BS 4856-1-1972 Methods for testing and rating fan coil units unit heaters and unit coolers - Thermal and volumetric performance for heating duties without additional ducting《风机盘管供暖.pdf
《BS 4856-1-1972 Methods for testing and rating fan coil units unit heaters and unit coolers - Thermal and volumetric performance for heating duties without additional ducting《风机盘管供暖.pdf》由会员分享,可在线阅读,更多相关《BS 4856-1-1972 Methods for testing and rating fan coil units unit heaters and unit coolers - Thermal and volumetric performance for heating duties without additional ducting《风机盘管供暖.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、BRITISH STANDARD BS4856-1: 1972 Methods for Testing and rating fan coil units, unit heaters and unit coolers Part1: Thermal and volumetric performance for heating duties; without additional ducting UDC 697.356.001.42+697.971.001.42BS4856-1:1972 This British Standard, having been approved by the Refr
2、igeration, Heating and AirConditioning Industry Standards Committee, was published under the authority of the Executive Board on 13October1972 BSI 08-1999 The following BSI references relate to the work on this standard: Committee reference RHE/6 Draft for comment70/37568 ISBN 0 580 07323 8 Co-opera
3、ting organizations The Refrigeration, Heating and Air Conditioning Industry Standards Committee, under whose supervision this British Standard was prepared, consists of representatives from the following Government departments and scientific and industrial organizations: Association of Consulting En
4、gineers* Association of Manufacturers of Domestic Electrical Appliances Boiler and Radiator Manufacturers Association* British Mechanical Engineering Confederation British Oil and Gas Firing Equipment Manufacturers Association British Refrigeration and Air Conditioning Association* Department of Hea
5、lth and Social Security* Department of the Environment Electricity Council, The Central Electricity Generating Board and the Area Boards in England and Wales Engineering Equipment Users Association Gas Council Heating and Ventilating Contractors Association* Heating and Ventilating Research Associat
6、ion* HEVAC Association* Institute of Fuel Institute of Refrigeration* Institution of Electrical Engineers Institution of Gas Engineers Institution of Heating and Ventilating Engineers* Lloyds Register of Shipping Ministry of Defence, Navy Department* National Coal Board Royal Institute of British Ar
7、chitects Water-tube Boilermakers Association The Government departments and scientific and industrial organizations marked with an asterisk in the above list, together with the following, were directly represented on the committee entrusted with the preparation of this British Standard: Department o
8、f the Environment, Building Research Station Greater London Council Oil Appliances Manufacturers Association Steel Radiators absolute pressure,1.013bar 1) ; relative humidity,43%; density,1.200kg/m 3 3 Operating characteristics of units 3.1 The primary medium shall be any of the following fluids: Wa
9、ter Steam Heat transfer fluid (excluding primary refrigerants). 3.2 The operating conditions of the units shall lie within the following ranges: Water up to100 C Pressurized water from100 C to200 C Steam between atmospheric pressure and a gauge pressure of8bar 1) Heat transfer fluid up to100 C for a
10、tmospheric pressure and from100 C to200 C when pressurized. 3.3 The air volume flow rate of the unit shall lie within the range25 10 3m 3 /s to5m 3 /s. 3.4 There is no restriction on the mounting of these units, provided that they are tested while mounted in a way representative of their intended us
11、e. 3.5 The requirements of the methods for individual tests may be followed to determine the performance of a unit at one specified set of conditions; where the performance at conditions other than those of the actual test are to be stated, the full schedule of tests specified in the standard is to
12、be completed. 1) 1bar=10 5N/m 2 .BS4856-1:1972 2 BSI 08-1999 4 Nomenclature 5 Objects of the test method The object of the tests is to establish the performance of the unit over a specified range of primary and secondary fluid conditions and space temperatures. The test procedures set out in this st
13、andard are for the determination of: 1) the gross thermal output; 2) the primary fluid pressure drop; 3) the secondary flow rate, where required. 6 Testing conditions 6.1 Primary fluidliquid. The unit shall be tested at a minimum of three primary fluid inlet temperatures. The selected temperatures s
14、hall cover the range of duty over which the appliance is to be rated, that is, to within10% at either end of the range. Suitable inlet temperatures may be: For inlet temperature up to100 C: at50 C,70 C,90 C. For inlet temperature between100 C and200 C: at130 C,150 C,180 C. Symbol Quality Unit c p sp
15、ecific heat capacity kJ/kg C K w temperature correction factor L latent heat of evaporation kJ/kg M total mass flow of liquid kg M t net weight of condensate formed during test kg M n net weight of condensate formed during no load kg %p primary fluid pressure drop N/m 2 %p r primary fluid pressure d
16、rop at a reference temperature of80 C N/m 2 Q rate of heat emission kW Q a rate of heat emission based on true inlet air temperature kW Q m rate of heat emission based on room air temperature kW q r air volume flow rate at reference conditions m 3 /s q f primary fluid volume flow rate m 3 /s q fr pr
17、imary fluid volume flow rate at reference temperature of80 C m 3 /s r reference air density kg/m 3 m air density at test conditions kg/m 3 f primary fluid density at mean liquid temperature kg/m 3 fr primary fluid density at reference temperature of80 C kg/m 3 T t duration of test s T n duration of
18、no load test s t a entering air temperature C t i inlet liquid temperature C t o outlet liquid temperature C t R room air temperature C t 3 saturated steam temperature C w liquid mass flow rate kg/sBS4856-1:1972 BSI 08-1999 3 6.2 Primary fluidsteam. Gauge pressures for the tests shall be selected su
19、ch that temperature intervals are not greater than20 C, and that a minimum of three test points are obtained. The steam shall have a minimum of1.5 C superheat to ensure the absence of entrained moisture, and a maximum of3 C superheat. 6.3 Entering air conditions. The entering air temperature shall b
20、e within the range15 25 C. 6.4 Primary fluid flow rate. For duties quoted over a range of primary fluid flow rates, tests shall be carried out at a minimum of three primary fluid flow rates, spaced approximately equally over the required range and covering the range to within10% at either end. 6.5 E
21、lectrical supply conditions. The tests shall be carried out at the rated voltage and frequency of theunit. 7 Steady state conditions Tests shall be carried out under steady state conditions and these are considered to be established if during30min the measurements given in Table 1 do not vary by mor
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BS485611972METHODSFORTESTINGANDRATINGFANCOILUNITSUNITHEATERSANDUNITCOOLERSTHERMALANDVOLUMETRICPERFORMANCEFORHEATINGDUTIESWITHOUTADDITIONALDUCTING

链接地址:http://www.mydoc123.com/p-544707.html