ASTM F2454-2005 Standard Practice for Sealing Lateral Connections and lines from the mainline Sewer Systems by the Lateral Packer Method Using Chemical Grouting《用化学灌浆的侧向灌浆机法密封测量连接件.pdf
《ASTM F2454-2005 Standard Practice for Sealing Lateral Connections and lines from the mainline Sewer Systems by the Lateral Packer Method Using Chemical Grouting《用化学灌浆的侧向灌浆机法密封测量连接件.pdf》由会员分享,可在线阅读,更多相关《ASTM F2454-2005 Standard Practice for Sealing Lateral Connections and lines from the mainline Sewer Systems by the Lateral Packer Method Using Chemical Grouting《用化学灌浆的侧向灌浆机法密封测量连接件.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 2454 05Standard Practice forSealing Lateral Connections and lines from the mainlineSewer Systems by the Lateral Packer Method, UsingChemical Grouting1This standard is issued under the fixed designation F 2454; the number immediately following the designation indicates the year oforigi
2、nal adoption or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.INTRODUCTIONThe infiltration of water in sanitary sewer systems through the
3、 lateral service connection and the firstfew joints of the lateral below the groundwater table is a major problem for collection system owners.The combined length of the lateral services often exceeds the length of the mainline sewers. Often, thelateral services have been built with little or no sup
4、ervision and little or no above-ground access formonitoring and inspection.1. Scope1.1 This practice covers the procedures for testing andsealing sewer lateral connections and lateral lines from themainline sewer with appropriate chemical grouts using thelateral packer method. Chemical grouting is u
5、sed to stopinfiltration of ground water and exfiltration of sewage ingravity flow sewer systems that are structurally sound.1.2 This practice applies to mainline sewer diameters of 6 to24 in. with 4, 5, or 6 in. diameter laterals. Larger diameter pipeswith lateral connections and lines can be groute
6、d with specialpackers or man-entry methods. The mainline and lateral pipesmust be structurally adequate to create an effective seal.1.3 Worker safety training should include reviewing thebiohazards and gases from sewage, confined spaces, pumpingequipment, and related apparatus. Additional safety con
7、sider-ations including proper handling, mixing, and transporting ofchemical grouts should be provided by the chemical groutmanufacturer or supplier, or both. Their safe operating prac-tices and procedures should describe in detail appropriatepersonal protective equipment (PPE) for the various grouti
8、ngoperations. Operations covered should include the properstorage, transportation, mixing, and disposal of chemicalgrouts, additives, and their associated containers.1.4 The values stated in inch/pound units are to be regardedas the standard. The values in parentheses are for informationonly.1.5 Thi
9、s standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and to determine theapplicability of regulatory limitations prior to use.2. Referenced Documen
10、ts2.1 ASTM Standards:2F 2304 Practice for Rehabilitation of Sewers Using Chemi-cal Grouting2.2 Other Documents:NASSCO Specification Guidelines, 2003, Wastewater Col-lection System Maintenance and Rehabilitation33. Significance and Use3.1 The inspection, testing, and repair of lateral connectionsfor
11、sanitary sewers are regular practice necessary for themaintenance and optimal performance of the system. It isimportant to identify methods that use the most currentcompounds and technology to ensure the reduction of infiltra-tion and exfiltration. It is important to minimize disruption totraffic an
12、d lessen the environmental impacts for both themunicipal and private owners.3.2 This practice serves as a means to inspect, test, and sealsewer lateral connections and a predetermined portion of thelateral lines from the mainline sewer, having selected theappropriate chemical grouts using the latera
13、l packer method.Television (or optical) inspection and sewer lateral connectiontesting are used to assess the condition and document anyrepairs.1This practice is under the jurisdiction of ASTM Committee F36 on Technologyand Underground Utilities and is the direct responsibility of Subcommittee F36.2
14、0on Rehabilitation of Sewers Using Chemical Grouting Techniques.Current edition approved Feb. 1, 2005. Published February 20052For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information,
15、 refer to the standards Document Summary page onthe ASTM website.3Available from NASSCO, 1314 BedfordAve., Suite 201 Baltimore, MD 21208.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.3.3 This practice should not be used where mainl
16、ine andlateral connections are found with longitudinally cracked pipe,structurally unsound pipe, or flattened or out of round pipe.4. Contract Responsibilities4.1 The lateral connection sealing contracts should define oraffix responsibility for, or make provisions for, the followingitems:4.1.1 Notic
17、e Of Client/Owner Requirements, which arerelevant to, and within the scope of, work to be performedunder the contract.4.1.2 Municipal And Other Licenses And Permits, (seeF 2304) and assistance in obtaining approvals or consent fromutilities or carriers or other persons or organizations uponwhose pro
18、perty or authority might be impinged by the perfor-mance of work under the contract; or a written release fromresponsibility for the performance of work under the contract ifand to the extent that such work is precluded by the inability toobtain approvals or consent. If working on private propertype
19、rmission from the owners representative, the sewer lineowner and the building department.4.1.3 Access To Site Of Work, to be provided to the extentthat the owner is legally able to do so, if unable to, a writtenrelease from responsibility for the performance of work at siteswhere access cannot be ma
20、de available.4.1.4 Clearances of Blockages or Obstructions, in the sewersystem, if any, if such clearance is required for performance ofwork under the contract and if such clearance is not otherwiseprovided for within the contract.4.1.5 Location and Exposure of All Manholes, unless other-wise provid
21、ed for in the technical specifications of the contract.4.1.6 A Manhole Numbering System , for all areas of theproject, and accurate manhole invert elevations when requiredfor performance of the work.4.1.7 The Shutdown or Manual Operation of Certain PumpStations, if such becomes necessary for perform
22、ance of thework.4.1.8 Water, necessary for performance of work under thecontract, with permission to use water from fire hydrants at thesite of work, or other suitable designated sources within areasonable distance from work areas.4.1.9 Disposal Area , for all materials removed from thesewers during
23、 the performance of the work and the unencum-bered right of the contractor to transport and expeditiouslydispose of such materials at a location designated by the owner.4.1.10 A Secure Storage Area, of a size adequate to accom-modate the required vehicles, equipment, and materials for theperiod of t
24、he contract.4.1.11 Notice To Third Parties, (such as utilities) of thecontractors intent to perform work in an area where suchparties may have rights to underground property or facilities.Request for maps or other descriptive information as to thenature and location of such underground facilities or
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF24542005STANDARDPRACTICEFORSEALINGLATERALCONNECTIONSANDLINESFROMTHEMAINLINESEWERSYSTEMSBYTHELATERALPACKERMETHODUSINGCHEMICALGROUTING

链接地址:http://www.mydoc123.com/p-538746.html