1、Designation: E1892 09E1892 15Standard Guide forPreparing Characterization Plans for DecommissioningNuclear Facilities1This standard is issued under the fixed designation E1892; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the ye
2、ar of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This standard guide applies to developing nuclear facility characterization plans to define the type, magnitude,
3、 location, andextent of radiological and chemical contamination within the facility to allow decommissioning planning. This guide amplifiesguidance regarding facility characterization indicated inASTM Standard E1281 on Nuclear Facility Decommissioning Plans. Thisguide does not address the methodolog
4、y necessary to release a facility or site for unconditional use. This guide specificallyaddresses:1.1.1 the data quality objective for characterization as an initial step in decommissioning planning.1.1.2 sampling methods,1.1.3 the logic involved (statistical design) to ensure adequate characterizat
5、ion for decommissioning purposes; and1.1.4 essential documentation of the characterization information.1.2 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety and h
6、ealth practices and determine the applicability of regulatorylimitations prior to use.2. Referenced Documents2.1 ASTM Standards:2E1167 Guide for Radiation Protection Program for Decommissioning OperationsE1281 Guide for Nuclear Facility Decommissioning Plans2.2 ANSI Standard:3ANSI N323AB American Na
7、tional Standard for Radiation Protection Instrumentation Test and Calibration, Portable SurveyInstruments3. Terminology3.1 Definitions:3.1.1 Characterization, nA systematic identification of the types, quantities, forms, and locations of contamination within afacility.3.1.2 Decommission, vtTo remove
8、 safely from service and to reduce residual contamination to a level that permits terminationof any applicable licenses and release of the property for unrestricted use.3.1.3 Decontamination, nActivities employed to reduce the levels of (radioactive or hazardous chemical) contamination in oron struc
9、tures, equipment, materials and personnel.3.1.4 Facility, nAs applied to a decommissioning project includes the structure and the soil around and under the structureto an agreed upon distance.4. Requirements4.1 General:1 This guide is under the jurisdiction of ASTM Committee E10 on Nuclear Technolog
10、y and Applicationsand is the direct responsibility of Subcommittee E10.03 onRadiological Protection for Decontamination and Decommissioning of Nuclear Facilities and Components.Current edition approved June 1, 2009Jan. 1, 2015. Published June 2009January 2015. Originally approved in 1997. Last previ
11、ous edition approved in 20032009 asE1892-97(2003).E1892-09. DOI: 10.1520/E1892-09.10.1520/E1892-15.2 For referencedASTM standards, visit theASTM website, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Docu
12、ment Summary page on the ASTM website.3 Available from American National Standards Institute (ANSI), 25 W. 43rd St., 4th Floor, New York, NY 10036, http:/www.ansi.org.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have
13、 been made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official docu
14、ment.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States14.1.1 As an initial part of facility decommissioning planning, a characterization plan is developed to define the nature, extentand location of contaminants, determine sampling loca
15、tions and protocols, determine quality assurance objectives forcharacterization, and define documentation requirements. The characterization plan considers the historic use of the facility toidentify the likely contaminants due to the radiological process involved, the chemicals introduced during th
16、e processing, and anyresulting contaminants that may be formed during the processing. Records or recounting of any process upsets or spills that mayhave occurred during the operating life of the facility should be considered to help determine the likely location of contaminants.In addition to examin
17、ing process records, interviews should be conducted with personnel knowledgeable in the past operation ofthe facility to identify conditions that may not have been recorded. During this pre-characterization data collection phase, anapproach for the characterization plan is developed.4.2 Methodology:
18、4.2.1 The actual characterization of a facility is an iterative process that involves initial sampling according to thecharacterization plan, field management (such as labeling, packaging, storing, and transport) of the samples, laboratory analysis,conformance to the data quality objectives (DQOs),
19、and then identifying any additional sampling required, refining the DQOs, andmodifying the characterization plan accordingly. The final product of the facility characterization is a document that describes thetype, amount, and location of contaminants that will require consideration and removal duri
20、ng the decommissioning operationssufficient to prepare a decommissioning plan. Sufficient information must be provided to:1) estimate volumes for various waste types,2) plan work to keep radiation exposure as low as reasonably achievable (ALARA),3) plan work to keep exposures to hazardous materials
21、ALARA, and4) support development of a decommissioning radiation protection program based on guidance from E1167.5. Significance and Use5.1 Knowledge of the nature and extent of contamination in a nuclear facility to be decommissioned is crucial to choosing theoptimum methods for decontamination and
22、decommissioning, and estimating the resulting waste volumes and personnelexposures. Implementing a characterization plan, developed in accordance with this standard, will result in obtaining or derivingthe above information.5.2 Information on the proposed decommissioning methods, waste volumes, and
23、estimated personnel radiation exposures canbe used to define the overall work scope, costs, schedules, and manpower needs for the decommissioning project. This informationmay be included in the Decommissioning Plan. The extent of over- or under-estimating these project parameters will be a functiono
24、f the sampling plan and statistical designs, described in Sections 6.1.4 and 6.1.5.6. Elements of Characterization Plan6.1 Radiological and hazardous constituent characterization of a facility shall be conducted in accordance with a written plan.The plan must provide direction for the performance of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME18922015STANDARDGUIDEFORPREPARINGCHARACTERIZATIONPLANSFORDECOMMISSIONINGNUCLEARFACILITIES 编制 设备

链接地址:http://www.mydoc123.com/p-529742.html