1、Designation: E 1892 97 (Reapproved 2003)Standard Guide forPreparing Characterization Plans for DecommissioningNuclear Facilities1This standard is issued under the fixed designation E 1892; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revi
2、sion, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This standard guide applies to developing nuclear facil-ity characterization plans to define the ty
3、pe, magnitude, loca-tion, and extent of radiological and chemical contaminationwithin the facility to allow decommissioning planning. Thisguide amplifies guidance regarding facility characterizationindicated in ASTM Standard E 1281 on Nuclear FacilityDecommissioning Plans. This guide does not addres
4、s themethodology necessary to release a facility or site for uncon-ditional use. This guide specifically addresses:1.1.1 the data quality objective for characterization as aninitial step in decommissioning planning.1.1.2 sampling methods,1.1.3 the logic involved (statistical design) to ensure ad-equ
5、ate characterization for decommissioning purposes; and1.1.4 essential documentation of the characterization infor-mation.1.2 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-p
6、riate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:E 1167 Standard Guide for Radiation Protection Programfor Decommissioning Operations2E 1278 Standard Guide for Radioactive Pathway Method-ology for Rele
7、ase of Sites Following Decommissioning2E 1281 Standard Guide for Nuclear Facility Decommission-ing Plans23. Terminology3.1 Definitions:3.1.1 Characterization, nA systematic identification ofthe types, quantities, forms, and locations of contaminationwithin a facility.3.1.2 Decommission, vtTo remove
8、safely from serviceand to reduce residual contamination to a level that permitstermination of any applicable licenses and release of theproperty for unrestricted use.3.1.3 Decontamination, nActivities employed to reducethe levels of (radioactive or hazardous chemical) contamina-tion in or on structu
9、res, equipment, materials and personnel.3.1.4 Facility, nAs applied to a decommissioning projectincludes the structure and the soil around and under thestructure to an agreed upon distance.4. Requirements4.1 General:4.1.1 As an initial part of facility decommissioning plan-ning, a characterization p
10、lan is developed to define the nature,extent and location of contaminants, determine sampling loca-tions and protocols, determine quality assurance objectives forcharacterization, and define documentation requirements. Thecharacterization plan considers the historic use of the facility toidentify th
11、e likely contaminants due to the radiological processinvolved, the chemicals introduced during the processing, andany resulting contaminants that may be formed during theprocessing. Records or recounting of any process upsets orspills that may have occurred during the operating life of thefacility s
12、hould be considered to help determine the likelylocation of contaminants. In addition to examining processrecords, interview should be conducted with personnel knowl-edgeable in the past operation of the facility to identifyconditions that may not have been recorded. During thispre-characterization
13、data collection phase, an approach for thecharacterization plan is developed.4.2 Methodology:4.2.1 The actual characterization of a facility is an iterativeprocess that involves initial sampling according to the charac-terization plan, field management (such as labeling, packaging,storing, and trans
14、port) of the samples, laboratory analysis,conformance to the data quality objectives (DQOs), and thenidentifying any additional sampling required, refining theDQOs, and modifying the characterization plan accordingly.The final product of the facility characterization is a documentthat describes the
15、type, amount, and location of contaminants1This guide is under the jurisdiction of ASTM Committee E10 on NuclearTechnology and Applications and is the direct responsibility of Subcommittee E10.03 on Radiological Protection for Decontamination and Decommissioning ofNuclear Facilities and Components.C
16、urrent edition approved June 10, 1997. Published October 1997.2Annual Book of ASTM Standards, Vol 12.02.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.that will require consideration and removal during the decom-missioning operation
17、s sufficient to prepare a decommissioningplan. Sufficient information must be provided to:1) estimate volumes for various waste types2) plan work to keep radiation exposure as low as reasonablyachievable (ALARA)3) plan work to keep exposures to hazardous materialsALARA5. Significance and Use5.1 Know
18、ledge of the nature and extent of contamination ina nuclear facility to be decommissioned is crucial to choosingthe optimum methods for decontamination and decommission-ing, and estimating the resulting waste volumes and personnelexposures. Implementing a characterization plan, developed inaccordanc
19、e with this standard, will result in obtaining orderiving the above information.5.2 Information on the proposed decommissioning methods,waste volumes, and estimated personnel radiation exposurescan be used to define the overall work scope, costs, schedules,and manpower needs for the decommissioning
20、project. Thisinformation may be included in the Decommissioning Plan.The extent of over- or under-estimating these project param-eters will be a function of the sampling plan and statisticaldesigns, described in Sections 6.1.4 and 6.1.5.6. Elements of Characterization Plan6.1 Radiological and hazard
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTME189219972003STANDARDGUIDEFORPREPARINGCHARACTERIZATIONPLANSFORDECOMMISSIONINGNUCLEARFACILITIES 设备

链接地址:http://www.mydoc123.com/p-529740.html