ETSI EN 305 200-1-2018 Access Terminals Transmission and Multiplexing (ATTM) Energy management Operational infrastructures Global KPIs Part 1 General requirements (V1 1 1).pdf
《ETSI EN 305 200-1-2018 Access Terminals Transmission and Multiplexing (ATTM) Energy management Operational infrastructures Global KPIs Part 1 General requirements (V1 1 1).pdf》由会员分享,可在线阅读,更多相关《ETSI EN 305 200-1-2018 Access Terminals Transmission and Multiplexing (ATTM) Energy management Operational infrastructures Global KPIs Part 1 General requirements (V1 1 1).pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、 ETSI EN 305 200-1 V1.1.1 (2018-07) Access, Terminals, Transmission and Multiplexing (ATTM); Energy management; Operational infrastructures; Global KPIs; Part 1: General requirements EUROPEAN STANDARD ETSI ETSI EN 305 200-1 V1.1.1 (2018-07) 2Reference DEN/ATTM-003 Keywords broadband, energy manageme
2、nt, ICT, sustainability ETSI 650 Route des Lucioles F-06921 Sophia Antipolis Cedex - FRANCE Tel.: +33 4 92 94 42 00 Fax: +33 4 93 65 47 16 Siret N 348 623 562 00017 - NAF 742 C Association but non lucratif enregistre la Sous-Prfecture de Grasse (06) N 7803/88 Important notice The present document ca
3、n be downloaded from: http:/www.etsi.org/standards-search The present document may be made available in electronic versions and/or in print. The content of any electronic and/or print versions of the present document shall not be modified without the prior written authorization of ETSI. In case of a
4、ny existing or perceived difference in contents between such versions and/or in print, the only prevailing document is the print of the Portable Document Format (PDF) version kept on a specific network drive within ETSI Secretariat. Users of the present document should be aware that the document may
5、 be subject to revision or change of status. Information on the current status of this and other ETSI documents is available at https:/portal.etsi.org/TB/ETSIDeliverableStatus.aspx If you find errors in the present document, please send your comment to one of the following services: https:/portal.et
6、si.org/People/CommiteeSupportStaff.aspx Copyright Notification No part may be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm except as authorized by written permission of ETSI. The content of the PDF version shall not be modified wi
7、thout the written authorization of ETSI. The copyright and the foregoing restriction extend to reproduction in all media. ETSI 2018. All rights reserved. DECTTM, PLUGTESTSTM, UMTSTMand the ETSI logo are trademarks of ETSI registered for the benefit of its Members. 3GPPTM and LTETMare trademarks of E
8、TSI registered for the benefit of its Members and of the 3GPP Organizational Partners. oneM2M logo is protected for the benefit of its Members. GSMand the GSM logo are trademarks registered and owned by the GSM Association. ETSI ETSI EN 305 200-1 V1.1.1 (2018-07) 3Contents Intellectual Property Righ
9、ts 5g3Foreword . 5g3Modal verbs terminology 6g3Introduction 6g31 Scope 7g32 References 7g32.1 Normative references . 7g32.2 Informative references 8g33 Definitions, symbols and abbreviations . 8g33.1 Definitions 8g33.2 Symbols 9g33.3 Abbreviations . 10g34 Context for Key Performance Indicators (KPI)
10、 10g34.1 Energy management and sustainability concepts . 10g34.2 Differentiation of Key Performance Indicators 10g34.2.1 General 10g34.2.2 Technical KPIs 11g34.2.3 Objective KPIs 12g34.2.3.1 General 12g34.2.3.2 Energy consumption within ETSI EN 305 200 series . 12g34.2.3.3 Task effectiveness within
11、ETSI EN 305 200 series 12g34.2.3.4 Energy re-use within ETSI EN 305 200 series 13g34.2.3.5 Renewable energy within ETSI EN 305 200 series 13g34.2.4 Global KPIs 13g34.2.4.1 General 13g34.2.4.2 Global KPIs within ETSI EN 305 200 series 13g35 Requirements for Global and Objective KPIs 14g35.1 General .
