ASTM C1722-2011 Standard Guide for Repair and Restoration of Dimension Stone《修补及恢复规格石块的标准指南》.pdf
《ASTM C1722-2011 Standard Guide for Repair and Restoration of Dimension Stone《修补及恢复规格石块的标准指南》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1722-2011 Standard Guide for Repair and Restoration of Dimension Stone《修补及恢复规格石块的标准指南》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1722 11Standard Guide forRepair and Restoration of Dimension Stone1This standard is issued under the fixed designation C1722; the number immediately following the designation indicates the year oforiginal adoption or, in the case of revision, the year of last revision. A number in pare
2、ntheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide describes materials and procedures for re-storing facades constructed of or finished with dimensionstone. All of the materials, procedures
3、, and principles aresuitable for restoration of historic and nonhistosric structures.1.2 This guide is not intended to address restoration ofinterior dimension stone, although many of the materials andprocedures may be suitable for interior use.1.3 The values stated in inch-pound units are to be reg
4、ardedas standard. The values given in parentheses are mathematicalconversions to SI units that are provided for information onlyand are not considered standard.1.4 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the use
5、r of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory requirements prior to use.2. Referenced Documents2.1 ASTM Standards:2C5 Specification for Quicklime for Structural PurposesC10 Specification for Natural CementC91 Specification for
6、 Masonry CementC119 Terminology Relating to Dimension StoneC141 Specification for Hydraulic Hydrated Lime for Struc-tural PurposesC150 Specification for Portland CementC207 Specification for Hydrated Lime for Masonry Pur-posesC270 Specification for Mortar for Unit MasonryC1180 Terminology of Mortar
7、and Grout for Unit MasonryC1242 Guide for Selection, Design, and Installation ofDimension Stone Attachment SystemsC1324 Test Method for Examination and Analysis of Hard-ened Masonry MortarC1329 Specification for Mortar CementC1489 Specification for Lime Putty for Structural PurposesC1515 Guide for C
8、leaning of Exterior Dimension Stone,Vertical And Horizontal Surfaces, New or ExistingC1521 Practice for EvaluatingAdhesion of Installed Weath-erproofing Sealant Joints2.2 OSHA Directive:STD 1-12.026 Abrasive Operations Using Cut Off Wheelsand Masonry Saws3. Terminology3.1 DefinitionsFor definitions
9、of terms used in this guide,other than those listed below, refer to Terminology C119 andTerminology C1180.3.2 Definitions of Terms Specific to This Standard:3.2.1 defectnaturally occuring flaw in the stone.3.2.2 dimension stone restoration consultantone who isknowledgeable and experienced with the c
10、are, restoration, andrepair of building dimension stone.3.2.3 distresslocalized damage of stone units such ascracks, chips, holes, deterioration, bowing, and projections thathave been broken off or worn down caused by wear, erosion,settlement, displacement, or other adverse chemical or me-chanical a
11、ctions.3.2.4 dutchman repaira stone repair method whereby aportion of a stone unit is cut out and replaced with anotherpiece of stone (called a dutchman). The dutchman is usuallyrectangular or square in shape, but may also be rounded, and isusually at a corner or edge of the stone unit.3.2.5 pointin
12、gplacing mortar in the outer portion of thejoints between stone units. To point stone joints, the outerportion of the joints must either be left open during installationor cut or ground out, i.e. have the mortar removed from theouter portion of the joint. New mortar is then pressed into thejoint wit
13、h a pointing tool. The increased compaction of the newmortar provides an improved resistance to water penetration atthe joint compared to the primary stone setting mortar.1This guide is under the jurisdiction of ASTM Committee C18 on DimensionStone and is the direct responsibility of Subcommittee C1
14、8.07 on EnvironmentalProperties, Behavior, and Cleaning.Current edition approved Oct. 1, 2011. Published November 2011. DOI:10.1520/C1722-11.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volu
15、me information, refer to the standards Document Summary page onthe ASTM website.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.3.2.5.1 repointingthe removal of existing mortar from theouter portion of the joints between stone units
16、and thesubsequent pointing of the joints.3.2.5.2 tuck pointing (tuckpointing, tuck-pointing)thisterm is intentionally not used in this standard, because it isoften used inconsistently. It is variously used to mean repoint-ing, simply pointing, or applying a raised bead of mortar (oftenof a different
17、 color) down the middle of mortar joints.3.2.6 proprietary repair mortaran exclusively manufac-tured product formulated from cementitious compounds, fineaggregates, mineral pigments, possibly bonding agents, andother additives. It is used for filling cracks, holes, and otherdepressions in stone unit
18、s or for rebuilding the surface ofdamaged stone units to their original profile.3.2.7 repair mortar, cement-basedrepair mortar utilizingportland cement, masonry cement, blended cement, mortarcement, or natural cement as the primary binder.3.2.7.1 repair mortar, polymer-modifiedcement-based re-pair m
19、ortar incorporating a dry or liquid polymer modifier as asecondary binder, to alter the performance properties3.2.7.2 repair mortar, polymer-basedrepair mortar con-sisting of a polymer binder and aggregates, without cement orhydraulic components.4. Significance and Use4.1 The purpose of this guide i
20、s to assist those who wish torestore facades constructed of or finished with dimensionstone. It is an aid to owners, building managers, architects,engineers, contractors and others involved with restoringdimension stone.4.2 This guide is not meant to supersede manufacturersdirections and recommendat
21、ions for the use of their specificproducts, or written directions from the architect or buildingowner. When manufacturers directions are in conflict with thisguide, follow their recommendations or consult with theirtechnical staff for further direction.4.3 Prior to undertaking a full-scale repair or
22、 cleaningprocedure, the methods under consideration for repair, patch-ing or cleaning should be tested on an area not easily visible oron sample stones. The test will assist in judging the effective-ness of the chosen method and permit assessment of potentialdamage to the building stone. Completely
23、evaluate the successof the sample repairs before undertaking the full-scale cleaningor repair procedure.5. Condition Survey and Restoration Plan5.1 The first step in a restoration project is to conduct aproject survey consisting of a review of existing originalarchitectural drawings and specificatio
24、ns and any original stoneshop drawings that may be available. The stone shop drawingscontain detailed information on stone and anchoring that is notalways found in the architectural drawings. The shop drawingreview is followed by a thorough examination of all exposedstone surfaces and related elemen
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC17222011STANDARDGUIDEFORREPAIRANDRESTORATIONOFDIMENSIONSTONE 修补 恢复 规格 石块 标准 指南 PDF

链接地址:http://www.mydoc123.com/p-465654.html