ASTM D6825-2002e2 Standard Guide for Placement of Riprap Revetments《抛石护坡堆放标准指南》.pdf
《ASTM D6825-2002e2 Standard Guide for Placement of Riprap Revetments《抛石护坡堆放标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM D6825-2002e2 Standard Guide for Placement of Riprap Revetments《抛石护坡堆放标准指南》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 6825 02e2Standard Guide forPlacement of Riprap Revetments1This standard is issued under the fixed designation D 6825; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in parentheses
2、 indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.e1NOTESection X1.2 was corrected editorially in June 2004.e2NOTESection X1.2 was corrected editorially in September 2004.1. Scope1.1 This guide covers methods to place
3、 riprap with associ-ated filters for erosion control purposes. This guide does notrecommend a specific course of action because of the diversemethods and procedures that are capable of producing afunctional product. This guide identifies favorable riprap quali-ties and recommends practices best suit
4、ed to obtain thosequalities. The production of rock, use of recycled materials,rock with cut dimensions, and engineering and design isbeyond the scope of this guide. Special forms of riprap,including hand placed riprap, grouted riprap, or keyed (plated)riprap that is tamped into place to smooth the
5、surface, are alsobeyond the scope of this guide.1.2 This guide offers an organized collection of informationor a series of options and does not recommend a specific courseof action. This document cannot replace education or experi-ence and should be used in conjunction with professionaljudgment. Not
6、 all aspects of this guide may be applicable in allcircumstances. This ASTM standard is not intended to repre-sent or replace the standard of care by which the adequacy ofa given professional service must be judged, nor should thisdocument be applied without consideration of a projects manyunique as
7、pects. The word “Standard” in the title of thisdocument means only that the document has been developedand approved through the ASTM consensus process1.3 This standard may involve hazardous operations andequipment. This standard does not purport to address all of thesafety concerns, if any, associat
8、ed with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory requirements prior to use.2. Referenced Documents2.1 ASTM Standards:C33 Specification for Concrete AggregatesC 136 Test Method fo
9、r Sieve Analysis of Fine and CoarseAggregatesD75 Practice for Sampling AggregatesD 653 Terminology Relating to Soil, Rock, and ContainedFluidsD 4992 Practice for Evaluation of Rock to be used forErosion ControlD 5519 Practice for Particle Size Analysis of Natural andMan-Made Riprap MaterialsD 6092 P
10、ractice for Specifying Standard Sizes of Stone forErosion Control2.2 AASHTO Standard:M 2882000 Geotextile Specification for HighwayApplica-tions23. Terminology3.1 Terminology used in this guide, which is not included ornot completely defined in Terminology D 653, is definedbelow.3.2 Definitions of T
11、erms Specific to This Standard:3.2.1 beddingan aggregate mixture placed below theriprap. Bedding material is usually sand and gravel sized, butmay include cobble sized material. If placed without a geotex-tile, the bedding material may be used as a filter. If placed inconjunction with a geotextile,
12、the bedding may provide acushion for protection of the geotextile during riprap placementand provide confinement of the geotextile. It is possible to havemore than one bedding layer.3.2.2 chinkingthe practice of filling riprap surface voidswith smaller sized rock or aggregate.3.2.3 clam shella bucke
13、t tool that is operated from adragline or crane. The bucket is hinged at the top and openslike a clam so that rock can be placed without dropping it.3.2.4 Dxthe particle diameter at which x % by weight(dry) of the particles of a particular sample are finer.3.2.5 filterany substance, as geotextile or
14、 layer of sand/aggregate, placed to provide separation and retention of mate-rials, while allowing water to pass.3.2.6 floatera individual rock within the riprap layer thatis not interlocked with the surrounding rocks.1This guide is under the jurisdiction ofASTM Committee D18 on Soil and Rockand is
15、the direct responsibility of Subcommittee D18.17 on Rock for ErosionControl.Current edition approved August 10, 2002. Published October 2002.2Available from American Association of State Highway and TransportationOfficials (AASHTO), 444 N. Capitol St., NW, Suite 249, Washington, DC 20001.1Copyright
16、ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.3.2.7 maximum aspect ratiothe ratio of the greatest to theleast dimension, measured across mutually perpendicular axes,for any piece of rock; synonym, slabbiness.3.2.8 orange peela bucket tool tha
17、t is operated from adragline or crane and resembles the shape of an orange peeling.The sides lift up and out so that rock can be placed withoutdropping it.3.2.9 pit run materialrock that has been blasted but notprocessed to remove undersize pieces; synonym, shot rock orquarry run.3.2.10 revetmentban
18、k protection by armor, that is, byfacing of a bank or embankment with erosion-resistant mate-rial.3.2.11 riprapmaterial generally less than 2 tons (1.8tonnes) in mass, specially selected and graded. When properlyplaced, riprap prevents erosion through minor wave action, orstrong currents and thereby
19、 preserves the shape of a surface,slope, or underlying structure. Riprap may be specificallyproduced for the intended purpose, or it may be a by-productfrom a mining operation, structure demolition, or industrialprocess.3.2.12 rockany naturally formed aggregate of mineralmatter occurring in large ma
20、sses or fragments. Rock may beeither insitu or excavated material.4. Significance and Use4.1 Riprap is a commonly used form of scour protection andgeneral slope protection. Riprap provides a long term solutionwhen properly sized and installed. Riprap has structural flex-ibility so it will conform to
21、 irregular surfaces and adapt tominor subgrade settlement. It is often appropriate for use inconjunction with soil bioengineering (vegetation establish-ment) alternatives. In some environments, riprap may providehabitat for benthic organisms and fish.4.2 Revetments provide a facing or lining to armo
22、r asurface; and the layer thickness is typically minimized whileproviding the necessary resistance to scour. In this case,standardized practices to obtain consistent coverage havingacceptable thickness tolerances and voids become important.4.3 This guide may be used by owners, installation contrac-t
23、ors, regulatory agencies, inspection organizations, and design-ers and specifiers who are involved in the construction of ripraprevetments. Modifications may be required for specific jobconditions.This guide is not intentded for construction speci-fications on large projects, but may be referenced w
24、herepreparation of job specific construction specifications are notjustified. If this practice is included by reference in contractdocuments, the specifier must provide a list of supplementalrequirements.5. Planning for Riprap Placement5.1 Site conditions, level of protection required, construc-tion
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD68252002E2STANDARDGUIDEFORPLACEMENTOFRIPRAPREVETMENTS 护坡 堆放 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-523695.html