ETSI TR 145 913-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Optimized transmit pulse shape for downlink Enhanced General Packet Radio Service (EGPRS2-B) (V14 0.pdf
《ETSI TR 145 913-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Optimized transmit pulse shape for downlink Enhanced General Packet Radio Service (EGPRS2-B) (V14 0.pdf》由会员分享,可在线阅读,更多相关《ETSI TR 145 913-2017 Digital cellular telecommunications system (Phase 2+) (GSM) Optimized transmit pulse shape for downlink Enhanced General Packet Radio Service (EGPRS2-B) (V14 0.pdf(61页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI TR 145 913 V14.0.0 (2017-04) Digital cellular telecommunications system (Phase 2+) (GSM); Optimized transmit pulse shape for downlink Enhanced General Packet Radio Service (EGPRS2-B) (3GPP TR 45.913 version 14.0.0 Release 14) TECHNICAL REPORT GLOBAL SYSTEM FOR MOBILE COMMUNICATIONSRETSI ETSI T
2、R 145 913 V14.0.0 (2017-04)13GPP TR 45.913 version 14.0.0 Release 14Reference RTR/TSGR-0645913ve00 Keywords GSM ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucratif enregi
3、stre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice The present document can be downloaded from: http:/www.etsi.org/standards-search The present document may be made available in electronic versions and/or in print. The content of any electronic and/or print versions of the present docu
4、ment shall not be modified without the prior written authorization of ETSI. In case of any existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept on a specific network drive with
5、in ETSI Secretariat. Users of the present document should be aware that the document may be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at https:/portal.etsi.org/TB/ETSIDeliverableStatus.aspx If you find errors in the prese
6、nt document, please send your comment to one of the following services: https:/portal.etsi.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm except as authorize
7、d by written permission of ETSI. The content of the PDF version shall not be modified without the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. European Telecommunications Standards Institute 2017. All rights reserved. DECTTM, PLUGTES
8、TSTM, UMTSTMand the ETSI logo are Trade Marks of ETSI registered for the benefit of its Members. 3GPPTM and LTE are Trade Marks of ETSI registered for the benefit of its Members and of the 3GPP Organizational Partners. GSM and the GSM logo are Trade Marks registered and owned by the GSM Association.
9、 ETSI ETSI TR 145 913 V14.0.0 (2017-04)23GPP TR 45.913 version 14.0.0 Release 14Intellectual Property Rights IPRs essential or potentially essential to the present document may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI memb
10、ers and non-members, and can be found in ETSI SR 000 314: “Intellectual Property Rights (IPRs); Essential, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (https:/ipr.etsi
11、.org/). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the
12、 present document. Foreword This Technical Report (TR) has been produced by ETSI 3rd Generation Partnership Project (3GPP). The present document may refer to technical specifications or reports using their 3GPP identities, UMTS identities or GSM identities. These should be interpreted as being refer
13、ences to the corresponding ETSI deliverables. The cross reference between GSM, UMTS, 3GPP and ETSI identities can be found under http:/webapp.etsi.org/key/queryform.asp. Modal verbs terminology In the present document “should“, “should not“, “may“, “need not“, “will“, “will not“, “can“ and “cannot“
14、are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of provisions). “must“ and “must not“ are NOT allowed in ETSI deliverables except when used in direct citation. ETSI ETSI TR 145 913 V14.0.0 (2017-04)33GPP TR 45.913 version 14.0.0 Release 14
15、Contents Intellectual Property Rights 2g3Foreword . 2g3Modal verbs terminology 2g3Foreword . 5g3Introduction 6g31 Scope 7g32 References 8g33 Definitions, symbols and abbreviations . 9g33.1 Definitions 9g33.2 Symbols 9g33.3 Abbreviations . 9g34 Objectives . 10g34.1 Performance objectives 10g34.1.1 Da
16、ta throughput improvements . 10g34.2 Compatibility objectives . 10g34.2.1 Maintenance of voice quality 10g34.2.2 Data throughput 10g34.2.3 Implementation impacts to new Mobile Stations 10g34.2.4 Implementation impacts to BSS 10g34.2.5 Impacts to network planning . 10g34.2.6 Compatibility with Multi-
17、User Reusing-One-Slot (MUROS) 11g35 Study item pre-requisites 12g35.1 Introduction 12g35.2 Preliminary boundary conditions for pulse shape optimisation 12g35.2.1 Introduction. 12g35.2.2 Time domain . 12g35.2.3 Frequency domain 12g35.3 Network configurations for pulse shape evaluation . 12g35.4 Legac
18、y MS Rx filter working assumption 14g35.5 Legacy MS type . 14g36 Network level analysis . 15g36.1 Introduction 15g36.2 Network scenarios and simulation assumptions . 15g36.2.1 Resource allocation . 15g36.3 Link to system interface . 16g36.4 Interference statistics 16g36.5 Interference profile for li
19、nk level analysis 17g36.5.1 Results 17g37 Pulse shape optimisation 18g37.1 Introduction 18g37.2 Candidate pulse shapes from 4 18g37.2.1 Optimisation assumptions. 18g37.2.2 Results 18g37.2.2.1 Spectrum . 18g37.2.2.2 Adjacent channel protection 20g38 Link level studies . 20g38.1 Introduction 20g38.2 L
20、ink to system interface . 21g38.2.1 Introduction. 21g38.2.2 Simulation assumptions 21g38.2.3 Link level performance . 21g3ETSI ETSI TR 145 913 V14.0.0 (2017-04)43GPP TR 45.913 version 14.0.0 Release 148.2.4. Legacy voice receiver . 23g38.2.4.1 Front-end filter 23g38.2.5 EGPRS2 receiver 23g38.2.5.1 I
21、ntroduction . 23g38.2.5.3 Candidate pulse #2 24g38.2.5.4 Candidate pulse #3 27g38.2.5.5 Receiver noise . 30g38.2.5.6 First Stage Mapping (CIR to BER) . 30g38.2.5.7 Second Stage Mapping (BER to BLER) . 32g38.2.5.8 Second Stage Mapping for Non-hopping Channel 36g39 System level studies . 40g39.1 Intro
22、duction 40g39.2 System Performance Evaluation . 40g39.2.1 Evaluation method 40g39.2.2 System performance results 40g39.2.2.1 Evaluation method 40g39.2.2.2 Impact on speech quality . 42g39.2.2.3 Impact on data throughput 44g310 Summary 47g311 Conclusion 49g3Annex A: Candidate pulse shape coefficients
23、 50g3A.1: Candidate pulse shapes from 4 50g3Annex B: Network statistics 52g3B.1 CDFs for Scenario A 52g3B.2 CDFs for Scenario B 53g3B.3 CDFs for Scenario C 55g3B.4 CDFs for Scenario D 56g3B.5 Noise CDFs for all scenarios 58g3Annex C: Change history 59g3History 60g3ETSI ETSI TR 145 913 V14.0.0 (2017-
24、04)53GPP TR 45.913 version 14.0.0 Release 14Foreword This Technical Report has been produced by the 3rdGeneration Partnership Project (3GPP). The contents of the present document are subject to continuing work within the TSG and may change following formal TSG approval. Should the TSG modify the con
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSITR1459132017DIGITALCELLULARTELECOMMUNICATIONSSYSTEMPHASE2GSMOPTIMIZEDTRANSMITPULSESHAPEFORDOWNLINKENHANCEDGENERALPACKETRADIOSERVICEEGPRS2BV140PDF

链接地址:http://www.mydoc123.com/p-737179.html