《ASTM F1563-2001(2007) Standard Specification for Tools to Squeeze-off Polyethylene (PE) Gas Pipe or Tubing《聚乙烯(PE)气体管道或管子用挤出工具的标准规范》.pdf》由会员分享,可在线阅读,更多相关《ASTM F1563-2001(2007) Standard Specification for Tools to Squeeze-off Polyethylene (PE) Gas Pipe or Tubing《聚乙烯(PE)气体管道或管子用挤出工具的标准规范》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: F 1563 01 (Reapproved 2007)An American National StandardStandard Specification forTools to Squeeze-off Polyethylene (PE) Gas Pipe or Tubing1This standard is issued under the fixed designation F 1563; the number immediately following the designation indicates the year oforiginal adoption
2、 or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This specification covers the physical requirements fortools used to squeez
3、e-off polyethylene (PE) pipe and tubing. Itis limited to squeeze-off procedures set forth by the pipemanufacturer as referred to in Specification D 2513 for gaspressure pipe systems.1.2 Nothing in this specification shall be construed asrecommending practices or systems at variances with govern-ing
4、codes and project specifications.1.3 Where applicable in this specification, “pipe” shallmean “pipe and tubing,” and “tool” shall mean “squeeze-offtool.”1.4 The values stated in inch-pound units are to be regardedas the standard. The SI units given in parentheses are forinformation only.1.5 The foll
5、owing safety hazards caveat pertains only to thetest methods portions, Section 5 and Appendix X1 of thisspecification: This standard does not purport to address all ofthe safety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate
6、safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2D 638 Test Method for Tensile Properties of PlasticsD 1598 Test Method for Time-to-Failure of Plastic PipeUnder Constant Internal PressureD 1600 Terminology
7、for Abbreviated Terms Relating toPlasticsD 2513 Specification for Thermoplastic Gas Pressure Pipe,Tubing, and FittingsF 412 Terminology Relating to Plastic Piping SystemsF 1041 Guide for Squeeze-Off of Polyolefin Gas PressurePipe and Tubing3. Terminology3.1 GeneralDefinitions are in accordance with
8、Terminol-ogy F 412, unless otherwise specified. Abbreviations are inaccordance with Terminology D 1600, unless otherwise speci-fied.3.2 Definitions of Terms Specific to This Standard:3.2.1 squeeze-offa technique used to control the flow ofgas through a pipe by the compressing action of a mechanical,
9、hydraulic or pneumatic device. Squeeze-off may be used, asrecommended by the tool or pipe manufacturer, to reduce theflow of gas to an acceptable rate. Under certain conditionscomplete stoppage of flow may be obtained.4. Materials and Manufacture4.1 Tools shall be manufactured from materials that ha
10、vethe structural properties to meet the requirements of thisspecification.5. Other Requirements5.1 Force MechanismThe force mechanism (mechanical,hydraulic or pneumatic) shall provide a force of at least 1.25times the force required to squeeze-off the most rigid pipe sizewithin the squeeze parameter
11、s recommended by the manufac-turer of the tool. The most rigid pipe is a function of pipediameter, wall thickness, pipe material and temperature. Thetool manufacturer determines which pipe products his tool issuitable for. Power tools such as impact wrenches or pneumaticmotored torque multipliers sh
12、all not be used.5.2 Tool StrengthA tool shall not be structurally damagedor functionally affected when tested as follows:5.2.1 Measure the load (P) required to squeeze-off the mostrigid pipe (largest size, thickest wall, highest density, lowesttemperature) within the range of the tool.5.2.2 Prepare
13、a pipe specimen from this pipe. The specimenlength shall be no less than five times the nominal outsidediameter of the pipe, but in no case less than 12 in. (305 mm).5.2.3 Insert the pipe specimen into the tool. Center thespecimen in the tool.5.2.4 Apply the largest load attainable by the force mech
14、a-nism (without additional mechanical advantage) onto themechanical stops and then inspect. Any permanent damage ordeformation to the mechanical or hydraulic components iscause for rejection of the tool.1This specification is under the jurisdiction of ASTM Committee F17 on PlasticPiping Systems and
15、is the direct responsibility of Subcommittee F17.60 on Gas.Current edition approved Aug. 1, 2007. Published August 2007. Originallyapproved in 1993. Last previous edition approved in 2001 as F1563-01.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Servic
16、e at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.5.2.5 Apply a load of 1.25 3 P (see 5.2.1) on
17、the pipe fortwenty cycles. A cycle is: apply load, hold load for one minute,remove load. For each cycle, use a new unsqueezed area ofpipe, at least three pipe diameters from a previous squeeze.5.3 Release ProtectionEach tool shall be built to preventunintentional release in the squeeze mode. A screw
18、-feedmechanism used to apply force in some tools qualifies aspremature release protection if the force can only be removedby unscrewing the mechanism at the 1.25 3 P test load.5.4 Release RateFor pipe sizes greater than 1 in. (25 mm)IPS, it is recommended3the tool design provide a release rateof 0.5
19、 in./min (12.7 mm/min) or less, as suggested in GuideF 1041.5.5 Flow ControlSqueeze-off results in the reduction ofgas flow and in some cases the complete stoppage of gas flow.This specification does not specify to what degree of gas flowcontrol is required for any set of squeeze-off conditions.Appe
20、ndix X1 provides a procedure for evaluating flow control.Other procedures for flow control evaluation may also be used.5.6 GroundingSqueezing and releasing the squeeze ofplastic pipe containing flowing gas can increase the presence ofstatic electricity on the pipe surfaces. The tool shall include as
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMF156320012007STANDARDSPECIFICATIONFORTOOLSTOSQUEEZEOFFPOLYETHYLENEPEGASPIPEORTUBING 聚乙烯 PE 气体 管道

链接地址:http://www.mydoc123.com/p-535158.html