12、 14g35.2 Scale . 14g35.3 Utilization and evolution 15g35.4 Definition of boundaries . 15g35.5 Formulae. 15g35.5.1 General 15g35.5.2 Definition of terms 15g35.5.3 Clarity . 15g35.5.4 Criteria 15g35.6 Measurement points and procedures 15g35.6.1 Overview 15g35.6.2 Detailed treatment . 16g35.7 Classific
13、ations 17g35.8 Reporting 17g36 The use of KPIs 17g3History 19g3ETSI ETSI EN 305 200-1 V1.1.1 (2018-07) 4List of figures Figure 1: The relationship of energy related Technical, Objective and Global KPIs 11g3Figure 2: Schematic of the foundations of any Global KPI for energy management 14g3Figure 3: S
14、chematic of combinations of Objective KPIs within a Global KPI for energy management .14g3Figure 4: Schematic showing application of TKPI, TREPEATand t 16g3Figure 5: Mathematical treatment of assessment timing .17g3ETSI ETSI EN 305 200-1 V1.1.1 (2018-07) 5Intellectual Property Rights Essential paten
15、ts IPRs essential or potentially essential to normative deliverables may have been declared to ETSI. The information pertaining to these essential IPRs, if any, is publicly available for ETSI members and non-members, and can be found in ETSI SR 000 314: “Intellectual Property Rights (IPRs); Essentia
16、l, or potentially Essential, IPRs notified to ETSI in respect of ETSI standards“, which is available from the ETSI Secretariat. Latest updates are available on the ETSI Web server (https:/ipr.etsi.org/). Pursuant to the ETSI IPR Policy, no investigation, including IPR searches, has been carried out
17、by ETSI. No guarantee can be given as to the existence of other IPRs not referenced in ETSI SR 000 314 (or the updates on the ETSI Web server) which are, or may be, or may become, essential to the present document. Trademarks The present document may include trademarks and/or tradenames which are as
18、serted and/or registered by their owners. ETSI claims no ownership of these except for any which are indicated as being the property of ETSI, and conveys no right to use or reproduce any trademark and/or tradename. Mention of those trademarks in the present document does not constitute an endorsemen
19、t by ETSI of products, services or organizations associated with those trademarks. Foreword This European Standard (EN) has been produced by ETSI Technical Committee Access, Terminals, Transmission and Multiplexing (ATTM). The present document is part 1 of a multi-part deliverable covering Global Ke
20、y Performance Indicators for energy management of operational broadband deployment infrastructures, as identified below: Part 1: “General requirements“; Part 2: “Specific requirements“; Part 3: “ICT Sites“; Part 4: “Design assessments“. National transposition dates Date of adoption of this EN: 4 Jul
21、y 2018 Date of latest announcement of this EN (doa): 31 October 2018 Date of latest publication of new National Standard or endorsement of this EN (dop/e): 30 April 2019 Date of withdrawal of any conflicting National Standard (dow): 30 April 2019 ETSI ETSI EN 305 200-1 V1.1.1 (2018-07) 6Modal verbs
22、terminology In the present document “shall“, “shall not“, “should“, “should not“, “may“, “need not“, “will“, “will not“, “can“ and “cannot“ are to be interpreted as described in clause 3.2 of the ETSI Drafting Rules (Verbal forms for the expression of provisions). “must“ and “must not“ are NOT allow
23、ed in ETSI deliverables except when used in direct citation. Introduction Energy costs continue to rise, a trend that will continue in the future, while broadband penetration is introducing new active equipment to the network architecture. In this context, and to reflect other environmental aspects
24、of sustainability, it is vital that the main telecommunication operators implement effective general engineering of fixed and mobile broadband networks and sites provisioning, managing or using those networks (i.e. ICT sites) in order to respond to critical issues of energy consumption while proposi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ETSIEN30520012018ACCESSTERMINALSTRANSMISSIONANDMULTIPLEXINGATTMENERGYMANAGEMENTOPERATIONALINFRASTRUCTURESGLOBALKPISPART1GENERALREQUIREMENTSV111PDF

链接地址:http://www.mydoc123.com/p-730598.html