《ASTM C1479-2016 Standard Practice for Installation of Precast Concrete Sewer Storm Drain and Culvert Pipe Using Standard Installations《使用标准设备安装预制混凝土下水道 暴雨下水道和涵管的标准实施规程》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1479-2016 Standard Practice for Installation of Precast Concrete Sewer Storm Drain and Culvert Pipe Using Standard Installations《使用标准设备安装预制混凝土下水道 暴雨下水道和涵管的标准实施规程》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1479 13C1479 16Standard Practice forInstallation of Precast Concrete Sewer, Storm Drain, andCulvert Pipe Using Standard Installations1This standard is issued under the fixed designation C1479; the number immediately following the designation indicates the year oforiginal adoption or, i
2、n the case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the installation of precast concrete pipe intended to be used
3、 for the conveyance of sewage, industrialwastes, and storm water and for the construction of culverts.1.2 This practice is the inch-pound companion to Practice C1479M; therefore, no SI equivalents are presented in this practice.1.3 This standard does not purport to address all of the safety concerns
4、, if any, associated with its use. It is the responsibilityof the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatorylimitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C822 Terminology Relating to Concrete Pipe and
5、 Related ProductsC1417 Specification for Manufacture of Reinforced Concrete Sewer, Storm Drain, and Culvert Pipe for Direct DesignC1479M Practice for Installation of Precast Concrete Sewer, Storm Drain, and Culvert Pipe Using Standard Installations(Metric)D698 Test Methods for Laboratory Compaction
6、Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kN-m/m3)D1557 Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700kN-m/m3)D2487 Practice for Classification of Soils for Engineering Purposes (Unified Soil Classification S
7、ystem)D2488 Practice for Description and Identification of Soils (Visual-Manual Procedure)IEEE/ASTM SI 10 Standard for Use of the International System of Units (SI): The Modern Metric System2.2 AASHTO Standards:3Standard Specifications for Highway BridgesM 145 Classification of Soils and SoilAggrega
8、te Mixtures for Highway Construction PurposesT 99 The Moisture-Density Relations of Soils Using a 5.5 lb (2.5 kg) Rammer and a 12-in. (305 mm) DropT 180 The Moisture-Density Relations of Soils Using a 10 lb (4.54 kg) Rammer and an 18-in. (457 mm) DropT 310 In-Place Density and Moisture Content of So
9、il and SoilAggregate by Nuclear Methods (Shallow Depth)2.3 ASCE Standards:4ASCE 15 Standard Practice for the Direct Design of Buried Precast Reinforced Concrete Pipe Using Standard Installations(SIDD)3. Terminology3.1 For definitions of terms relating to concrete pipe, see Terminology C822.3.2 For t
10、erminology related to soil classifications, see Practice D2487 and Practice D2488.3.3 For terminology and definitions of terms relating to structural design, see ASCE 15.1 This practice is under the jurisdiction of ASTM Committee C13 on Concrete Pipe and is the direct responsibility of Subcommittee
11、C13.05 on Special Projects.Current edition approved Feb. 1, 2013Oct. 15, 2016. Published February 2013October 2016. Originally approved in 2000. Last previous edition approved in 20122013as C1479 12.C1479 - 13. DOI: 10.1520/C1479-13.10.1520/C1479-16.2 For referencedASTM standards, visit theASTM webs
12、ite, www.astm.org, or contactASTM Customer Service at serviceastm.org. For Annual Book of ASTM Standardsvolume information, refer to the standards Document Summary page on the ASTM website.3 Available from American Association of State Highway and Transportation Officials (AASHTO), 444 N. Capitol St
13、., NW, Suite 249, Washington, DC 20001,http:/www.transportation.org.4 Available from American Society of Civil Engineers (ASCE), 1801 Alexander Bell Dr., Reston, VA 20191, http:/www.asce.org.This document is not an ASTM standard and is intended only to provide the user of an ASTM standard an indicat
14、ion of what changes have been made to the previous version. Becauseit may not be technically possible to adequately depict all changes accurately, ASTM recommends that users consult prior editions as appropriate. In all cases only the current versionof the standard as published by ASTM is to be cons
15、idered the official document.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United States13.4 Fig. 1 illustrates the definitions and limits of the terms: foundation, subgrade, bedding, outer bedding, middle bedding,haunch, lower side, backfill or
16、overfill, invert, crown, springline, top of pipe, and bottom of pipe as used in this practice.4. Significance and Use4.1 This practice is useful as a reference by an owner and the owners engineer in preparing project specifications.5. NotationsDi = inside diameter of pipe, in.Do = outside diameter o
17、f pipe, in.H = design height of earth above top of pipe, ft.w = unit weight of soil, lb/ft3.6. Standard Installations6.1 The precast concrete pipe/soil system shall be constructed to conform to the requirements of Figs. 2 and 3 and Tables 1 and2 as designated on the plans.7. Excavation7.1 When rock
18、or other unyielding foundation material is encountered, it shall be removed at least to the requirements shownin Figs. 2 and 3 and Tables 1 and 2. Overexcavated areas shall be backfilled with approved materials and compacted to at leastthe standard proctor density specified for the bedding.7.2 Where
19、 surface water or groundwater conditions exist, the site and trench shall be dewatered.FIG. 1 Pipe/Installation TerminologyC1479 162FIG. 2 Standard Embankment InstallationsNOTE 1Clearance between pipe and trench wall shall be adequate to enable specified compaction but not less than Do/6.FIG. 3 Stan
20、dard Trench InstallationsC1479 1638. Foundation8.1 The foundation shall be moderately firm to hard in situ soil, stabilized soil, or compacted fill material.8.2 When unsuitable or unstable material is encountered, the foundation shall be stabilized.8.3 Methods to prevent migration of soil fines shal
21、l be provided when groundwater or existing soil conditions are conduciveto particle migration. Gravelly soils, with little or no fines, could migrate under certain conditions, causing lack of support.8.4 Pipe installed over an unyielding foundation shall be cushioned so as to prevent blasting shock
22、when future blasting isanticipated in the area.9. Bedding9.1 The bedding shall be constructed uniformly over the full length of the pipe barrel, as required for the designated standardinstallation, to distribute the loadbearing reaction uniformly on the pipe barrel over its full length, and to maint
23、ain the required pipegrade. See Fig. 4. If placed in layers, the thickness of the layers shall be as required to achieve the specified compaction and asrequired by the project specifications.9.2 The bedding layers for standard installation Types 1, 2, and 3 shall be placed to be as uniform as possib
24、le, but shall beloosely placed uncompacted material under the middle third of the pipe prior to placement of the pipe.9.3 The maximum aggregate size shall be 1 in. when the bedding thickness is less than 6 in. and 112-in. when the beddingthickness is 6 in. or greater, except as noted in 9.4.9.4 When
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC14792016STANDARDPRACTICEFORINSTALLATIONOFPRECASTCONCRETESEWERSTORMDRAINANDCULVERTPIPEUSINGSTANDARDINSTALLATIONS

链接地址:http://www.mydoc123.com/p-464800.html