1、Designation: C 946 91 (Reapproved 2001)Standard Practice forConstruction of Dry-Stacked, Surface-Bonded Walls1This standard is issued under the fixed designation C 946; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of la
2、st revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers material, workmanship, and con-struction procedures for applying surface bonded mortar toboth side
3、s of dry stacked concrete masonry units. It does notinclude grout, reinforcing, anchorage, or control joints sincetheir use is essentially the same as conventional concretemasonry construction, unless specifically mentioned in thispractice.NOTE 1Design and construction procedures for conventional co
4、ncretemasonry construction have been written by the American ConcreteInstitute, “Building Code Requirements for Concrete Masonry Structures”and the National Concrete Masonry Associations, “Specification for theDesign and Construction of Load-Bearing Concrete Masonry.”1.2 The values stated in inch-po
5、und units are to be regardedas the standard. The values given in parentheses are providedfor information only.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safet
6、y and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:C 55 Specification for Concrete Brick2C 90 Specification for Loadbearing Concrete MasonryUnits2C 129 Specification for Nonloadbearing Concrete MasonryUnits2C 145 S
7、pecification for Solid Load-Bearing Concrete Ma-sonry Units3C 270 Specification for Mortar for Unit Masonry2C 887 Specification for Packaged, Dry, Combined Materialsfor Surface Bonding Mortar22.2 American Concrete Institute Standard:531 Building Code Requirements for Concrete MasonryStructures, Comm
8、entary-ACI 531R-7942.3 International Masonry Industry All-Weather CouncilStandards:Recommended Practices and Guide Specifications for ColdWeather Masonry Construction52.4 National Concrete Masonry Association Standard:Specification for the Design and Construction of Load-Bearing Concrete Masonry63.
9、Storage3.1 Deliver and store surface bonding mortar in originalcontainers off the ground to prevent contact with water. Protectfrom rain with suitable covering.3.2 Store concrete masonry units off the ground to preventcontamination by mud, dust, and materials likely to causestaining or other defects
10、, and protect from rain.4. Materials and Manufacture4.1 Concrete masonry units shall be clean and dry, meetingthe requirements of Type I, moisture-controlled units, of theapplicable ASTM specification (Specifications C 55, C 90,C 129, and C 145). The surface to receive surface bondingmortar shall be
11、 free of paint, oil, efflorescence, or foreignmaterials that interfere with bonding.4.2 Mortar shall be mixed in accordance with the proportionspecification of Specification C 270 and shall be selected onthe basis of Appendix X1 of Specification C 270.4.3 Surface bonding mortar shall meet the requir
12、ements ofSpecification C 887. If the dry mix contains hard lumps, it shallnot be used.4.4 Shims shall be corrosion-resistant metal or plastic witha minimum compressive strength of 2000 psi (13.8 MPa), orsteel protected from corrosion by a coating of zinc at least 0.8oz/ft2(2.4 gm/mm2), or by a coati
13、ng of cadmium or zinc ofequivalent corrosion resistance.5. Leveling Courses5.1 Leveling courses, when needed, are to provide a smooth1This practice is under the jurisdiction of ASTM Committee C12 on Mortars andGrouts for Unit Masonry and is the direct responsibility of Subcommittee C12.06 onSurface
14、Bonding.Current edition approved September 15, 1991. Published November 1991.Originally published as C 946 81. Last previous edition C 946 84 (1989).2Annual Book of ASTM Standards, Vol 04.05.3Discontinued. See 1989 Annual Book of ASTM Standards, Vol 04.05.4Available from the American Concrete Instit
15、ute, P.O. Box 9094, FarmingtonHills, MI 18333.5Available from the International Masonry Industry All-Weather Council,Mason Contractors Association of America, 17 W601 Fourteenth St., OakbrookTerrace, IL 60181.6Available from the National Concrete Masonry Assn., P.O. Box 781, Herndon,VA 22070.1Copyri
16、ght ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.surface level within14 in. (6.35 mm) in 20 ft (6.1 m), for drystacking concrete masonry units. Leveling courses shall belocated whenever a vertical difference greater than12 in. (12.7mm) in 10
17、 ft (3.0 m) occurs within one course. Levelingcourses are usually located on the first course above thefoundation, because footings are not normally placed in a levelcondition, and at each floor level.5.2 When mortar or surface bonding mortar is used aleveling course, concrete masonry units shall be
18、 set in a fullbed of mortar, laid to a line with the top surface level, asdefined in 5.1, and butted together with no mortar in the headjoints. Bed joints shall be struck flush. If the cores are to begrouted, no mortar shall be placed in the space to receive grout.5.3 Allow mortar to set sufficientl
19、y so no movement breaksthe bond while dry stacking units in subsequent courses.6. Dry-Stacking Concrete Masonry Units6.1 Courses of concrete masonry units between the levelingcourses shall be placed without mortar on the bed or headjoints. Place units in running bond. Remove burrs and buttblocks tig
20、htly.6.2 Use shims, mortar, or surface bonding mortar to plumband level individual units when necessary.6.3 Check the wall every fourth course to be certain it isplumb and level. If any course is out of level by more than12in. (12.7 mm) in 10 ft (3.0 m) another leveling course shall bebuilt.6.4 Cut
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC94619912001STANDARDPRACTICEFORCONSTRUCTIONOFDRYSTACKEDSURFACEBONDEDWALLS 堆积 表面 粘结 构造 PDF

链接地址:http://www.mydoc123.com/p-508932.html