1、Designation: C977 10Standard Specification forQuicklime and Hydrated Lime for Soil Stabilization1This standard is issued under the fixed designation C977; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A
2、 number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.This standard has been approved for use by agencies of the Department of Defense.1. Scope1.1 This specification pertains to quicklime and hydrated
3、lime, either high calcium, dolomitic, or magnesian lime, for usein stabilization of soils (See Note 2).NOTE 1Quicklime and hydrated lime act upon clay soils and mayrender such soils suitable for highway construction and for other load-bearing applications. In most cases, lime causes finely divided c
4、layparticles to agglomerate into coarser particles which improves load-bearing properties and subsequently the lime-treated soil hardens bychemical reaction.NOTE 2No attempt is made to present requirements for by-productlime, commercial lime slurry, etc. Specification requirements for thesematerials
5、 could be better determined on a local basis.1.2 The values stated in inch-pound units are to be regardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.3 This standard does not purport to ad
6、dress all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C25 Test Met
7、hods for Chemical Analysis of Limestone,Quicklime, and Hydrated LimeC50 Practice for Sampling, Sample Preparation, Packaging,and Marking of Lime and Limestone ProductsC51 Terminology Relating to Lime and Limestone (as usedby the Industry)C110 Test Methods for Physical Testing of Quicklime,Hydrated L
8、ime, and LimestoneD6276 Test Method for Using pH to Estimate the Soil-LimeProportion Requirement for Soil Stabilization3. Chemical Composition3.1 Unless otherwise specified, for definitions of terms usedin this specification, refer to Terminology C51.3.2 Quicklime and hydrated lime for soil stabiliz
9、ation shallconform to the following chemical composition:Calcium and Magnesium Oxides (on a non-volatile basis,minimum %)90.0Carbon Dioxide (taken at point of manufacture, maximum %) 5.0Free Moisture (taken at point of manufacture, maximum %) 2.04. Physical Properties4.1 Hydrated Lime, shall have no
10、t more than 3 % retainedon a No. 30 (590-m) sieve and not more than 25 % retainedon a No. 200 (75-m) sieve.4.2 Quicklime:4.2.1 Particle Size of QuicklimeQuicklime shall all pass a1.0-in. (24.4-mm) sieve.4.2.2 Quicklime for soil stabilization shall have a tempera-ture rise of a minimum of 30C in 20 m
11、in.4.2.3 Residue of QuicklimeQuicklime for soil stabiliza-tion shall have not more than 10 % residue.5. Field Applications5.1 When quicklimes are used, ensure that thorough mixingof the lime and soil is accomplished and all lime pebbles havebeen hydrated with additional water and distributed uniform
12、lythroughout the soil. There shall be no lime pebbles presentbefore the compaction operation starts. Check by turning soilwith a spade at representative intervals and inspect for visiblelime pebbles. Care should be exercised on initial dry applica-tions to minimize environmental dusting.5.2 For hydr
13、ated limes, additional water shall be added tothe lime-soil mixture to facilitate mixing and uniform distri-bution of the hydrated lime in the soil layer. There shall be nolime clumps present before the compaction operation starts.Check by turning soil with a spade at representative intervalsand ins
14、pect for visible lime clumps. Care should be exercisedon initial dry applications to minimize environmental dusting.31This specification is under the jurisdiction of ASTM Committee C07 on Limeand is the direct responsibility of Subcommittee C07.02 on Specifications andGuidelines.Current edition appr
15、oved Nov. 1, 2010. Published December 2010. Originallyapproved in 1983. Last previous edition approved in 2009 as C97703(2009). DOI:10.1520/C0977-03R09.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMSta
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC9772010STANDARDSPECIFICATIONFORQUICKLIMEANDHYDRATEDLIMEFORSOILSTABILIZATION 土壤 保持 稳定 生石灰 熟石灰 标准

链接地址:http://www.mydoc123.com/p-509029.html