for Integrating Metrics into the Procurement Process (Formerly TechAmerica EIA-830)《整体米制应用于征购的模式》.pdf
《GEIA EIA-830-2000 Model for Integrating Metrics into the Procurement Process (Formerly TechAmerica EIA-830)《整体米制应用于征购的模式》.pdf》由会员分享,可在线阅读,更多相关《GEIA EIA-830-2000 Model for Integrating Metrics into the Procurement Process (Formerly TechAmerica EIA-830)《整体米制应用于征购的模式》.pdf(38页珍藏版)》请在麦多课文档分享上搜索。
1、EIASTANDARDModel for Integrating Metrics intothe Procurement ProcessEIA-830FEBRUARY 2000ELECTRONIC INDUSTRIES ALLIANCEEIA-830Copyright Government Electronics for what purpose; during which phase of theproducts life cycle, for which areas of operational improvement; are fundamentaldecisions to be mad
2、e by each supplier as appropriate to their own management styleand business strategy.This document is designed to serve as a model for all customers and suppliers. Itoffers a list of metric categories that are in use in the industry today. It relates theirstrategic, tactical, and local utility to va
3、rious functions. Metrics listed are neither allinclusive, nor reflective of a minimum set. The point to keep in mind is that metricsare value-added information, which in itself has an acquisition cost and someassociated value. Metrics may be simple observations or complex calculations,repetitive in
4、nature or single events, manually generated or automatically produced bythe process. The business process, however, must provide for them in an economicalmanner in proportion to their worth. Costly modifications to supplement establishedprocesses solely for the generation of arbitrary management ind
5、icators will likely notbe cost effective.B. Documentation of Selected MetricsAlthough not the desired state, specific metrics may be contractually required. Othersmay be the result of customer influence to aid them in their oversight responsibility.Experience indicates that most will result from the
6、 suppliers documented processes fordesign, development, production, installation, and servicing (as applicable to thebusiness). All will likely be dynamic, changing with the various acquisition phases, withimprovements in the quality management system, and with the overall maturity of thecompany.Acc
7、ordingly, suppliers are advised to document a metrics management process, in lieu ofspecific metrics, to support both the acquisition process and the changing needs of thecompany. Contractually required metrics should be the exception rather than the rule,and when required, should be readily negotia
8、ble as change is indicated during the productlife cycle.Copyright Government Electronics yield; performance;and completeness. These categories are combined and weighted according to wherethe product falls on the simple to complex axis (emphasis on the yield andCopyright Government Electronics and th
9、e manner that these data are captured in and the subsequentstorage/analysis/communication of related information.b. Past Performance (NOTE: This area is still under review within the USGsponsored Past Performance Coordinating Council)D. Model Updates and CommentsThis section will be completed by the
10、 standards writing body that releases this model asan industry standard.Copyright Government Electronics value added (also called“effectiveness“).Outcome The result of using metrics to achieve decisions and/or their application or implementationto achieve a desired goal or objective.Output Specific
11、products and/or services delivered to your customer(s).Performance BasedContracting (PBC)Structuring all aspects of an acquisition around the purpose of the work to be performed asopposed to either the manner by which the work is to be performed or broad and imprecisestatements of work.Requirement W
12、hat the customer wants; something specifically requested and needed.Stakeholder A person or entity that has an interest in but is not a direct recipient of your work.Strategic Metric A high level of measurement exemplified by metrics provided to senior management (e.g.,Center Director, Enterprise AA
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GEIAEIA8302000MODELFORINTEGRATINGMETRICSINTOTHEPROCUREMENTPROCESSFORMERLYTECHAMERICAEIA830 整体 米制 应用于
链接地址:http://www.mydoc123.com/p-754555.html