DOT 49 CFR PART 193-2010 LIQUEFIED NATURAL GAS FACILITIES FEDERAL SAFETY STANDARDS.pdf
《DOT 49 CFR PART 193-2010 LIQUEFIED NATURAL GAS FACILITIES FEDERAL SAFETY STANDARDS.pdf》由会员分享,可在线阅读,更多相关《DOT 49 CFR PART 193-2010 LIQUEFIED NATURAL GAS FACILITIES FEDERAL SAFETY STANDARDS.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、147 Pipeline and Hazardous Materials Safety Administration, DOT Pt. 193 Amdt. 19295, 69 FR 18234, Apr. 6, 2004, as amended by Amdt. 19295, May 26, 2004 PART 193LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Subpart AGeneral Sec. 193.2001 Scope of part. 193.2003 Reserved 193.2005 Applicab
2、ility. 193.2007 Definitions. 193.2009 Rules of regulatory construction. 193.2011 Reporting. 193.2013 Incorporation by reference. 193.2015 Reserved 193.2017 Plans and procedures. 193.2019 Mobile and temporary LNG facili-ties. Subpart BSiting Requirements 193.2051 Scope. 193.2055 Reserved 193.2057 The
3、rmal radiation protection. 193.2059 Flammable vapor-gas dispersion protection. 193.2061193.2065 Reserved 193.2067 Wind forces. 193.2069193.2073 Reserved Subpart CDesign 193.2101 Scope. MATERIALS 193.2103193.2117 Reserved 193.2119 Records. DESIGN OF COMPONENTS AND BUILDINGS 193.2121193.2153 Reserved
4、IMPOUNDMENT DESIGN AND CAPACITY 193.2155 Structural requirements. 193.2157193.2159 Reserved 193.2161 Dikes, general. 193.2163193.2165 Reserved 193.2167 Covered systems. 193.2169193.2171 Reserved 193.2173 Water removal. 193.2175193.2179 Reserved 193.2181 Impoundment capacity: LNG stor-age tanks. 193.
5、2183193.2185 Reserved LNG STORAGE TANKS 193.2187 Nonmetallic membrane liner. 193.2189193.2233 Reserved Subpart DConstruction 193.2301 Scope. 193.2303 Construction acceptance. 193.2304 Corrosion control overview. 193.2305193.2319 Reserved 193.2321 Nondestructive tests. 193.2323193.2329 Reserved Subpa
6、rt EEquipment 193.2401 Scope. VAPORIZATION EQUIPMENT 193.2403193.2439 Reserved 193.2441 Control center. 193.2443 Reserved 193.2445 Sources of power. Subpart FOperations 193.2501 Scope. 193.2503 Operating procedures. 193.2505 Cooldown. 193.2507 Monitoring operations. 193.2509 Emergency procedures. 19
7、3.2511 Personnel safety. 193.2513 Transfer procedures. 193.2515 Investigations of failures. 193.2517 Purging. 193.2519 Communication systems. 193.2521 Operating records. Subpart GMaintenance 193.2601 Scope. 193.2603 General. 193.2605 Maintenance procedures. 193.2607 Foreign material. 193.2609 Suppor
8、t systems. 193.2611 Fire protection. 193.2613 Auxiliary power sources. 193.2615 Isolating and purging. 193.2617 Repairs. 193.2619 Control systems. 193.2621 Testing transfer hoses. 193.2623 Inspecting LNG storage tanks. 193.2625 Corrosion protection. 193.2627 Atmospheric corrosion control. 193.2629 E
9、xternal corrosion control: buried or submerged components. 193.2631 Internal corrosion control. 193.2633 Interference currents. 193.2635 Monitoring corrosion control. 193.2637 Remedial measures. 193.2639 Maintenance records. Subpart HPersonnel Qualifications and Training 193.2701 Scope. 193.2703 Des
10、ign and fabrication. 193.2705 Construction, installation, inspec-tion, and testing. 193.2707 Operations and maintenance. 193.2709 Security. 193.2711 Personnel health. 193.2713 Training: operations and mainte-nance. 193.2715 Training: security. 193.2717 Training: fire protection. 193.2719 Training: r
11、ecords. VerDate Mar2010 11:22 Dec 13, 2010 Jkt 220214 PO 00000 Frm 00157 Fmt 8010 Sfmt 8010 Y:SGML220214.XXX 220214wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-148 49 CFR Ch. I (10110 Edition) 193.2001 Subpart IFi
12、re Protection 193.2801 Fire protection. 193.2803193.2821 Reserved Subpart JSecurity 193.2901 Scope. 193.2903 Security procedures. 193.2905 Protective enclosures. 193.2907 Protective enclosure construction. 193.2909 Security communications. 193.2911 Security lighting. 193.2913 Security monitoring. 19
