DLA MIL-PRF-1 609 G-2009 ELECTRON TUBE GAS SWITCHING TYPE 1B24A.pdf
《DLA MIL-PRF-1 609 G-2009 ELECTRON TUBE GAS SWITCHING TYPE 1B24A.pdf》由会员分享,可在线阅读,更多相关《DLA MIL-PRF-1 609 G-2009 ELECTRON TUBE GAS SWITCHING TYPE 1B24A.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、 INCH-POUND MIL-PRF-1/609G 30 September 2009SUPERSEDING MIL-PRF-1/609F 31 March 1999 PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, GAS SWITCHING TYPE 1B24A This specification is approved for use by all Departments and Agencies of the Department of Defense. The requirements for acquiring the electro
2、n tube described herein shall consist of this document and the latest issue of MIL-PRF-1. DESCRIPTION: TR, tunable, internal cavity, incident power 30 kw, frequency range 8,490 to 9,600 MHz. ABSOLUTE RATINGS: Parameter: Incident power Ii Ebb Alt Unit: kw A dc V dc ft Maximum: 30 200 -1,000 10,000 Mi
3、nimum: - - - 100 -750 - - - PHYSICAL CHARACTERISTICS: Dimensions: See figure 1. TEST CONDITIONS: Parameter: Incident power Ii tp prr Ebb Ri Frequency Unit: kw A dc s pps V dc Meg F MHz Test condition 1: 10 100 0.5 1,000 - - - - - - F1 8,490 0.1% Test condition 2: 30 - - - 1.0 1,000 -800 2.3 F2 8,600
4、 0.1% F3 9,000 0.1% F4 9,375 0.1% F5 9,375 0.2% F6 9,375 0.5% F7 9,500 0.1% F8 9,600 0.1% GENERAL: Qualification - Required. AMSC N/A FSC 5960 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/609G 2 TABLE I. Testing and inspection. Requireme
5、nt or test Method MIL-STD-1311 Notes Test Conditions Symbol Limits Min Limits Max Units Qualification Insertion loss (integral cavity) Loaded Q Temperature coefficient of frequency 4416 4461 4466 2 2 3 - - - - - - - - - F = F2 to F7 F = F2 to F7 F = F4 Li QL F - - - 160 - - - 2.0 350 -20 dB - - - MH
6、z Conformance inspection, part 1 Ignitor ignition time Ignitor voltage drop Insertion loss (integral cavity) Ignitor interaction (insertion loss) Tuning range Flat leakage power Temperature cycling (nonoperating) 4401 4406 4416 4421 4426 4452 1027 1 - - - - - - - - - - - - - - - - - - - - - - - - -
7、- - - - - - - - - - - - - - 1 - - - Ebb = -800 V dc; Ri = 2.3 Meg 1 percent Ii = 100 A dc F = F1 Ii = 100 A dc 5 turns F = F6; T = 25C 5C t Eid Li Li F pf - - - - - - 325 - - - - - - 8,490 - - - - - - 5.0 450 2.0 0.2 9,600 30 - - - sec V dc dB dB MHz mw - - - Conformance inspection, part 2 Dielectri
8、c material strain Degradation due to vibration Ignitor oscillation Insertion loss (integral cavity) Loaded Q Recovery time Vibration detuning 4101 4021 4411 4416 4461 4471 4016 - - - - - - - - - - - - - - - - - - 4 - - - - - - - - - - - - - - - 1 - - - F = F3, F4 and F8 F = F1 and F8 F = F4 2G; F =
9、F4; t = 12 hours - - - - - - Ii Li QL t F - - - - - - - - - - - - 160 - - - - - - - - - - - - 60 2.0 350 4.0 3 - - - - - - A dc dB - - - s MHz See footnotes at end of table. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/609G 3 TABLE I. Te
10、sting and inspection -Continued. Requirement or test Method MIL-STD-1311 Notes Test Conditions Symbol Limits Min Limits Max Units Conformance inspection, part 3 Life test Life-test end points: Flat leakage power Insertion loss (integral cavity) Ignitor interaction (insertion loss) Ignitor voltage dr
11、op Degradation due to vibration Recovery time Temperature cycling life test - - - - - - 4452 4416 4421 4406 4021 4471 1027 5 6 - - - - - - - - - - - - - - - - - - - - - 2 - - - 1 - - - - - - - - - - - - 1 - - - Group B; F = F5 F = F6; T = 25 5 C F = F4 Ii = 100 A dc Ii = 100 A dc F = F4 Group B t -
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DLAMILPRF1609G2009ELECTRONTUBEGASSWITCHINGTYPE1B24APDF

链接地址:http://www.mydoc123.com/p-692081.html