ASTM F2647-2007 Standard Guide for Approved Methods of Installing a CVS (Central Vacuum System)《中央真空系统(CVS)经批准的安装方法用标准指南》.pdf
《ASTM F2647-2007 Standard Guide for Approved Methods of Installing a CVS (Central Vacuum System)《中央真空系统(CVS)经批准的安装方法用标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM F2647-2007 Standard Guide for Approved Methods of Installing a CVS (Central Vacuum System)《中央真空系统(CVS)经批准的安装方法用标准指南》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2647 07Standard Guide forApproved Methods of Installing a CVS (Central VacuumSystem)1This standard is issued under the fixed designation F 2647; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revisi
2、on. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide demonstrates proper methods for installing acentral-vacuum system.1.2 Appendix X1 contains additional sources of info
3、rmationthat may be helpful to the user of this guide.1.3 The values stated in inch-pound units are to be regardedas the standard. The values given in parentheses are forinformation only.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is th
4、eresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2E 814 Test Method for Fire Tests of Through-PenetrationFire StopsE 2174 Practice for O
5、n-Site Inspection of Installed FireStopsF 402 Practice for Safe Handling of Solvent Cements,Primers, and Cleaners Used for Joining Thermoplastic Pipeand FittingsF 412 Terminology Relating to Plastic Piping SystemsF 2158 Specification for Residential Central-Vacuum Tubeand Fittings3. Terminology3.1 D
6、efinitions:3.2 For definitions of terms used in this guide, see Termi-nology F 412.4. Significance and Use4.1 The suggestions of this guide are intended to provideproper installation materials and practices to be used during theinstallation of a central-vacuum system.5. Materials5.1 Plastic Material
7、sFor information on plastic materialsused for installing a CVS system, see Specification F 2158.1This guide is under the jurisdiction of ASTM Committee F11 on VacuumCleaners and is the direct responsibility of Subcommittee F11.30 on Durability-Reliability.Current edition approved Oct. 1, 2007. Publi
8、shed November 2007.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Ha
9、rbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.APPENDIXES(Nonmandatory Information)X1. STORAGEX1.1 Outside StoragePlastic tube should be stored on aflat surface or supported in a manner that will prevent saggingor bending. Do not store tube in direct sunlight for longperiod
10、s. To prevent damage, tubing and fittings should not bestored where the temperature exceeds 130F (54C).X1.2 Inventories of plastic tube should be used on a first-in, first-out basis.X2. JOINTS AND CONNECTIONSX2.1 PVC tubing and fittings shall be joined by thesolvent-cement method.X2.2 Metal tubing a
11、nd fittings shall be joined according toAppendix X4.X3. SOLVENT CEMENT JOINTSX3.1 Tube CuttingCut the tube square with the axis,using a fine-tooth handsaw and a miter box.Arotary cutter maybe used if the cutting blades are specifically designed forcutting plastic tube in such a way as not to raise a
12、 burr or ridge(flare) at the cut end (see Fig. X3.1). Remove all burrs with adeburring tool, knife, file, or abrasive paper.X3.2 Dry Fit TestThe solvent cement joint is designed sothat there will generally be interference of the tube wall withthe fitting socket before the tube is fully inserted. Ins
13、ert thetube into the fitting and check that the interference occurs about13 to23 of the socket depth (Fig. X3.2).X3.3 CleaningSurfaces to be joined must be cleaned andbe free of dirt, moisture, oil, and other foreign material. If thiscannot be accomplished by wiping with a clean, dry cloth, achemica
14、l or mechanical cleaner must be used. If a chemicalcleaner is used, apply with an applicator. (WarningSkincontact with chemical cleaners should be avoided.)X3.4 Application Procedure:X3.4.1 Handling CementKeep the cement can closed andin a shady place when not actually in use. Discard the cementwhen
15、 an appreciable change in viscosity takes place or at thefirst sign of gelation. The cement should not be thinned. Keepthe applicator immersed in cement between applications. (SeePractice F 402 for proper handling procedures.)X3.4.2 Application of CementPVC solvent cement is fastdrying, and, therefo
16、re, the cement shall be applied as quickly aspossible, consistent with good workmanship (see Fig. X3.3).The surface temperature of the mating surfaces should notexceed 110F (43C) at the time of assembly.FIG. X3.1 Apparatus for Cutting TubeFIG. X3.2 Tube Entering Dry FittingF2647072X3.4.3 Apply cemen
17、t lightly but uniformly to the outside ofthe tubing, taking care to keep the use of cement to a minimum.(WarningApplication of cement to fitting socket is notrecommended and can cause drippings or an excess amount ofcement to be pushed to the inside diameter of the connectionthat can possibly snag d
18、ebris and eventually create a clog.)X3.4.4 Low-Temperature ApplicationsAt temperaturesbelow freezing, 32F (0C), solvents penetrate and soften thePVC surfaces more slowly than in warmer weather. For thisreason, it is recommended that testing be done on a piece ofscrap tube to determine if satisfactor
19、y penetration of thesurfaces can be achieved.X3.4.5 Assembly of JointImmediately after applying acoat of cement to the tube, forcibly insert the tube into thesocket. To distribute the cement evenly, turn the tube or fittinga14 turn during the process (see Fig. X3.4).X3.4.6 Assembly should be complet
20、ed within 20 s after theapplication of cement. (WarningUntil the cement is set inthe joint, the tube may back out of the fitting socket, if not heldin place for approximately 1 min after assembly. Care shouldbe taken during assembly not to disturb or apply any force tothe joints previously made, as
21、early rough handling can destroyfresh joints.)X4. METHODS OF JOINING METAL TUBING AND FITTINGSX4.1 Tube CuttingCut the tube square with the axis,using a metal cutting blade in a chop saw or band saw. A rotarycutter may be used if the cutting blades are specificallydesigned for cutting metal tube in
22、such a way as not to raise aburr or ridge (flare) at the cut end. Remove all burrs with adeburring tool, file or abrasive paper.X4.2 CleaningSurfaces to be joined must be cleaned andfree of dirt, moisture, oil and other foreign material. If thiscannot be accomplished by wiping with a clean, dry clot
23、h, achemical or mechanical cleaner must be used. If a chemicalcleaner is used, apply with an applicator. (WarningSkincontact with chemical cleaners should be avoided.)X4.3 Assembly of JointThere are three popular andrecommended methods of joining metal tubing and fittings foruse in low vacuum and pr
24、essure systems under 16 PSIG(Adhesive, Compression Couplings and Shrink Sleeves).All ofthese methods provide secure connections eliminating the needfor welding or brazing.X4.3.1 AdhesiveThe best proven adhesive to bond metaltubing and fittings together is industrial contact cement. Forbest results,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF26472007STANDARDGUIDEFORAPPROVEDMETHODSOFINSTALLINGACVSCENTRALVACUUMSYSTEM 中央 真空 系统 CVS 批准 安装 方法

链接地址:http://www.mydoc123.com/p-539175.html