13、3.2915 Alternative power sources. 193.2917 Warning signs. AUTHORITY: 49 U.S.C. 5103, 60102, 60103, 60104, 60108, 60109, 60110, 60113, 60118; and 49 CFR 1.53. SOURCE: 45 FR 9203, Feb. 11, 1980, unless otherwise noted. EDITORIAL NOTE: Nomenclature changes to part 193 appear at 71 FR 33408, June 9, 200
14、6. Subpart AGeneral 193.2001 Scope of part. (a) This part prescribes safety stand-ards for LNG facilities used in the transportation of gas by pipeline that is subject to the pipeline safety laws (49 U.S.C. 60101 et seq.) and Part 192 of this chapter. (b) This part does not apply to: (1) LNG facilit
15、ies used by ultimate consumers of LNG or natural gas. (2) LNG facilities used in the course of natural gas treatment or hydro-carbon extraction which do not store LNG. (3) In the case of a marine cargo transfer system and associated facili-ties, any matter other than siting per-taining to the system
16、 or facilities be-tween the marine vessel and the last manifold (or in the absence of a mani-fold, the last valve) located imme-diately before a storage tank. (4) Any LNG facility located in navi-gable waters (as defined in Section 3(8) of the Federal Power Act (16 U.S.C. 796(8). 45 FR 9203, Feb. 11
17、, 1980, as amended by Amdt. 1931, 45 FR 57418, Aug. 28, 1980; Amdt. 19310, 61 FR 18517, Apr. 26, 1996 193.2003 Reserved 193.2005 Applicability. (a) Regulations in this part gov-erning siting, design, installation, or construction of LNG facilities (includ-ing material incorporated by reference in th
18、ese regulations) do not apply to LNG facilities in existence or under construction when the regulations go into effect. (b) If an existing LNG facility (or fa-cility under construction before March 31, 2000 is replaced, relocated or signifi-cantly altered after March 31, 2000, the facility must comp
19、ly with the applica-ble requirements of this part gov-erning, siting, design, installation, and construction, except that: (1) The siting requirements apply only to LNG storage tanks that are sig-nificantly altered by increasing the original storage capacity or relocated, and (2) To the extent compl
20、iance with the design, installation, and construction requirements would make the replaced, relocated, or altered facility incompat-ible with the other facilities or would otherwise be impractical, the replaced, relocated, or significantly altered facil-ity may be designed, installed, or con-structe
21、d in accordance with the origi-nal specifications for the facility, or in another manner subject to the ap-proval of the Administrator. Amdt. 19317, 65 FR 10958, Mar. 1, 2000, as amended by Amdt. 19318, 69 FR 11336, Mar. 10, 2004 193.2007 Definitions. As used in this part: Administrator means the Ad
22、minis-trator, Pipeline and Hazardous Mate-rials Safety Administration or his or her delegate. Ambient vaporizer means a vaporizer which derives heat from naturally oc-curring heat sources, such as the at-mosphere, sea water, surface waters, or geothermal waters. Cargo transfer system means a compo-n
23、ent, or system of components func-tioning as a unit, used exclusively for transferring hazardous fluids in bulk between a tank car, tank truck, or ma-rine vessel and a storage tank. Component means any part, or system of parts functioning as a unit, includ-ing, but not limited to, piping, proc-essin
24、g equipment, containers, control devices, impounding systems, lighting, security devices, fire control equip-ment, and communication equipment, VerDate Mar2010 11:22 Dec 13, 2010 Jkt 220214 PO 00000 Frm 00158 Fmt 8010 Sfmt 8010 Y:SGML220214.XXX 220214wwoods2 on DSK1DXX6B1PROD with CFRProvided by IHS
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DOT49CFRPART1932010LIQUEFIEDNATURALGASFACILITIESFEDERALSAFETYSTANDARDSPDF

链接地址:http://www.mydoc123.com/p-702060.html