ASTM E2335-2012 Standard Guide for Laboratory Monitors《实验室监测的标准指南》.pdf
《ASTM E2335-2012 Standard Guide for Laboratory Monitors《实验室监测的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM E2335-2012 Standard Guide for Laboratory Monitors《实验室监测的标准指南》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E2335 12 An American National StandardStandard Guide forLaboratory Monitors1This standard is issued under the fixed designation E2335; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number
2、 in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.INTRODUCTIONThis guide is for use by laboratory monitors who observe interlaboratory testing performed byparticipating organizations that validate the le
3、gitimacy of test methods and also establish a base of datafrom which precision and bias statements are to be written. Interlaboratory testing is done to determinethe validity of a test standard. Such testing requires diligence by adhering to the protocol establishedfor performing the test in order t
4、o minimize variability which often exists between laboratories.Because laboratories differ in size, organization, management, personnel, facilities and environmentthere is always a potential for introducing variability in test results.Laboratory monitors confirm that the participating facilities adh
5、ere to the test protocol as closely aspossible, thereby improving the chances of a successful interlaboratory study. The laboratory monitorobserves and assesses but does not perform the functions of an auditor or trainer; the laboratorymonitor does not provide accreditation of a laboratory. Laborato
6、ry monitors should demonstrateexpertise in both the content and the intent of the test method. The laboratory monitor is responsibleto render a report to the appointing subcommittee. It is incumbent upon the laboratory monitor tomaintain objectivity when working with participating laboratories.Full-
7、scale product fire tests are expensive, especially full-scale tests of bedding and homefurnishings. The development of this standard is intended to ensure that the precision and biasdeveloped for E05 standards demonstrates a high level of statistical validity.This guide does not contain procedures f
8、or analysis of the test data obtained from an interlaboratorystudy. The user is directed to Practice E691, if the laboratory study includes six laboratories or more,and to Practice E2653 if the number of laboratories in the interlaboratory study is at least three, butless than six.Using a laboratory
9、 monitor as part of an interlaboratory test program is optional. However, if amonitor is used, all of the laboratories in the project are to be included.1. Scope1.1 This guide provides a general outline, for use by alaboratory monitor, to assess the qualifications of a laboratorywhich has requested
10、to participate in a specific ASTM inter-laboratory test.1.2 The preliminary assessment is based on observationsmade before initiation of any interlaboratory tests.1.3 The subcommittee, which appoints the laboratorymonitor, specifies the minimum requirements which an orga-nization should meet to qual
11、ify as a participant for theinterlaboratory test. If a pretest is to be included, see details inSection 13.1.4 This fire standard can not be used to provide quantitativemeasures.1This guide is under the jurisdiction ofASTM Committee E05 on Fire Standardsand is the direct responsibility of Subcommitt
12、ee E05.15 on Furnishings andContents.Current edition approved Dec. 1, 2012. Published December 2012. Originallyapproved in 2004. Last previous edition approved in 2008 as E2335-08. DOI:10.1520/E2335-12.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959
13、. United States11.5 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory requirements prior to us
14、e.2. Referenced Documents2.1 ASTM Standards:2E176 Terminology of Fire StandardsE691 Practice for Conducting an Interlaboratory Study toDetermine the Precision of a Test MethodE1537 Test Method for Fire Testing of Upholstered Furni-tureE1822 Test Method for Fire Testing of Stacked ChairsE2653 Practic
15、e for Conducting an Interlaboratory Study toDetermine Precision Estimates for a Fire Test Methodwith Fewer Than Six Participating Laboratories2.2 ISO Standards:ISO 13943 Fire Safety-Vocabulary3ISO/IEC 17025 :2005 General Requirements for the Com-petence of Testing and Calibration Laboratories32.3 Ot
16、her Standard:A2LA R101 -General Requirements: Accreditation of ISO/IEC 17025 Laboratories (December 2011)43. Terminology3.1 For definitions of terms used in this guide and associatedwith fire issues refer to the terminology contained in Termi-nology E176 and ISO 13943. In case of conflict, the defin
17、itiongiven in Terminology E176 shall prevail.3.2 Definitions of Terms Specific to This Standard:3.2.1 laboratory monitor, na representative of a subcom-mittee who is appointed to determine if the qualifications,equipment, personnel, and level of skill at a test facility meetthe criteria necessary to
18、 participate in an interlaboratory testprotocol.4. Significance and Use4.1 These guidelines are intended to enable a laboratorymonitor to perform onsite assessments of laboratory facilities.Accepted facilities will then participate in an interlaboratorytest protocol to establish precision and bias f
19、or a particularASTM standard.4.2 This assessment is intended to determine that all of theparticipants have the necessary equipment, an understanding ofthe test method, and the minimum level of skill necessary togather data which are to be used to establish precision and biasfor the particular standa
20、rd.4.3 This guide is not intended to be used as a tool to qualifyor accredit laboratories to perform any tests. Refer to ISO/IEC17025 and to the A2LA R101 Document for further guidanceon accreditation requirements.5. Qualifications of a Laboratory Monitor5.1 The laboratory monitor should demonstrate
21、 a level ofexpertise about the test method for which the interlaboratorytest will be done.5.2 Technical understanding of the test method is imperativein order to understand the principles of the measurements to bemade during the test procedure.5.3 The laboratory monitor should demonstrate objectivit
22、y.This includes not deriving any profit, commissions, or divi-dends from any commercial entity which performs the same orsimilar type test evaluations.6. Responsibilities of a Laboratory Monitor6.1 Develop a checklist specific to the subject test method.6.1.1 This checklist is to serve as a guide fo
23、r the inspectionof the laboratory during the initial qualification phase.6.2 The laboratory monitor performs an inspection of thetest laboratories to determine if the equipment conforms withthat required to perform the test method, and if adequatetraining of the operators has been done.6.3 Verify th
24、at the data acquisition system used by thelaboratory is compatible with the data to be acquired; and thatanalysis of the data will provide results which are reliable andcomparable to data obtained from other participants.6.4 Following completion of every laboratory inspection, anassessment report, b
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME23352012STANDARDGUIDEFORLABORATORYMONITORS 实验室 监测 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-530900.html