ASTM E1892-2009 Standard Guide for Preparing Characterization Plans for Decommissioning Nuclear Facilities《核设备退役准备计划的标准指南》.pdf
《ASTM E1892-2009 Standard Guide for Preparing Characterization Plans for Decommissioning Nuclear Facilities《核设备退役准备计划的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM E1892-2009 Standard Guide for Preparing Characterization Plans for Decommissioning Nuclear Facilities《核设备退役准备计划的标准指南》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: E 1892 09Standard Guide forPreparing Characterization Plans for DecommissioningNuclear Facilities1This standard is issued under the fixed designation E 1892; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of
2、last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This standard guide applies to developing nuclear facil-ity characterization plans to define the type, magnitude, loca
3、-tion, and extent of radiological and chemical contaminationwithin the facility to allow decommissioning planning. Thisguide amplifies guidance regarding facility characterizationindicated in ASTM Standard E 1281 on Nuclear FacilityDecommissioning Plans. This guide does not address themethodology ne
4、cessary to release a facility or site for uncon-ditional use. This guide specifically addresses:1.1.1 the data quality objective for characterization as aninitial step in decommissioning planning.1.1.2 sampling methods,1.1.3 the logic involved (statistical design) to ensure ad-equate characterizatio
5、n for decommissioning purposes; and1.1.4 essential documentation of the characterization infor-mation.1.2 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and he
6、alth practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2E 1167 Guide for Radiation Protection Program for Decom-missioning OperationsE 1281 Guide for Nuclear Facility Decommissioning Plans3. Terminology3.1 Definitions:3.1.1 Ch
7、aracterization, nA systematic identification ofthe types, quantities, forms, and locations of contaminationwithin a facility.3.1.2 Decommission, vtTo remove safely from serviceand to reduce residual contamination to a level that permitstermination of any applicable licenses and release of thepropert
8、y for unrestricted use.3.1.3 Decontamination, nActivities employed to reducethe levels of (radioactive or hazardous chemical) contamina-tion in or on structures, equipment, materials and personnel.3.1.4 Facility, nAs applied to a decommissioning projectincludes the structure and the soil around and
9、under thestructure to an agreed upon distance.4. Requirements4.1 General:4.1.1 As an initial part of facility decommissioning plan-ning, a characterization plan is developed to define the nature,extent and location of contaminants, determine sampling loca-tions and protocols, determine quality assur
10、ance objectives forcharacterization, and define documentation requirements. Thecharacterization plan considers the historic use of the facility toidentify the likely contaminants due to the radiological processinvolved, the chemicals introduced during the processing, andany resulting contaminants th
11、at may be formed during theprocessing. Records or recounting of any process upsets orspills that may have occurred during the operating life of thefacility should be considered to help determine the likelylocation of contaminants. In addition to examining processrecords, interviews should be conduct
12、ed with personnel knowl-edgeable in the past operation of the facility to identifyconditions that may not have been recorded. During thispre-characterization data collection phase, an approach for thecharacterization plan is developed.4.2 Methodology:4.2.1 The actual characterization of a facility i
13、s an iterativeprocess that involves initial sampling according to the charac-terization plan, field management (such as labeling, packaging,storing, and transport) of the samples, laboratory analysis,conformance to the data quality objectives (DQOs), and thenidentifying any additional sampling requi
14、red, refining theDQOs, and modifying the characterization plan accordingly.The final product of the facility characterization is a documentthat describes the type, amount, and location of contaminants1This guide is under the jurisdiction of ASTM Committee E10 on NuclearTechnology and Applications an
15、d is the direct responsibility of SubcommitteeE10.03 on Radiological Protection for Decontamination and Decommissioning ofNuclear Facilities and Components.Current edition approved June 1, 2009. Published June 2009. Originallyapproved in 1997. Last previous edition approved in 2003 as E 1892-97(2003
16、).2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Bo
17、x C700, West Conshohocken, PA 19428-2959, United States.that will require consideration and removal during the decom-missioning operations sufficient to prepare a decommissioningplan. Sufficient information must be provided to:1) estimate volumes for various waste types,2) plan work to keep radiatio
18、n exposure as low as reasonablyachievable (ALARA),3) plan work to keep exposures to hazardous materialsALARA, and4) support development of a decommissioning radiationprotection program based on guidance from E 1167.5. Significance and Use5.1 Knowledge of the nature and extent of contamination ina nu
19、clear facility to be decommissioned is crucial to choosingthe optimum methods for decontamination and decommission-ing, and estimating the resulting waste volumes and personnelexposures. Implementing a characterization plan, developed inaccordance with this standard, will result in obtaining orderiv
20、ing the above information.5.2 Information on the proposed decommissioning methods,waste volumes, and estimated personnel radiation exposurescan be used to define the overall work scope, costs, schedules,and manpower needs for the decommissioning project. Thisinformation may be included in the Decomm
21、issioning Plan.The extent of over- or under-estimating these project param-eters will be a function of the sampling plan and statisticaldesigns, described in Sections 6.1.4 and 6.1.5.6. Elements of Characterization Plan6.1 Radiological and hazardous constituent characterizationof a facility shall be
22、 conducted in accordance with a writtenplan. The plan must provide direction for the performance ofeffective sampling and inform concerned individuals as to theintent and methods used in the characterization process.Guidance on possible content and structure of such a writtenplan follows:6.1.1 Chara
23、cterization ObjectivesThe overall objectiveof the characterization task is to obtain information on thelocation, type, and amount of contaminants. This informationwill assist in the planning and performance of decommission-ing operations; and, the data collected during the characteriza-tion activity
24、 is valuable for source term evaluations to supportrisk assessments. Specific objectives must be clearly stated inthe characterization plan to ensure obtaining information that isrelevant to the decommissioning process.6.1.2 Data Quality ObjectivesData quality objectives(DQO) are quantitative and qu
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME18922009STANDARDGUIDEFORPREPARINGCHARACTERIZATIONPLANSFORDECOMMISSIONINGNUCLEARFACILITIES 设备 退役

链接地址:http://www.mydoc123.com/p-529741.html