BS ISO 16778-2015 Water quality - Calanoid copepod early-life stage test with Acartia tonsa《水质 利用汤氏纺锤水蚤的镖水蚤桡足动物幼年阶段试验》.pdf
《BS ISO 16778-2015 Water quality - Calanoid copepod early-life stage test with Acartia tonsa《水质 利用汤氏纺锤水蚤的镖水蚤桡足动物幼年阶段试验》.pdf》由会员分享,可在线阅读,更多相关《BS ISO 16778-2015 Water quality - Calanoid copepod early-life stage test with Acartia tonsa《水质 利用汤氏纺锤水蚤的镖水蚤桡足动物幼年阶段试验》.pdf(48页珍藏版)》请在麦多课文档分享上搜索。
1、BSI Standards PublicationBS ISO 16778:2015W a t e r q u a l i t y C a l a n o i d copepod early-life stage test with Acartia tonsaBS ISO 16778:2015 BRITISH STANDARDNational forewordThis British Standard is the UK implementation of ISO 16778:2015. The UK participation in its preparation was entrusted
2、 to TechnicalCommittee EH/3/5, Biological Methods.A list of organizations represented on this committee can be obtained on request to its secretary.This publication does not purport to include all the necessary provisions of a contract. Users are responsible for its correct application. The British
3、Standards Institution 2015.Published by BSI Standards Limited 2015ISBN 978 0 580 74917 9 ICS 13.060.70 Compliance with a British Standard cannot confer immunity from legal obligations.This British Standard was published under the authority of the Standards Policy and Strategy Committee on 30 June 20
4、15.Amendments/corrigenda issued since publicationDate T e x t a f f e c t e d ISO 2015Water quality Calanoid copepod early-life stage test with Acartia tonsaQualit de leau Essai aux premiers stades de la vie de coppodes calanodes avec Acartia tonsiaINTERNATIONAL STANDARDISO 16778First edition 2015-0
5、6-15Reference number ISO 16778:2015(E)BS ISO 16778:2015ISO 16778:2015(E)ii ISO 2015 All rights reservedCOPYRIGHT PROTECTED DOCUMENT ISO 2015, Published in SwitzerlandAll rights reserved. Unless otherwise specified, no part of this publication may be reproduced or utilized otherwise in any form or by
6、 any means, electronic or mechanical, including photocopying, or posting on the internet or an intranet, without prior written permission. Permission can be requested from either ISO at the address below or ISOs member body in the country of the requester.ISO copyright officeCh. de Blandonnet 8 CP 4
7、01CH-1214 Vernier, Geneva, SwitzerlandTel. +41 22 749 01 11Fax +41 22 749 09 47copyrightiso.orgwww.iso.orgBS ISO 16778:2015ISO 16778:2015(E)Foreword v1 Scope . 12 Normative references 13 Terms and definitions . 14 Principle 25 Apparatus . 26 Reagents 36.1 Water . 36.2 Culture and test media . 36.3 D
8、ilution water 37 Test organism . 38 Procedure. 48.1 Preparation of culture medium 48.2 Choice of test concentrations . 48.3 Preparation of test substance stock solution 48.4 Preparation of test solutions . 58.5 Incubation/Exposure 58.5.1 Test organisms and loading 58.5.2 Control of hatching . 58.5.3
9、 Larval development ratio (Early-life stages development). 68.5.4 Duration. 68.5.5 Handling of test vessels 68.5.6 Feeding . 68.5.7 Light and temperature 68.5.8 Aeration . 68.5.9 Dilution water and test solutions renewal or addition . 68.6 Measurements/Observations . 78.6.1 Concentration of the test
10、 substance 78.6.2 Physical-chemical parameters oxygen, pH, salinity, and temperature 89 Validity criteria 810 Expression of results 811 Denotion of results . 912 Interpretation of results . 913 Reference substance . 914 Test report . 9Annex A (informative) Defined culture and test media .11Annex B (
11、informative) Specific details on renewal of test solution, feeding regime, and an example of a flow diagram for a larval development test (early-life stage test) with Acartia tonsa 13Annex C (informative) Sampling for chemical analyses 17Annex D (informative) Lugols solution 18Annex E (informative)
12、Data collection sheet for Acartia tonsa early-life stage test .19Annex F (informative) Calculations 21Annex G (informative) Culturing of Acartia tonsa 23 ISO 2015 All rights reserved iiiContents PageBS ISO 16778:2015ISO 16778:2015(E)Annex H (informative) Specific details on secondary sexual characte
13、ristics for Acartia tonsa .28Annex I (informative) General safety precautions and techniques for handling environmental samples 30Bibliography .36iv ISO 2015 All rights reservedBS ISO 16778:2015ISO 16778:2015(E)ForewordISO (the International Organization for Standardization) is a worldwide federatio
14、n of national standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Each member body interested in a subject for which a technical committee has been established has the right to be represented on that committee.
15、 International organizations, governmental and non-governmental, in liaison with ISO, also take part in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization.The procedures used to develop this document and thos
16、e intended for its further maintenance are described in the ISO/IEC Directives, Part 1. In particular the different approval criteria needed for the different types of ISO documents should be noted. This document was drafted in accordance with the editorial rules of the ISO/IEC Directives, Part 2 (s
17、ee www.iso.org/directives). Attention is drawn to the possibility that some of the elements of this document may be the subject of patent rights. ISO shall not be held responsible for identifying any or all such patent rights. Details of any patent rights identified during the development of the doc
18、ument will be in the Introduction and/or on the ISO list of patent declarations received (see www.iso.org/patents). Any trade name used in this document is information given for the convenience of users and does not constitute an endorsement.For an explanation on the meaning of ISO specific terms an
19、d expressions related to conformity assessment, as well as information about ISOs adherence to the WTO principles in the Technical Barriers to Trade (TBT) see the following URL: Foreword - Supplementary informationThe committee responsible for this document is ISO/TC 147, Water quality, Subcommittee
20、 SC 5, Biological methods. ISO 2015 All rights reserved vBS ISO 16778:2015ISO 16778:2015(E)BS ISO 16778:2015Water quality Calanoid copepod early-life stage test with Acartia tonsaWARNING Persons using this document should be familiar with normal laboratory practice. This International Standard does
21、not purport to address all of the safety problems, if any, associated with its use. It is the responsibility of the user to establish appropriate safety and health practices and to ensure compliance with any national regulatory conditions.IMPORTANT It is absolutely essential that tests conducted in
22、accordance with this document be carried out by suitably qualified staff.1 ScopeThis International Standard specifies an early-life stage test procedure for determination of the toxic effects of a chemical substance, effluent, or water sample on a cold-water marine and brackish water copepod species
23、 under semi-static conditions. The biological endpoints include survival and development of the early-life stages. The exposure starts with eggs and is continued until emergence of juvenile stages.Copepods occur widely in marine, brackish, and fresh water ecosystems. They represent important prey it
24、ems for the larvae of many fish and larger invertebrates and are increasingly used as a live food source in aquaculture. They feed on phytoplankton and, thus, are an ecologically important energy-transfer link between primary producers and higher trophic levels.2 Normative referencesThere are no nor
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BSISO167782015WATERQUALITYCALANOIDCOPEPODEARLYLIFESTAGETESTWITHACARTIATONSA 水质 利用 纺锤 水蚤 动物 幼年 阶段 试验 PDF

链接地址:http://www.mydoc123.com/p-585155.html