ASTM D4537-2004a Standard Guide for Establishing Procedures to Qualify and Certify Personnel Performing Coating Work Inspection in Nuclear Facilities《核设施涂层工作的质量和认证检验人员资格考核程序确立的标准指南.pdf
《ASTM D4537-2004a Standard Guide for Establishing Procedures to Qualify and Certify Personnel Performing Coating Work Inspection in Nuclear Facilities《核设施涂层工作的质量和认证检验人员资格考核程序确立的标准指南.pdf》由会员分享,可在线阅读,更多相关《ASTM D4537-2004a Standard Guide for Establishing Procedures to Qualify and Certify Personnel Performing Coating Work Inspection in Nuclear Facilities《核设施涂层工作的质量和认证检验人员资格考核程序确立的标准指南.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: D 4537 04aStandard Guide forEstablishing Procedures to Qualify and Certify PersonnelPerforming Coating Work Inspection in Nuclear Facilities1This standard is issued under the fixed designation D 4537; the number immediately following the designation indicates the year oforiginal adoptio
2、n or, in the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide delineates the requirements for developmentof procedures for th
3、e qualification of personnel who performinspection of coating work. These activities are accomplishedto verify conformance to specified requirements for nuclearfacility coating work whose satisfactory performance is re-quired in order not to compromise safety-related coatingsystems.1.2 The intent of
4、 this guide is to provide a uniform inter-pretation of the requirements in ANSI/ASME N45.2.6 andNQA-1 for the inspection of coating work in nuclear facilities.1.3 It is the intent of this guide to provide a recommendedbasis for qualification, not to mandate a singular basis for allqualifications. Va
5、riations or simplifications of the qualificationsdescribed in this guide may be appropriate for special coatingwork other than safety-related coating systems. Similarly, thequalification and certification process might be abbreviated forwork of minor scope such as touch-up.1.4 This standard does not
6、 purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of whoever uses this standard to consult andestablish appropriate safety and health practices and deter-mine the applicability of regulatory limitations prior to use.2. Referenced Documents2.1 AST
7、M Standards:2D 5144 Guide for Use of Protective Coating Standards inNuclear Power Plants2.2 ANSI/ASME Standards:3ANSI/ASME N45.2.6 Qualifications of Inspection, Exami-nation, and Testing Personnel for Nuclear Power PlantsANSI/ASME NQA-1 Quality Assurance Program Require-ments for Nuclear Facilities3
8、. Terminology3.1 Definitions of Terms Specific to This Standard:3.1.1 certification, nwritten documentation of qualifica-tion.3.1.2 coating work inspection, na phase of quality controlthat, by means of examination, observation, or measurement,determines the conformance of safety-related coating syst
9、emapplications to predetermined quality requirements. The terminspection as used in this standard shall be understood to meancoating work inspection.3.1.3 Level I, II, and III inspection, nindicative of thetime in grade classification for personnel who perform coatingwork inspection. Each level refl
10、ects progressive experience andresponsibility. This term is separate from and differs distinctlyfrom Coating Service Levels. The latter term reflects differinglocations throughout a nuclear plant where safety-related andother coatings are found. (See Terminology section of GuideD 5144 for definition
11、s of Coating Service Levels I, II, and III.)3.1.4 personnel performing coating work inspection,nindividuals whose job functions include but are not neces-sarily limited to coating work inspection.3.1.5 qualifications, nskills, training, and experience re-quired for personnel to perform properly the
12、duties and executethe responsibilities of the appropriate certification level.3.1.6 safety-related coating system, na coating systemused inside or outside of the reactor containment, the detach-ment of which could adversely affect the safety function ofsafety-related structures, systems, or componen
13、ts (SSC).3.1.7 training, nthe program developed to ensure thatpersonnel receive the knowledge and skills necessary forqualification.4. Significance and Use4.1 The requirements of this guide apply to personnel whoperform coating work inspection during (1) fabrication, (2)receipt of items at the const
14、ruction site, (3) construction, (4)pre-operational and startup testing, and (5) operational phasesof nuclear facilities.1This guide is under the jurisdiction of ASTM Committee D33 on ProtectiveCoating and Lining Work for Power Generation Facilities and is the directresponsibility of Subcommittee D33
15、.04 on Quality Systems and Inspection.Current edition approved Aug. 1, 2004. Published September 2004. Originallyapproved in 1986. Last previous edition approved in 2004 as D 4537 04.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.
16、org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3Available from American National Standards Institute, 11 W. 42nd Street, 13thFloor, New York, NY 10036.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Co
17、nshohocken, PA 19428-2959, United States.4.2 It is the responsibility of each organization participatingin the project to ensure that only those personnel within theirrespective organizations who meet the requirements of thisguide are permitted to perform coating work inspection activi-ties covered
18、by this guide.4.3 The organization(s) responsible for establishing theapplicable requirements for activities covered by this guideshall be identified, and the scope of their responsibility shall bedocumented. Delegation of this responsibility to other qualifiedorganizations is permitted and shall be
19、 documented.4.4 It is the responsibility of the organization performingthese activities to specify the detailed methods and proceduresfor meeting the requirements of this guide, unless they areotherwise specified in the contract documents.4.5 In the event of conflict, users of this guide mustrecogni
20、ze that the licensees plant-specific quality assuranceprogram and licensing commitments shall prevail with respectto the process of qualifying personnel performing inspection ofcoating work.5. General Requirements5.1 Provisions shall be made for the indoctrination ofpersonnel performing coating work
21、 inspection as to the tech-nical objectives of the project, the codes and standards that areto be used, and the quality assurance elements that are to beemployed.5.2 The need for formal training programs shall be deter-mined, and such training activities shall be conducted asrequired to qualify pers
22、onnel who perform coating workinspection. On-the-job participation shall also be included inthe program, with emphasis on first-hand experience gainedthrough actual performance of inspections.5.3 A candidates qualifications for certification shall beinitially determined by a suitable evaluation of t
23、he candidateseducation, experience, training, examination results, and by acapability demonstration. The qualifying organizations deter-minations must reflect definitive criteria with respect to theextent and currency of a candidates experience and training.5.4 The job performance of personnel who p
24、erform coatingwork inspection shall be reevaluated at periodic intervals not toexceed three years. The reevaluation process shall weighevidence of continued satisfactory performance of inspectionfor the required extent or determine capability in accordancewith 5.3. If, during this evaluation or at a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMD45372004ASTANDARDGUIDEFORESTABLISHINGPROCEDURESTOQUALIFYANDCERTIFYPERSONNELPERFORMINGCOATINGWORKINSPECTIONINNUCLEARFACILITIES

链接地址:http://www.mydoc123.com/p-517317.html