DLA MIL-PRF-1 1709B-1999 ELECTRON TUBE GAS SWITCHING TYPE 8919.pdf
《DLA MIL-PRF-1 1709B-1999 ELECTRON TUBE GAS SWITCHING TYPE 8919.pdf》由会员分享,可在线阅读,更多相关《DLA MIL-PRF-1 1709B-1999 ELECTRON TUBE GAS SWITCHING TYPE 8919.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、I INCH-POUND I MIL-PRF-I/1709B 2 Auqust 1999 SUPERSEDING 26 June 1985 MI L-E-1 /I 709A Parameter: Unit: Maxim um : Minimum: PERFORMANCE SPECIFICATION SHEET ELECTRON TUBE, GAS SWITCHING TYPE8919 * This specification is approved for use by all Depart- ments and Agencies of the Department of Defense. T
2、he requirements for acquiring the electron tube described herein shall consist of this document and the latest issue of MIL-PRF-I. Incident power Du tP TA Altitude kw _ P OC feet 300 0.001 1.15 71 10,000 _ 10 _ _ 4 DESCRIPTION: Passive TR-limiter, bandpass, frequency range 5,395 to 5,905 MHz Paramet
3、er: Unit: Tolerance: Incident tP Prr F power fi 0% fO.10 _ kw P PPS MHz f5% PHYSICAL CHARACTERISTICS: See figure I. Mounting: Mates with UG-406B/U choke flange or equivalent Weight: 2 pounds (approximate). Test condition 1 : Test condition 2: Test condition 3: TEST CONDITIONS: 40 1 .o 1,000 F3 70 1
4、.o 1,000 F3 300 1 .o 1,000 F3 GENERAL: Qualification - Required. * See z/ at end of table I. AMSC N/A 1 Of5 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. It7-pq-j Fre uenc FSC 5960 Provided by IHSNot for ResaleNo reproduction or networking permitted without licens
5、e from IHS-,-,-Inspection Conformance inspection, partl Low level VSWR Insertion loss Flat leakage power, peak (max) Flat leakage power Spike leakage energy Position of short Arc loss Tem perat u re cycling (nonoperating) Conformance inspection. Group C Symbol o o o o o Li Pb Pf ws Distance Loss _ _
6、. t t t t Pf ws Li _ lits Max 1.9 1.4 1.4 1.4 1.9 0.5 1 O0 50 0.10 f0.015 0.80 _ _ 5 _ _ 10 70 0.1 0.8 _ 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-TABLE I. Testinci and inspection - Continued - I/ Unless otherwise specified, the acceptance le
7、vel for all tests listed under conformance inspection, pari 1, shall be 1 .O, in accordance with the accept on zero defect (c = O) sampling plans, Table 111 of MIL-PRF-I. - 2/ A swept-frequency method may be used for this test - 3/ The maximum peak flat leakage shall not exceed the specified limit w
8、hen tested from zero to 4 kw peak power. - 4/ The position of shod shall be 0.085 inch (2.16 mm) further from the magnetron within the limits specified - 5/ The input flange only of the tube under test (TUT) shall be immersed in water during this test. - 6/ At the conclusion of this test, the TUT sh
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DLAMILPRF11709B1999ELECTRONTUBEGASSWITCHINGTYPE8919PDF

链接地址:http://www.mydoc123.com/p-692026.html