ASTM C1618-2013 Standard Test Method for Concrete Sanitary Sewer Pipe by Negative (Vacuum) or Positive Air Pressure《使用负气压(真空)和正气压的混凝土排污管的标准试验方法》.pdf
《ASTM C1618-2013 Standard Test Method for Concrete Sanitary Sewer Pipe by Negative (Vacuum) or Positive Air Pressure《使用负气压(真空)和正气压的混凝土排污管的标准试验方法》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1618-2013 Standard Test Method for Concrete Sanitary Sewer Pipe by Negative (Vacuum) or Positive Air Pressure《使用负气压(真空)和正气压的混凝土排污管的标准试验方法》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1618 05 (Reapproved 2013)C1618 13Standard Test Method forConcrete Sanitary Sewer Pipe by Negative (Vacuum) orPositive Air Pressure1This standard is issued under the fixed designation C1618; the number immediately following the designation indicates the year oforiginal adoption or, in t
2、he case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers procedures for testing of precast concrete pipe sections, pri
3、or to delivery, where maximum fieldleakage rates are specified.1.2 Tests described in this standard are intended to be used at the point of manufacture of the concrete pipe and are not intendedfor testing installed pipe (for field tests see Practices C924, C969, and C1214). The user of this specific
4、ation is advised thatindividual or multiple pipe sections may be tested for the purpose of testing the pipe barrel and additionally the joints in straightalignment when multiple pipe sections are tested.1.3 The two leakage rates shown, which were used in calculating the test times, were chosen based
5、 on two generally acceptedfield air and vacuum test criteria. Test times are based on leakage rates and therefore are proportional only to the pipe diameterand are constant for any length of test pipe or pipeline.1.4 Test times tabulated and the rate of air loss in this standard are based on success
6、ful testing of installed pipelines. However,since air and water have different physical properties, retests of some pipelines not meeting field air tests have been successfulwhen tested with water. The leakage rates of 0.0017 CFM/ft2 and 0.0003 CFM/ft2, were determined empirically as the maximumsfor
7、 pipe to meet the 50 and 200 gal/(in. of internal diameter) (mile of sewer) (24h) test rates, respectively.1.5 The values stated in inch-pound units are to be regarded as standard. No other units of measurement are included in thisstandard.NOTE 1The availability of this test procedure for concrete p
8、ipe varies from location to location. Check with local supplier(s) for availability andrecommendations.1.6 This standard does not purport to address all the safety concerns, if any, associated with its use. It is the responsibility ofthe user of this standard to establish the appropriate safety and
9、health practices and to determine the applicability of regulatorylimitations prior to its use. See Section 6 for specific safety precautions.2. Referenced Documents2.1 ASTM Standards:2C822 Terminology Relating to Concrete Pipe and Related ProductsC924 Practice for Testing Concrete Pipe Sewer Lines b
10、y Low-Pressure Air Test MethodC969 Practice for Infiltration and Exfiltration Acceptance Testing of Installed Precast Concrete Pipe Sewer LinesC1214 Test Method for Concrete Pipe Sewerlines by Negative Air Pressure (Vacuum) Test Method3. Terminology3.1 DefinitionsFor definitions of terms related to
11、precast concrete pipe, see Terminology C822.4. Summary of Test Method4.1 The pipe to be tested shall be sealed at the outer ends with suitable airtight bulkheads. The manufacturer shall choose touse either low-pressure air or negative pressure air (vacuum) test methods to evaluate the condition of t
12、he pipe before delivery.The change in the internal pressure during a specified time is used to determine the acceptability of the pipe.1 This test method is under the jurisdiction of ASTM Committee C13 on Concrete Pipe and is the direct responsibility of Subcommittee C13.09 on Methods of Test.Curren
13、t edition approved Feb. 1, 2013July 1, 2013. Published February 2013December 2013. Originally approved in 2005. Last previous edition approved in 20052013as C1618 05.C1618 05(2013). DOI: 10.1520/C1618-05R13.10.1520/C1618-13.2 For referencedASTM standards, visit theASTM website, www.astm.org, or cont
14、actASTM Customer Service at serviceastm.org. ForAnnual Book ofASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indication of what changes have been
15、made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be considered the official document.C
16、opyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States15. Significance and Use5.1 This is a quality control test performed at the manufacturing plant to establish that the finished, shippable pipe meets theleakage limits stated in the specifi
17、cations.6. Safety Precautions6.1 The user of this specification is advised of the following:6.1.1 This test may be dangerous if a pipe is not prepared properly and proper procedures are not followed.6.1.2 No one should be allowed near the ends of the pipe or test bulkheads during the test.7. Apparat
18、us7.1 For positive air pressure test, one bulkhead shall include a remote controlled valve that will release the internal test pressure.7.2 For the low-pressure air test, tie rods or an external test frame that is designed to resist the force caused by internal airpressure shall be used to restrain
19、the bulkheads. The low-pressure air test assembly shall be protected by a relief valve set to releaseat a pressure no greater than 6 psi. The bulkheads used for negative pressure air tests do not require external restraints.7.3 The pressure or vacuum pumps shall have adequate capacity to obtain the
20、required test pressure.7.4 The test pressure shall be measured with a gage or manometer that is precise enough to measure the increments of pressurechange specified by this standard.7.5 The pressure measuring devices shall be located in a safe area where they can be observed without danger to test p
21、ersonnel.8. Preparation of the Pipe8.1 Allow the test pipe to cool to ambient air temperature.NOTE 2A wetted pipe is desirable and will produce more consistent test results. Air may pass through the walls of dry pipe.8.2 The pipe joint shall be visually inspected for smoothness. The dimensions of th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC16182013STANDARDTESTMETHODFORCONCRETESANITARYSEWERPIPEBYNEGATIVEVACUUMORPOSITIVEAIRPRESSURE 使用 气压

链接地址:http://www.mydoc123.com/p-465316.html