ASTM C1798 C1798M-2016e1 Standard Specification for Returned Fresh Concrete for Use in a New Batch of Ready-Mixed Concrete《新批预拌混凝土使用返回新拌混凝土的标准规格》.pdf
《ASTM C1798 C1798M-2016e1 Standard Specification for Returned Fresh Concrete for Use in a New Batch of Ready-Mixed Concrete《新批预拌混凝土使用返回新拌混凝土的标准规格》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1798 C1798M-2016e1 Standard Specification for Returned Fresh Concrete for Use in a New Batch of Ready-Mixed Concrete《新批预拌混凝土使用返回新拌混凝土的标准规格》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1798/C1798M 161Standard Specification forReturned Fresh Concrete for Use in a New Batch of Ready-Mixed Concrete1This standard is issued under the fixed designation C1798/C1798M; the number immediately following the designation indicates theyear of original adoption or, in the case of r
2、evision, the year of last revision. A number in parentheses indicates the year of lastreapproval. A superscript epsilon () indicates an editorial change since the last revision or reapproval.1NOTEThe designation was editorially corrected to match the units of measurement statement in October 2016.1.
3、 Scope1.1 This specification covers returned fresh concrete for usein a new batch of ready-mixed concrete. Requirements forreturned fresh concrete shall be either as hereinafter specifiedor as specified by the purchaser. In any case where therequirements of the purchaser differ from those in thisspe
4、cification, the purchasers requirements shall govern. Thisspecification does not cover the placement, consolidation,curing, or protection of the concrete after delivery to thepurchaser.1.2 This specification by itself shall not grant permission tothe manufacturer to use returned fresh concrete in a
5、new batchof concrete.NOTE 1The permission to use returned fresh concrete may beaddressed in purchase documents, which may reference this specification.1.3 Returned fresh concrete in a quantity of less than 450 kg1000 lb or 0.2 m30.25 yd3 shall not be subject to thisspecification.1.4 The values state
6、d in either SI units or inch-pound unitsare to be regarded separately as standard. The values stated ineach system may not be exact equivalents; therefore, eachsystem shall be used independently of the other. Combiningvalues from the two systems may result in nonconformancewith the standard.1.5 The
7、text of this standard references notes and footnotes,which provide explanatory information. These notes and foot-notes shall not be considered as requirements of the standard.1.6 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibi
8、lity of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use. (WarningFreshhydraulic cementitious mixtures are caustic and may causechemical burns to skin and tissue upon prolonged use.2)2. Referenced
9、Documents2.1 ASTM Standards:3C94/C94M Specification for Ready-Mixed ConcreteC125 Terminology Relating to Concrete and Concrete Ag-gregatesC494/C494M Specification for Chemical Admixtures forConcreteC1064/C1064M Test Method for Temperature of FreshlyMixed Hydraulic-Cement Concrete3. Terminology3.1 De
10、finitionsThe terms used in this specification aredefined in Terminology C125.3.2 Definitions of Terms Specific to This Standard:3.2.1 admixture, hydration stabilizing, nset-retardingadmixture, conforming to Specification C494/C494M Type Bor D, that can predictably reduce the hydration rate of cement
11、for applications requiring the management of time of setting ofreturned concrete, reducing the hydration rate of cement finesin water from concrete production, or for applications requiringextended delivery time of ready-mixed concrete.3.2.2 concrete, returned fresh, nfresh concrete not yetdischarge
12、d from a ready-mixed concrete transportation unitwhen it is returned to the manufacturer.4. Ordering Information4.1 The new batch of concrete containing returned freshconcrete shall meet all requirements of the purchaser.NOTE 2The requirements of this specification are in addition to thoseof the pur
13、chaser and the specification of the new batch of concretecontaining returned fresh concrete.1This specification is under the jurisdiction of ASTM Committee C09 onConcrete and Concrete Aggregates and is the direct responsibility of SubcommitteeC09.40 on Ready-Mixed Concrete.Current edition approved M
14、arch 15, 2016. Published April 2016. DOI: 10.1520/C1798_C1798M16E01.2See Section on Safety Precautions, Manual of Aggregate and Concrete Testing,Annual Book of ASTM Standards, Vol 04.02.3For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceas
15、tm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States1NOTE 3If using Specification C94/C94M for concrete potentiall
16、yincorporating returned fresh concrete, it is recommended the purchaserselect Option A. In this option, the manufacturer has responsibility formaking necessary adjustments to mixture proportions to ensure the newconcrete batch containing returned fresh concrete will meet the require-ments of the pur
17、chaser.4.2 At the request of the purchaser, the manufacturer shallfurnish information on procedures used to reuse returned freshconcrete.5. Measuring Materials5.1 The amount of returned fresh concrete shall be deter-mined by mass or volume with equipment capable of measur-ing within an accuracy of 6
18、 450 kg 1000 lb or 6 0.2 m30.25yd3.5.2 If necessary to convert between the mass and volume ofreturned fresh concrete, it shall be permissible to use themeasured or design density of the returned fresh concrete.5.3 Water added to the returned fresh concrete after theoriginal loading of the returned f
19、resh concrete until loading ofthe new batch of concrete shall be measured to an accuracy of6 3 % of the amount added or 4 liters 1.0 gal, whichever isgreater.5.4 Admixtures added to the returned fresh concrete afterthe original loading of the returned fresh concrete until loadingof the new batch of
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC1798C1798M2016E1STANDARDSPECIFICATIONFORRETURNEDFRESHCONCRETEFORUSEINANEWBATCHOFREADYMIXEDCONCRETE

链接地址:http://www.mydoc123.com/p-465855.html