1、Designation: E2620 08E2620 15Standard Classification forProgram and Project Estimate Summaries1This standard is issued under the fixed designation E2620; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A
2、number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This classification establishes a classification of cost summaries for use when estimating program and project costs.1.2 This classific
3、ation can be applied to construction programs and projects that include one or more construction work projects.1.3 This classification is not based on permanent physical elements of construction (as defined and classified in ClassificationE1557 for example); rather, the classification items are cost
4、 components common to most program and project estimates.1.4 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety and health practices and determine the applicabilit
5、y of regulatorylimitations prior to use.2. Referenced Documents2.1 ASTM Standards:2E631 Terminology of Building ConstructionsE833 Terminology of Building EconomicsE1557 Classification for Building Elements and Related SiteworkUNIFORMAT IIE2083 Classification for Building Construction Field Requireme
6、nts, and Office Overhead and for general terms related to building economics, refer to Terminology E833.3.1.1 element, nin construction planning, design, specification, estimating, and cost analysis, a significant component part ofthe whole that performs a specific function, or functions, regardless
7、 of design, specification, or construction method.3.1.1.1 DiscussionWhile through analysis, or by direct application, construction estimates categorized into elements (functional elements) withallocated costs, may be summarized in an elemental cost summary or elemental cost analysis; elements (funct
8、ional elements)also provide a framework for consistent preliminary project description, outline, and performance specification, through all stagesof planning, design, construction, and maintenance.1 This classification is under the jurisdiction of ASTM Committee E06 on Performance of Buildings and i
9、s the direct responsibility of Subcommittee E06.81 on BuildingEconomics.Current edition approved Sept. 1, 2008May 1, 2015. Published October 2008July 2015. Originally approved in 2008. Last previous edition approved in 2008 as E262008.DOI: 10.1520/E2620-08.10.1520/E2620-15.2 For referencedASTM stand
10、ards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.3 Available from the Construction Specifications Institute (CSI), 99 Canal Center Plaza
11、, Suite 300, Alexandria,110 South Union Street, Suite 100, Alexandria VA 22314,http:/www.csinet.org.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been made to the previous version. Becauseit may not be technicall
12、y possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C7
13、00, West Conshohocken, PA 19428-2959. United States13.1.2 elemental cost analysis, nin construction planning, design, specification, estimating, and cost analysis, a tabulation ofcost categorized by major group element,group element, or element, or any combination thereof, to which a parameterquanti
14、ty, or parameter quantities, has, or have, been applied to derive benchmark figures (rates, ratios, percentages, and so forth).3.1.2.1 DiscussionElemental cost analyses are valuable tools in planning, estimating, and controlling construction cost through all stages of planningand design. The benchma
15、rk figures are primarily derived from underlying estimate detail but can, in some circumstances, be useddirectly to approximate estimates for other projects.3.1.3 elemental cost summary, nin construction planning, design, specification, estimating, and cost analysis, a tabulation ofcost categorized
16、by major group element,group element, or element.3.1.4 group element, nin construction planning, design, specification, estimating, and cost analysis, a significant componentpart of the whole that includes relevant elements which, as a group, perform specific function, or functions, regardless of de
17、sign,specification or construction method.3.1.5 major group element, nin construction planning, design, specification, estimating, and cost analysis, a very significantcomponent part of the whole that includes relevant group elements which, as a group, perform major specific function, orfunctions, r
18、egardless of design, specification or construction method.3.1.6 parameter quantity, nin construction planning, design, specification, estimating, and cost analysis, a measure of theamount (quantity) of work included within a major group element,group element, or element, or any combination thereof,w
19、hich, using standardized metrics, ensures consistent elemental cost analysis preparation and comparison.3.1.7 UNIFORMAT II UII, na hierarchical breakdown structure of construction work ordered by elements.3.1.7.1 DiscussionPrimarily designed for cost management (planning, control, and analysis) duri
20、ng the planning, budgeting, and design phases ofconstruction, its hierarchical elemental breakdown structure is also used for qualitativetext richreports (preliminary projectdescription, condition assessment, asset description), and other quantitativetext and numericalpurposes (value engineering, ri
21、skanalysis, preliminary time schedule, building information modeling).3.2 Definitions of Terms Specific to This StandardStandard: Definitions for the terms program,project, and construction arelegion. For the purposes of this classification, the following variations in the terms are used.3.2.1 const
22、ruction, na discrete undertaking, requiring concerted effort, that has a specified end product and is accomplishedusing finite resources.3.2.2 construction layer, ncontains those activities and associated costs required to manage and deliver a constructed entity.3.2.3 program, na specific collection
23、, or group, of projects that is directed toward a common goal that may also serve as thebasis for defining and planning those projects.3.2.4 program layer, ncontains those activities and associated costs required to manage and deliver a collection, or group, ofprojects.3.2.5 project, na discrete und
24、ertaking, requiring concerted effort, that has defined objectives, a defined life within specific startand end points, that is usually accomplished by using finite, or limited, resources.3.2.6 project layer, ncontains those activities and associated costs required to manage and deliver a project.4.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME26202015STANDARDCLASSIFICATIONFORPROGRAMANDPROJECTESTIMATESUMMARIES 方案 项目 预算 概要 标准 分类 PDF

链接地址:http://www.mydoc123.com/p-531567.html