DLA MIL-PRF-1 1718 A (1)-2008 ELECTRON TUBE GAS SWITCHING TYPE 8922《气体开关型8922电子管》.pdf
《DLA MIL-PRF-1 1718 A (1)-2008 ELECTRON TUBE GAS SWITCHING TYPE 8922《气体开关型8922电子管》.pdf》由会员分享,可在线阅读,更多相关《DLA MIL-PRF-1 1718 A (1)-2008 ELECTRON TUBE GAS SWITCHING TYPE 8922《气体开关型8922电子管》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-PRF-1/1718A w/AMENDMENT 1 16 April 2008 SUPERSEDING MIL-PRF-1/1718A 25 September 1998 PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, GAS SWITCHING TYPE 8922 * This specification is approved for use by all Depart- ments and Agencies of the Department of Defense. Requirements for acquiring the el
2、ectron tube described herein shall consist of this document and MIL-PRF-1. DESCRIPTION: Passive TR-limiter, crystal protector, igniter-less, 2,600 to 3,100 MHz. ABSOLUTE RATINGS: Incident Temperature Parameter: power Du tp Pressurization Operating Non-operating Altitude Unit: kw - s psia C C ft Maxi
3、mum: 50 0.03 36 40 +65 +75 30,000 Minimum: 0 - - - 0 -62 - PHYSICAL CHARACTERISTICS: Dimensions: See figure 1. Mounting: Input and output flanges mate with Mounting position: Any. M3922/61-1. Cooling: Convection. Flanges: See note 1 of figure 1. Finish: See note 2 of figure 1. TEST CONDITIONS: Param
4、eter: Incident power Du tp F Frequency Unit: kw - s MHz F MHz Tolerance: 10% min 0.10 3% 1 2,600 0.1%30 0.001 6.0 F3 2 2,900 0.1%3 3,000 0.1% 4 3,100 0.1%_ GENERAL: First article testing: Required. 1/ Service life guarantee: 2/ 3/ Shelf life: 3/ _ * Replaces type GIB 182858-1 and Varian VT-8-1003. A
5、MSC N/A FSC 5960 INCH-POUND Inactive for new design after 3 September 2003 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/1718A w/AMENDMENT 1 2 TABLE I. Testing and inspection. Inspection MIL-STD-1311 Notes Conditions Symbol Limits Unit me
6、thod Min Max Conformance inspection, part 1 Low-level VSWR 4473 4/ - F = F2 through F4 - 1.35 - Insertion loss 4416 - F = F2 through F4 Li - 0.5 dB Flat-leakage power 4452 - pf - 60 mw Spike-leakage energy 4452 - Ws - 0.15 erg Recovery time 4471 - t - 20 s Firing power 4496 - Po/Du - 200 mw Temperat
7、ure cycling (non-operating) 1027 5/ One cycle - - - - Conformance inspection, part 2 Pressurizing 4003 5/ 8/ 40 psia; 1 cycle - - - - Dielectric material strain 4101 7/ - - - - Permanence of marking 1105 - - - - - Conformance inspection, part 3 Life test - 2/ 3/ Group S t 2,000 - hrs Life-test end p
8、oints: - Crystal degradation - 9/ 10/ NF - 2.0 dB Insertion loss 4416 - F = F2 through F4 Li - 0.5 dB Spike-leakage energy 4452 - Ws - 0.3 erg Recovery time 4471 - t - 30 s Firing power 4496 - Po/Du - 600 mw Noise ratio - 6/ Nr - 1.05 - See footnotes at end of table. Provided by IHSNot for ResaleNo
9、reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/1718A w/AMENDMENT 1 3 TABLE I. Testing and inspection - Continued. Inspection MIL-STD- 1311 Notes Conditions Symbol Limits Unit method Min Max Conformance inspection, part 3 - Continued Periodic-check tests Pressurizing 4003
10、 5/ 8/ 40 psia; 10 cycles - - - - Shock, specified pulse 1042 11/ Test condition A - - - - Vibration, mechanical 1032 12/ - - - - Temperature cycling life test 1027 5/ 40 psia; 10 cycles - - - - Humidity - 13/ - - - - Performance degradation - 14/ - - - - 1/ First article testing requirements hereby
11、 replace any qualification requirements referable to the product covered herein. The term “First article testing” shall be considered as synonymous with the term “Preproduction sample approval testing.” All tests applicable herein (including all first article tests and conformance inspection, parts
12、1, 2, and 3) shall be performed during first article testing. A failure of any one tube in any of the tests shall be cause for decision of first article sample disapproval. The contractor/manufacturer shall provide test reports and written assurance that: a. The first article sample is representativ
13、e of the product to be submitted under the contract. b. First articles shall be manufactured from new materials and in the facility that produced the sample tubes. A test plan shall be submitted to the contracting officer for approval prior to proceeding with first article testing. The test plan sha
14、ll list all production test and laboratory test facilities to be utilized in first article testing and production phases of the contract. Upon receipt of approval of the test plan, first article testing may proceed. When testing has been completed, three copies of the test report shall be prepared i
15、n accordance with guidance from MIL-HDBK-831, certified by a Government representative and submitted with the test samples to the contracting officer for approval. 2/ Life tests shall not be required after the tubes under test (TUT) have satisfied all requirements of this document for first article
16、approval. However, a service-life guarantee of 2,000 hours minimum shall be required in accordance with the requirements of MIL-PRF-1. Life for purpose of the service-life guarantee shall be defined as the total rf operating time. The sum of the operating and shelf life shall be not less than 21 mon
17、ths. 3/ The tubes tested and acquired in accordance with this tube specification sheet shall be capable of shelf-life for a period of 18 months after date of shipment from the manufacturers plant. Tubes placed in operation during this shelf-life period shall meet all requirements of this tube specif
18、ication sheet. Tubes found to be defective within the shelf-life period shall be replaced by the manufacturer at no cost to the Government or its contractors. 4/ Unless otherwise specified, the acceptance level for all tests listed under conformance inspection, part 1, shall be 1.0 (see 15/). 5/ Aft
19、er the completion of this test, the TUT shall satisfy all requirements of MIL-STD-1311, method 4452 (spike-leakage energy), as specified in conformance inspection, part 1. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-PRF-1/1718A w/AMENDMENT 1
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DLAMILPRF11718A12008ELECTRONTUBEGASSWITCHINGTYPE8922 气体 开关 8922 电子管 PDF

链接地址:http://www.mydoc123.com/p-692031.html